Back to bathroom remodel contractors
Insight Construction Partners Inc
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2010 to Sep 2018
- Last 24 months
- 0 permits filed
33 permits since 2000: 24 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
9 bathroom remodel permits: 7 completed, 2 never finaled. Typically 1 days from filing to permit and 260 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2018 | Never finaled issued Aug 2019, no final | 814 Noe St | renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry.Details
renovations to an (e) sfh converting sub-standard areas(ground flr garage) to (n) habitable space. a (n) foundation & slab w/ partial excavation & retaining for an 8'-0" ceiling height @ ground level. (n) media room w/ full bathroom @ground level. (n) interior stair to upper level entry. | $165,000 |
| Dec 26, 2017 | Completed final sign-off Nov 2020 | 1530 48th Av | new foundation (as needed) and new construction of (e) 1st floor as needed with (n) diving walls.replace bathroom and move kitchen in small rear addition. new second floor in location of (e) 2nd floor, 2 (n) bedroom and 1 (n) bathroom. comply with nov #201577572Details
new foundation (as needed) and new construction of (e) 1st floor as needed with (n) diving walls.replace bathroom and move kitchen in small rear addition. new second floor in location of (e) 2nd floor, 2 (n) bedroom and 1 (n) bathroom. comply with nov #201577572 | $210,000 |
| Feb 8, 2016 | Completed final sign-off Oct 2016 | 323 21st Av | repair dry rot and water damage in ext. walls and floor of bathroom. all dry rot to be repaired in-kind in walls and floor. no other framing work.Details
repair dry rot and water damage in ext. walls and floor of bathroom. all dry rot to be repaired in-kind in walls and floor. no other framing work. | $9,000 |
| Jan 27, 2016 | Completed final sign-off Oct 2016 | 323 21st Av | remodel (e) bathroom, replace fixtures and finishesDetails
remodel (e) bathroom, replace fixtures and finishes | $15,000 |
| Jul 22, 2015 | Completed final sign-off Apr 2016 | 44 Dawnview Wy | remodel two existing bathrooms. no change to floor plan. no walls to be moved. no structural. no change to building envelope.Details
remodel two existing bathrooms. no change to floor plan. no walls to be moved. no structural. no change to building envelope. | $9,000 |
| Oct 31, 2013 | Completed final sign-off Mar 2015 | 619 Hayes St | remodel kitchen on 1st floor, remodel bathroom on 2nd floor. no work on garage levelDetails
remodel kitchen on 1st floor, remodel bathroom on 2nd floor. no work on garage level | $18,000 |
| Aug 27, 2013 | Never finaled issued Sep 2013, no final | 3417 18th St | revision to app#201307252801. permit for mechanical ventilation of ada bathroom approved under seperate permit.Details
revision to app#201307252801. permit for mechanical ventilation of ada bathroom approved under seperate permit. | $200 |
| Jul 25, 2013 | Completed final sign-off Sep 2013 | 3417 18th St | this is a revision to app#201210313197 for an accessible bathroom located in the garage accessible through duc lot supermarket. mep under separate permit.Details
this is a revision to app#201210313197 for an accessible bathroom located in the garage accessible through duc lot supermarket. mep under separate permit. | $10,000 |
| May 15, 2013 | Completed final sign-off Mar 2015 | 619 Hayes St | add staircase from ground floor to 1st floor, add bathroom & office on ground floor. sprinkler office & hall @ ground floor per pre-application.Details
add staircase from ground floor to 1st floor, add bathroom & office on ground floor. sprinkler office & hall @ ground floor per pre-application. | $50,000 |