Back to bathroom remodel contractors
Interstate Restoration California Lp
- Based in
- Fort Worth
- On San Francisco permits
- Jan 2013 to Aug 2017
- Last 24 months
- 0 permits filed
49 permits since 2000: 38 completed, 8 never finaled, 3 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
7 bathroom remodel permits: 6 completed, 1 expired or cancelled. Typically 0 days from filing to permit and 152 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2016 | Completed final sign-off Apr 2016 | 990 Duncan St | water damage repair (bathroom drywall) 42 ft flood cuts, electrical plumbing sink and toilet, paint,new flooring,tape texture.Details
water damage repair (bathroom drywall) 42 ft flood cuts, electrical plumbing sink and toilet, paint,new flooring,tape texture. | $20,000 |
| Sep 23, 2014 | Completed final sign-off May 2015 | 840 California St | work in unit #21 & unit 22: kitchen bathroom remodel. new sink, toilet, new cabinets.Details
work in unit #21 & unit 22: kitchen bathroom remodel. new sink, toilet, new cabinets. | $58,000 |
| Mar 18, 2014 | Completed final sign-off Jan 2015 | 678 Geary St | building shell work for future t.i. work include first floor bathroom, remove and reconstruct (e) stair to basement, replace (e) fixtures @ basement restroom space, remove (e) soffits, level floors, patch and repair dry wall vacant space. t.i. under separate permit.Details
building shell work for future t.i. work include first floor bathroom, remove and reconstruct (e) stair to basement, replace (e) fixtures @ basement restroom space, remove (e) soffits, level floors, patch and repair dry wall vacant space. t.i. under separate permit. | $30,000 |
| Oct 28, 2013 | Completed final sign-off Apr 2014 | 54 Mcallister St | open walls in select area, in particular kitchens and bathrooms, to verify if electrical and plumbing is to code; what is not to code will be fixed. then we will patch the areas that were opened.Details
open walls in select area, in particular kitchens and bathrooms, to verify if electrical and plumbing is to code; what is not to code will be fixed. then we will patch the areas that were opened. | $60,000 |
| Oct 18, 2013 | Completed final sign-off Mar 2014 | 3345 18th St | enlarge current closet to become living room; remove non-structural walls, add framing, insulation, drywall. rewire and add outlets to code, install appliances (gas stove), change light fixtures. relocate hot water heater, rough plumbing for bathroom, replace kitchen sink. flooring and cabinetryDetails
enlarge current closet to become living room; remove non-structural walls, add framing, insulation, drywall. rewire and add outlets to code, install appliances (gas stove), change light fixtures. relocate hot water heater, rough plumbing for bathroom, replace kitchen sink. flooring and cabinetry | $22,000 |
| Oct 7, 2013 | Completed final sign-off Oct 2013 | 1755 Ofarrell St | drywall - elec - plumbing - insulation - flood repair in the units 303 - 403 - 503- 603-803 -903. no structural work. repair in hallways, living room and bathroom.Details
drywall - elec - plumbing - insulation - flood repair in the units 303 - 403 - 503- 603-803 -903. no structural work. repair in hallways, living room and bathroom. | $87,000 |
| Aug 22, 2013 | Expired or cancelled expired Nov 2021 | 205 Jones St | unit 002- fire repair- repair joist, floor sheathing and subfloor in bathroom; replace waste line and replace 3 angle steps; replace floor sheathing and subfloor in kitchen, also replace cabinets and countertop; repair plaster by using 5/8" drywall in b/f ceiling and bathroom as well.Details
unit 002- fire repair- repair joist, floor sheathing and subfloor in bathroom; replace waste line and replace 3 angle steps; replace floor sheathing and subfloor in kitchen, also replace cabinets and countertop; repair plaster by using 5/8" drywall in b/f ceiling and bathroom as well. | $26,000 |