Back to bathroom remodel contractors
International Fire Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to May 2026
- Last 24 months
- 61 permits filed
461 permits since 2000: 283 completed, 86 in progress, 82 never finaled, 10 expired or cancelled.
Of the 82 never-finaled permits, 21 are 3 to 5 years old, 37 are 5 to 10 years old, 24 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 3 completed, 1 never finaled. Typically 0 days from filing to permit and 669 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 27, 2017 | Never finaled issued Oct 2017, no final | 490 Post St | 4th floor in suite 430 & 446 - 1 (e) speaker/strobe will be relocate to new location & 1 new strobe will be installed in the bathroom, (n) devices will be tie-in to (e) power supply. ref pa 2016-0315-2119Details
4th floor in suite 430 & 446 - 1 (e) speaker/strobe will be relocate to new location & 1 new strobe will be installed in the bathroom, (n) devices will be tie-in to (e) power supply. ref pa 2016-0315-2119 | $2,000 |
| Jan 20, 2017 | Completed final sign-off Nov 2018 | 1251 Turk St | as built to app#201608266094. install monitor module to tie-in, 2 duct detectors and 2 fsd to extg control panel.install 4 strobes and 1 horn/strobe on the ground floor. replace strobes with horn/strobes in ada bathrooms.Details
as built to app#201608266094. install monitor module to tie-in, 2 duct detectors and 2 fsd to extg control panel.install 4 strobes and 1 horn/strobe on the ground floor. replace strobes with horn/strobes in ada bathrooms. | $3,000 |
| Aug 26, 2016 | Completed final sign-off Nov 2018 | 1251 Turk St | install new low freq notification appliances & smk det. inside ada rms. install strobes in the bathrooms inside ada rms. install new power supply panels & modules to supervised new notification circuits & tie-in to (e) control panel located on grnd flr 201403480984 201601165984Details
install new low freq notification appliances & smk det. inside ada rms. install strobes in the bathrooms inside ada rms. install new power supply panels & modules to supervised new notification circuits & tie-in to (e) control panel located on grnd flr 201403480984 201601165984 | $55,000 |
| Dec 3, 2013 | Completed final sign-off Jan 2014 | 2235 03rd St | install 6 upright sprinkler head & pipings, install 2 dry pendent to walk in cooler, install 2 sidewall sprinkler to existing bathroom. t.i. pa# 201307031087Details
install 6 upright sprinkler head & pipings, install 2 dry pendent to walk in cooler, install 2 sidewall sprinkler to existing bathroom. t.i. pa# 201307031087 | $4,000 |