Innovative Construction Implement
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Aug 2024
- Last 24 months
- 0 permits filed
144 permits since 2000: 100 completed, 34 never finaled, 10 expired or cancelled.
Of the 34 never-finaled permits, 3 are 3 to 5 years old, 24 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
12 stairs permits: 11 completed, 1 never finaled. Typically 46 days from filing to permit and 321 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 14, 2023 | Completed final sign-off May 2024 | 1563 Underwood Av | enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind.Details
enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind. | $100,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2023 | 588 12th Av | 1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124.Details
1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124. | $45,000 |
| Mar 12, 2021 | Completed final sign-off Feb 2022 | 485 23rd Av | rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall.Details
rev to pa201809241148 s1. upgragde structural according to (e) field condition. change proposed strong walls to new steel ordinary frames at front of bldg and repair (e) foundation along gridline 1 on 1/f. redesign interior staircase. relocate kitchen at 1/f. relocate rear stair, add retaining wall. | $18,000 |
| Feb 18, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bathDetails
reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bath | $200,000 |
| Jan 28, 2021 | Completed final sign-off Mar 2021 | 2791 16th St | install handrail from ground floor to 2nd floor at entrance staircase.Details
install handrail from ground floor to 2nd floor at entrance staircase. | $2,000 |
| Jan 11, 2021 | Completed final sign-off Feb 2021 | 3000 23rd Av | main entrance landing only on 2/f level - repair leaking foyer, proposed to remove and replcae (e) floor, floor tiles and cement with new water proofing membrane at (e) foyer, approv 5ft x 4ft. no stair work.Details
main entrance landing only on 2/f level - repair leaking foyer, proposed to remove and replcae (e) floor, floor tiles and cement with new water proofing membrane at (e) foyer, approv 5ft x 4ft. no stair work. | $7,200 |
| Nov 25, 2020 | Completed final sign-off Jan 2022 | 5 Encline Ct | 1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891Details
1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891 | $280,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2022 | 1234 40th Av | add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard.Details
add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard. | $150,000 |
| Jul 8, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation.Details
remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation. | $13,000 |
| Mar 13, 2020 | Completed final sign-off Sep 2020 | 1211 Brussels St | repair and replace (e) rear deck and add new stair case connection between deckDetails
repair and replace (e) rear deck and add new stair case connection between deck | $8,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2019 | 59 Paulding St | add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor.Details
add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor. | $80,000 |
| May 13, 2016 | Never finaled issued Jun 2016, no final | 778 34th Av | revision to pa 2015-1230-6155, to add (n) roof deck and new interior entry stair, minor layout change to ground floorDetails
revision to pa 2015-1230-6155, to add (n) roof deck and new interior entry stair, minor layout change to ground floor | $32,000 |