Insight Construction Partners Inc
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2010 to Sep 2018
- Last 24 months
- 0 permits filed
33 permits since 2000: 24 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 2 completed, 2 never finaled. Typically 158 days from filing to permit and 338 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2018 | Never finaled issued Aug 2019, no final | 814 Noe St | renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry.Details
renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry. | $165,000 |
| Jan 23, 2014 | Never finaled issued Sep 2014, no final | 151 24th Av | enclose back stair landing at first flr for kitchen remodel. add deck & (n) stairs off kitchen. remodel third master bedroom flr and add dormers at third floor roof.Details
enclose back stair landing at first flr for kitchen remodel. add deck & (n) stairs off kitchen. remodel third master bedroom flr and add dormers at third floor roof. | $85,000 |
| May 15, 2013 | Completed final sign-off Mar 2015 | 619 Hayes St | add staircase from ground floor to 1st floor, add bathroom & office on ground floor. sprinkler office & hall @ ground floor per pre-application.Details
add staircase from ground floor to 1st floor, add bathroom & office on ground floor. sprinkler office & hall @ ground floor per pre-application. | $50,000 |
| Jan 30, 2013 | Completed final sign-off May 2013 | 264 Clipper St | new internal stair connection from upper unit to garage vestibule.Details
new internal stair connection from upper unit to garage vestibule. | $10,000 |