Insight Construction Partners Inc
- Based in
- Mill Valley
- On San Francisco permits
- Oct 2010 to Sep 2018
- Last 24 months
- 0 permits filed
33 permits since 2000: 24 completed, 8 never finaled, 1 expired or cancelled.
Of the 8 never-finaled permits, 1 is 5 to 10 years old, 7 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 122 days from filing to permit and 468 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2015 | Completed final sign-off Oct 2016 | 3636 Webster St | to comply w/ nov 201493443.remove sloped solarum window&planter on n.e. side of same rear projection&extend(e)deck out(approx 3')to (e)east wall. remove small deck,add window at g/fl of projection in the south wall&add walkable skylite on (e) deck. maher ord n/a.Details
to comply w/ nov 201493443.remove sloped solarum window&planter on n.e. side of same rear projection&extend(e)deck out(approx 3')to (e)east wall. remove small deck,add window at g/fl of projection in the south wall&add walkable skylite on (e) deck. maher ord n/a. | $1,000 |
| Sep 30, 2014 | Expired or cancelled revoked Aug 2015 | 3636 Webster St | to comply with nov #201493443. add two eindows, a skylight, a door, and replace railing at existing pop-out and existing deck. repair roof & deck as required.Details
to comply with nov #201493443. add two eindows, a skylight, a door, and replace railing at existing pop-out and existing deck. repair roof & deck as required. | $8,000 |
| Aug 15, 2014 | Completed final sign-off Oct 2016 | 3636 Webster St | repair 2nd floor deck at back of building with dryrot in perimeter less than 50% constructionDetails
repair 2nd floor deck at back of building with dryrot in perimeter less than 50% construction | $8,000 |
| Jan 23, 2014 | Never finaled issued Sep 2014, no final | 151 24th Av | enclose back stair landing at first flr for kitchen remodel. add deck & (n) stairs off kitchen. remodel third master bedroom flr and add dormers at third floor roof.Details
enclose back stair landing at first flr for kitchen remodel. add deck & (n) stairs off kitchen. remodel third master bedroom flr and add dormers at third floor roof. | $85,000 |