Back to bathroom remodel contractors
Innovative Construction Implement
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Aug 2024
- Last 24 months
- 0 permits filed
144 permits since 2000: 100 completed, 34 never finaled, 10 expired or cancelled.
Of the 34 never-finaled permits, 3 are 3 to 5 years old, 24 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
65 bathroom remodel permits: 52 completed, 10 never finaled, 3 expired or cancelled. Typically 7 days from filing to permit and 358 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 12, 2024 | Completed final sign-off Oct 2024 | 325 Leavenworth St | unit #2b: cosmetic remodel like-to-like all rooms due to deterioration & mold. no window replacement and structural work involved. bathroom & kitchen new plumbing and lighting fixtures.Details
unit #2b: cosmetic remodel like-to-like all rooms due to deterioration & mold. no window replacement and structural work involved. bathroom & kitchen new plumbing and lighting fixtures. | $5,000 |
| Jun 14, 2023 | Completed final sign-off May 2024 | 1563 Underwood Av | enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind.Details
enclose (e) garage with fire rated walls. add (n) bedroom with wic, convert (e) poweder to (n) bathroom, relocate wet bar in (e) ent. room and relocate mech equipment on 1/f. remove walls for open kitchen, dining, living room and add (n) open railing on 2/f. repair rear stairs in-kind. | $100,000 |
| Apr 3, 2023 | Completed final sign-off Sep 2024 | 1943 Jennings St | 2 new bedrooms, 1 new media, 2 new closets, 1 new bathroom on g/f per lans. reolcoate (e) laundry machines, wash basin, tank water heater and havac into the parking ggarage plan planDetails
2 new bedrooms, 1 new media, 2 new closets, 1 new bathroom on g/f per lans. reolcoate (e) laundry machines, wash basin, tank water heater and havac into the parking ggarage plan plan | $70,000 |
| Jan 17, 2023 | Expired or cancelled cancelled Feb 2023 | 1 Chicago Wy | remodel (e) 1 kitchen (120 sf) & 1 bathroom (50 sf) with new countertop, new appliances, new plumbing fixtures in same layout, all work in-link-kind. no layout or wall modifications/changes.Details
remodel (e) 1 kitchen (120 sf) & 1 bathroom (50 sf) with new countertop, new appliances, new plumbing fixtures in same layout, all work in-link-kind. no layout or wall modifications/changes. | $38,000 |
| Oct 12, 2022 | Completed final sign-off Dec 2022 | 329 25th Av | remodel kitchen & bathroom on 2/f unit 2. like to like, new kitchen counter, new appliances. new plumbing fixtures. all work in unit #2 only.Details
remodel kitchen & bathroom on 2/f unit 2. like to like, new kitchen counter, new appliances. new plumbing fixtures. all work in unit #2 only. | $80,000 |
| Oct 12, 2022 | Completed final sign-off Jul 2024 | 1926 42nd Av | comply w/ 2021-012253enf: legalize the (e) bedroom, living room, bathroom and laundry on g/f. remove the roof shade above rear deck. remove one (e) shed at rear yard.Details
comply w/ 2021-012253enf: legalize the (e) bedroom, living room, bathroom and laundry on g/f. remove the roof shade above rear deck. remove one (e) shed at rear yard. | $50,000 |
| Jul 22, 2022 | Completed final sign-off Mar 2024 | 72 Moneta Wy | remodel (e) kitchen & bathroom all in-kind. no change in (e) layout/ wall modification.electrical upgrade to main level & g/f with h.e. lights. remove (e) wall & ceiling plaster for electrical installation/upgrade remove and patch only. remoev (e) fireplace insert in living room & patch.Details
remodel (e) kitchen & bathroom all in-kind. no change in (e) layout/ wall modification.electrical upgrade to main level & g/f with h.e. lights. remove (e) wall & ceiling plaster for electrical installation/upgrade remove and patch only. remoev (e) fireplace insert in living room & patch. | $35,000 |
| Jun 13, 2022 | Completed final sign-off Oct 2024 | 1319 Brussels St | remodel (e) bathroom & ktichen. no change in layout/wall demo/modfications. electrical upgrade to main level and g/f with h.e. lights; remove (e) wall and ceiling plaster for electrical upgrade and installationg to ocmly w/ cec - patch and replace. remove (e) fireplace insert in living room & patch.Details
remodel (e) bathroom & ktichen. no change in layout/wall demo/modfications. electrical upgrade to main level and g/f with h.e. lights; remove (e) wall and ceiling plaster for electrical upgrade and installationg to ocmly w/ cec - patch and replace. remove (e) fireplace insert in living room & patch. | $35,000 |
| Jan 24, 2022 | Completed final sign-off Mar 2024 | 531 20th Av | rev to pa202109138254. infill 1/f at rear.add 1 entertainment, 1 play room with wet bar and 1 bathroom and 1 mech room on 1/f. relocate and remodel (e) kitchen & living room on 2/f. add 1 powder room & 1 storage on 2/f. convert (e) bedrooms into a master bedroom on 3/f.new deck less than 10ft gradeDetails
rev to pa202109138254. infill 1/f at rear.add 1 entertainment, 1 play room with wet bar and 1 bathroom and 1 mech room on 1/f. relocate and remodel (e) kitchen & living room on 2/f. add 1 powder room & 1 storage on 2/f. convert (e) bedrooms into a master bedroom on 3/f.new deck less than 10ft grade | $340,000 |
| Jan 24, 2022 | Completed final sign-off Feb 2023 | 588 12th Av | rev to pa202106243178: replace side p.l. window glazing only (exist. frame to remain). filling (e) storage room at rear on 1/f. relocate bathroom, replace 6 front window. new master bath layout plumbing fixture locations,remove 1 skylight on 3/fDetails
rev to pa202106243178: replace side p.l. window glazing only (exist. frame to remain). filling (e) storage room at rear on 1/f. relocate bathroom, replace 6 front window. new master bath layout plumbing fixture locations,remove 1 skylight on 3/f | |
| Nov 19, 2021 | Completed final sign-off Jan 2022 | 8400 Oceanview Tr | apt 220: remodel kitchen like to like including new appliances. remodel bathroom with new fixtures. retile kitchen & bathroom. no structural work.Details
apt 220: remodel kitchen like to like including new appliances. remodel bathroom with new fixtures. retile kitchen & bathroom. no structural work. | $16,000 |
| Oct 27, 2021 | Never finaled issued Nov 2021, no final | 2258 25th Av | structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size.Details
structural rev to pa202109208771. remove structural beam. reconfigure bathroom vanity location. remove structural beams, reconfigure bathroom vanity location & window size. | |
| Sep 20, 2021 | Completed final sign-off Mar 2022 | 2258 25th Av | infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area.Details
infill at g/f underneath (e) cantiliver structure on 2/f. relocate the (e) bathroom on (e) g/f. turn the (e) bedroom into entertainment area. | $40,000 |
| Sep 13, 2021 | Completed final sign-off Mar 2024 | 531 20th Av | remodel 1 bathroom & 1 kitchen. no change in layout. electrical upgrade to main slevel and g/f with h.e. lights; remove (e) wall sheetrock and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace). remove (e) fireplace insert in living roomDetails
remodel 1 bathroom & 1 kitchen. no change in layout. electrical upgrade to main slevel and g/f with h.e. lights; remove (e) wall sheetrock and ceiling plaster for electrical upgrade and installation to comply with current energy code (patch & replace). remove (e) fireplace insert in living room | $20,000 |
| Jun 24, 2021 | Completed final sign-off Feb 2023 | 588 12th Av | 1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124.Details
1/f: infill at rear per plans, add 1 family with wet bar,1 bathroom,1 guestroom,1laundry room on 1/f. relocate/remodel (e) kitchen with open design on 2/f & convert (e) bathroom to powderoom. reconfigure stair to code. convert bathroom to master, add 1 bathroom on 3/f.rev to pa202106102124. | $45,000 |
| Jun 21, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height.Details
rev pa202102184908: update structural plan acording to (e) conditions. relocated (e) bedroom and add 1 new bathroom, 1 wet bar on 1/f per plan. revised rear deck layout per plan. no change in height. | $10,000 |
| Jun 10, 2021 | Expired or cancelled cancelled Feb 2023 | 588 12th Av | remodel (e) kitchen & bathroom. no change in layout or mod of walls.electrical upgrade to maimn level, upper level and garage floor with h.e. lights. remove plaster from (e) walls and ceilings for electrical upgrade and install insulation with current energy code and replace in-kind.Details
remodel (e) kitchen & bathroom. no change in layout or mod of walls.electrical upgrade to maimn level, upper level and garage floor with h.e. lights. remove plaster from (e) walls and ceilings for electrical upgrade and install insulation with current energy code and replace in-kind. | $22,000 |
| Apr 15, 2021 | Completed final sign-off Jun 2021 | 56 Mason St | room 310: install folding ada chair with grab bar in bathroom. provide & install appriopated blocking in support of added grab bars & related features. maher n/aDetails
room 310: install folding ada chair with grab bar in bathroom. provide & install appriopated blocking in support of added grab bars & related features. maher n/a | $1,200 |
| Mar 30, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | remodel (e) bathroom & kitchen on 2/f & 3/f. new coutner tops & cabinet at kitchen rea. electrical upgrade to main level and 3/f with h.e lights. remove (e) wall plaster and ceiling plaster for electrical upgrade and installtion to comply with current energy code.Details
remodel (e) bathroom & kitchen on 2/f & 3/f. new coutner tops & cabinet at kitchen rea. electrical upgrade to main level and 3/f with h.e lights. remove (e) wall plaster and ceiling plaster for electrical upgrade and installtion to comply with current energy code. | $30,000 |
| Feb 18, 2021 | Completed final sign-off Jun 2022 | 459 24th Av | reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bathDetails
reconfigure (e) interior staircase at foyer area, remodel (e) bathroom, laundry, entertainment area on 1st fl. per plan, add one new office, bedroom and game room on 1st fl. new rear pato, remove walls between living, dining, kitchen, add master 2 bathroom and 1 closet, remodel 2nd fl. bath | $200,000 |
| Nov 25, 2020 | Completed final sign-off Jan 2022 | 5 Encline Ct | 1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891Details
1/f: underpinning of foundation, 200amp panel, window dimension updates; storage underneath stairs; shear wall addition. 2/f: fireplce replacement; ceiling struture re-enforcements on joist; juliet balcony to bedroom 1; bathroom 1 sizing update & door addition. revision to 2019-0321-5891 | $280,000 |
| Nov 19, 2020 | Completed final sign-off Jul 2022 | 1234 40th Av | add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard.Details
add (n) mech room & laundry on 1/f. enlarge/remodel (e) interior stairscase & remodel (e) bathroom on 1/f. add new master bathroom, 1 powder room, relocate kitchen on 2/f per plans. add new wooden deck on 2/f with staircase to the rear yard. | $150,000 |
| Sep 17, 2020 | Completed final sign-off Jun 2021 | 56 Mason St | install handicap grab bars at bathroom for units 206 & unit 310. maher n/a.Details
install handicap grab bars at bathroom for units 206 & unit 310. maher n/a. | $1,000 |
| Aug 13, 2020 | Completed final sign-off Jul 2024 | 1355 Minna St | to comply with complaints 202027525/202026711/202026791. repair and replace sheetrock at (e) bathroom due to water damange. all work in-kind.Details
to comply with complaints 202027525/202026711/202026791. repair and replace sheetrock at (e) bathroom due to water damange. all work in-kind. | $3,000 |
| Jul 8, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation.Details
remodel extg staircase to comply with code, create new hall on 1st floor, remodel garage, create separate laundry room, remodel extg family room, guest room and half bath into new family room, home office, 2 baths. convert extg dinning room into bedroom on 2nd floor. replace foundation. | $13,000 |
| Jul 1, 2020 | Completed final sign-off Jan 2021 | 555 Bright St | legalize as build family room, bathroom, guest room and entertaiment room on g/f per plan.Details
legalize as build family room, bathroom, guest room and entertaiment room on g/f per plan. | $20,000 |
| Jun 30, 2020 | Completed final sign-off Jan 2021 | 513 Lyon St | to comply with nov20209022: remodel (e) ktichen, dining room, powder room and bathroom on 2/f per plans.Details
to comply with nov20209022: remodel (e) ktichen, dining room, powder room and bathroom on 2/f per plans. | $10,000 |
| Jun 8, 2020 | Never finaled issued Jun 2020, no final | 785 Brannan St | unit 205 & unit 310: each unit: install handicap grab bars at bathroom showers to comply with chapter 11b cbc. grab bars min. load rating of 250 lbs. maher n/a.Details
unit 205 & unit 310: each unit: install handicap grab bars at bathroom showers to comply with chapter 11b cbc. grab bars min. load rating of 250 lbs. maher n/a. | $1,000 |
| Jun 8, 2020 | Completed final sign-off Aug 2020 | 74 06th St | replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a.Details
replace a total of (26) 90-min fire rated metal doors with frame in existing locations, in-kind, on floors 2-5 to all trash rooms and bathroom rooms in common/public areas in hallways. maher n/a. | $30,000 |
| Feb 27, 2020 | Completed final sign-off Nov 2021 | 201 Chicago Wy | remove & replace all baseboard door casing on 2n fl. reside existing bathroom (floor & wall) replace new hardwood floor on 2nd fl. bathroom fixtues to remain, 800 sqftDetails
remove & replace all baseboard door casing on 2n fl. reside existing bathroom (floor & wall) replace new hardwood floor on 2nd fl. bathroom fixtues to remain, 800 sqft | $5,000 |
| Feb 27, 2020 | Completed final sign-off Apr 2021 | 1344 Goettingen St | replace old kitchen cabinets, 10x10 replace new tiles for kitchen counter top, remodel bathroom tiles, replace some sheet rock all work for 2nd fl onlyDetails
replace old kitchen cabinets, 10x10 replace new tiles for kitchen counter top, remodel bathroom tiles, replace some sheet rock all work for 2nd fl only | $6,000 |
| Dec 3, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213.Details
ref variance 2020-003283var 10/2/2020: lower level: excavation under (e) deck for (n) bedroom,closet,bathroom & office.2/f:renovate (e) bath and closet,add (n) laundry,replace doors to (e) bedrooms, add 3 skylights in (e) hall. electrical and plumbing work as req. rev to pa201903014213. | $47,500 |
| Jul 11, 2019 | Completed final sign-off Feb 2020 | 300 03rd St | remodel two (e) bathrooms, retile, replace cabinets, replace fixtures to remain in all (e) locations. add led lights in (e) bathroom and gfci receptaclesDetails
remodel two (e) bathrooms, retile, replace cabinets, replace fixtures to remain in all (e) locations. add led lights in (e) bathroom and gfci receptacles | $36,000 |
| Jun 3, 2019 | Completed final sign-off Jan 2022 | 2050 Alemany Bl | convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan.Details
convert extg laundry area to one entertainment room. add one bathroom and 1 laundry room at 1st floor per plan. add one new bedroom. remodel extg kitchen on 2nd floor per plan. | $12,000 |
| Apr 26, 2019 | Completed final sign-off Jul 2021 | 1506 Innes Av | adu ordinance #162-16, propose 1 living rm, 1 storage rm, 1 bathroom, 2 bedrooms, 1 kitchen on 1st floor, comply w/ nov 201847851.Details
adu ordinance #162-16, propose 1 living rm, 1 storage rm, 1 bathroom, 2 bedrooms, 1 kitchen on 1st floor, comply w/ nov 201847851. | $80,000 |
| Mar 21, 2019 | Completed final sign-off Jan 2022 | 5 Encline Ct | rooms down & interior remodeling. lower flr remodel incl 1 bed, 1 bath, new layout. add 1 (n) bedroom, 1 (n) bath, (n) laundry, reduced garage. upper flr incl remodel kitchen & bath w/ (n) layouts, 1 bedroom. add 2 windows at lower flr, 3 windows become doors.Details
rooms down & interior remodeling. lower flr remodel incl 1 bed, 1 bath, new layout. add 1 (n) bedroom, 1 (n) bath, (n) laundry, reduced garage. upper flr incl remodel kitchen & bath w/ (n) layouts, 1 bedroom. add 2 windows at lower flr, 3 windows become doors. | $300,000 |
| Mar 5, 2019 | Completed final sign-off Jun 2019 | 59 Paulding St | add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor.Details
add 1 new guest room, one play room, one bathroom on 1st floor per plan. add 1 nw bedroom, 1 bathroom, one closet remodel kitchen on 2nd floor. relocate extg staircase. create nw interior connection between 1st and 2nd floor. | $80,000 |
| Mar 1, 2019 | Completed final sign-off Aug 2023 | 196 Urbano Dr | conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen.Details
conversion of (e) basement space to living space by way of excavation. converted space to include (n) family room, bathroom, study. remodel (e) 1st flr kitchen. | $164,000 |
| Jan 24, 2019 | Completed final sign-off Sep 2019 | 746 Andover St | 1/f: create 1 new laundry room, mechanical room, covert (e) storage to one playroom & one study with full bathroom. create interior connection between the 1/f & 2/f per plan. foundation upgrade on 1/f.Details
1/f: create 1 new laundry room, mechanical room, covert (e) storage to one playroom & one study with full bathroom. create interior connection between the 1/f & 2/f per plan. foundation upgrade on 1/f. | $80,000 |
| Dec 19, 2018 | Completed final sign-off Sep 2019 | 746 Andover St | repair damage vinly shingle south side of bldg below windows bay area. repair damage roof shingle approx 5 ft by 5 ft like to like. remove and replace all interior . install 5 new led recessed light at existing bedroom. retile the existing bathroom at main floor. replace one floor drain at existingDetails
repair damage vinly shingle south side of bldg below windows bay area. repair damage roof shingle approx 5 ft by 5 ft like to like. remove and replace all interior . install 5 new led recessed light at existing bedroom. retile the existing bathroom at main floor. replace one floor drain at existing | $4,800 |
| Sep 18, 2018 | Never finaled issued Sep 2018, no final | 2201 19th Av | 1)remove all extg baseboard on 2nd level,remove all interior wall papers and apply wall finish paint. 2)remove and replace kitchen floor tile. no electrical and plumbing work. 3)replace door casing at extg bedroom and bathroom.Details
1)remove all extg baseboard on 2nd level,remove all interior wall papers and apply wall finish paint. 2)remove and replace kitchen floor tile. no electrical and plumbing work. 3)replace door casing at extg bedroom and bathroom. | $3,500 |
| Jul 16, 2018 | Completed final sign-off Mar 2021 | 329 Prague St | interior alteration to 2/f per plans: add 1 new storage, 2 bathrooms, and 1 closet. add new deck at the rear on the 2nd floor plan. add one new skylight on 2nd flr per planDetails
interior alteration to 2/f per plans: add 1 new storage, 2 bathrooms, and 1 closet. add new deck at the rear on the 2nd floor plan. add one new skylight on 2nd flr per plan | $20,000 |
| Mar 26, 2018 | Never finaled issued Mar 2018, no final | 1426 42nd Av | 1)add one game room, one entertainment room, one wet bar, 1 bathroom, & relocate laundry machines on 1st flr per plan. 2)add new exterior wooden deck at rear. 3)kitchen remodel, add 1 bathroom, 1 office and relocate dining ara on 2nd flr per plan.Details
1)add one game room, one entertainment room, one wet bar, 1 bathroom, & relocate laundry machines on 1st flr per plan. 2)add new exterior wooden deck at rear. 3)kitchen remodel, add 1 bathroom, 1 office and relocate dining ara on 2nd flr per plan. | $100,000 |
| Feb 26, 2018 | Never finaled issued Feb 2018, no final | 170 Pacific Av | suite #35 - add 1 new bathroom, 2 closets, 1 powder and 1 laundry room, on the 1st flr. add 2 new bathrooms and 2 new closets on 2nd flr. remove (e) walls at kitchen and remodel kitchen on 1ast flr maher naDetails
suite #35 - add 1 new bathroom, 2 closets, 1 powder and 1 laundry room, on the 1st flr. add 2 new bathrooms and 2 new closets on 2nd flr. remove (e) walls at kitchen and remodel kitchen on 1ast flr maher na | $48,000 |
| Aug 23, 2017 | Never finaled issued Aug 2017, no final | 555 Bright St | (1) repair roof down spout at rear of building. (2) retile (e) kitchen area & bath area with new tiles on 2nd level. (3) reove and replace wooden siding at rear of house approximatly 5 ft by 6 ft. (4) remove and replace baseboard at living roomDetails
(1) repair roof down spout at rear of building. (2) retile (e) kitchen area & bath area with new tiles on 2nd level. (3) reove and replace wooden siding at rear of house approximatly 5 ft by 6 ft. (4) remove and replace baseboard at living room | $2,600 |
| Jul 7, 2017 | Completed final sign-off Apr 2018 | 345 Vicksburg St | renovation to existing bath and kitchen on the 3rd fl. new receptacles at existing lving rm and bedrm. replace light fix, high eff led per plan. replace all windows within remodeled units 3rd fl per plan. new insulation at ceiling within remodel unit 3rd fl, no structural modificationDetails
renovation to existing bath and kitchen on the 3rd fl. new receptacles at existing lving rm and bedrm. replace light fix, high eff led per plan. replace all windows within remodeled units 3rd fl per plan. new insulation at ceiling within remodel unit 3rd fl, no structural modification | $20,000 |
| Jun 22, 2017 | Completed final sign-off Sep 2019 | 207 06th Av | revision to #201608185438. to reconfigure bathroom fixture on ground fl per plan, reconfigure closet area on 3rd fl per plan. relocate & change bathroom to powder room. add water heater. relocate skylights. remove (e) area at bedroom and not to build dormer at attic fl.Details
revision to #201608185438. to reconfigure bathroom fixture on ground fl per plan, reconfigure closet area on 3rd fl per plan. relocate & change bathroom to powder room. add water heater. relocate skylights. remove (e) area at bedroom and not to build dormer at attic fl. | |
| Jun 14, 2017 | Completed final sign-off Oct 2017 | 2534 45th Av | 1/f- add one new bedroom, one entertainment room, one bathroom, one family room and one mechanical room. add new deck at rear yard. 2/f- convert (e) bedroom into master bathroom, relocate (e) bathroom and new powder room, new fireplace and remodel kitchen.Details
1/f- add one new bedroom, one entertainment room, one bathroom, one family room and one mechanical room. add new deck at rear yard. 2/f- convert (e) bedroom into master bathroom, relocate (e) bathroom and new powder room, new fireplace and remodel kitchen. | $35,000 |
| Apr 28, 2017 | Never finaled issued Sep 2020, no final | 304 Orizaba Av | legalize 2nd dwelling unit at 1/f of (e) single family dwelling unit per unit legalization ordinance (ord 43-14). 1st fl: (3) bedrooms, 1 media rm, (1) kitchen, (1) family room, (1) powder room, (4) full bathrooms.Details
legalize 2nd dwelling unit at 1/f of (e) single family dwelling unit per unit legalization ordinance (ord 43-14). 1st fl: (3) bedrooms, 1 media rm, (1) kitchen, (1) family room, (1) powder room, (4) full bathrooms. | $2,000 |
| Nov 3, 2016 | Completed final sign-off Sep 2017 | 233 Somerset St | add 1 bedroom, 1 family room 2 full bathrooms & laundry on (e) ground floorDetails
add 1 bedroom, 1 family room 2 full bathrooms & laundry on (e) ground floor | $68,000 |
| Aug 31, 2016 | Completed final sign-off Jan 2017 | 3615 Moraga St | add 1 new master bedroom, 1 entertainment rm, 1 storage and 1 new bath on 1st fl per plan. upgrade exist elec to 125 amp, repaint exist exterior wall at eastDetails
add 1 new master bedroom, 1 entertainment rm, 1 storage and 1 new bath on 1st fl per plan. upgrade exist elec to 125 amp, repaint exist exterior wall at east | $50,000 |
| Aug 18, 2016 | Completed final sign-off Sep 2019 | 207 06th Av | 1)add two bedrrroms, two bathrooms and one family room on attic floor per plan. 2) add three new skylight and two dormer at attic floor.Details
1)add two bedrrroms, two bathrooms and one family room on attic floor per plan. 2) add three new skylight and two dormer at attic floor. | $50,000 |
| Jul 22, 2016 | Completed final sign-off May 2017 | 1511 30th Av | revision to ref pa 201606160167 to reconfigure bathroom fixture location. relocate door opening at exercise room. relocate washer/dryer & storage on 1st flr.Details
revision to ref pa 201606160167 to reconfigure bathroom fixture location. relocate door opening at exercise room. relocate washer/dryer & storage on 1st flr. | |
| Jul 15, 2016 | Completed final sign-off Sep 2016 | 1819 26th Av | revision to pa #201603111822 - to reconfigure bathroom fixtures, relocate door opening at powder room on 1st floor per plan.Details
revision to pa #201603111822 - to reconfigure bathroom fixtures, relocate door opening at powder room on 1st floor per plan. | |
| Jun 24, 2016 | Completed final sign-off Sep 2019 | 207 06th Av | add 1 new laundry room, one media room, one entertainment and one half bathroom on 1st floor per plan.Details
add 1 new laundry room, one media room, one entertainment and one half bathroom on 1st floor per plan. | $40,000 |
| Jun 16, 2016 | Completed final sign-off May 2017 | 1511 30th Av | add 1 new guest room, 1 entertainment room, 1 exercise rm, 2 baths on 1st fl per planDetails
add 1 new guest room, 1 entertainment room, 1 exercise rm, 2 baths on 1st fl per plan | $6,000 |
| Jan 25, 2016 | Expired or cancelled expired Jul 2021 | 571 Myra Wy | add 4 new skylights on 3/f, add one new bathroom, one new closet and one new entertainment room on 1/f, relocate existing water heater and furnace @ garage on 1/f, add 2 new bathroom and one new closet on 3/f. repair existing damaged foundation & garden retaining wall at rear per plan.Details
add 4 new skylights on 3/f, add one new bathroom, one new closet and one new entertainment room on 1/f, relocate existing water heater and furnace @ garage on 1/f, add 2 new bathroom and one new closet on 3/f. repair existing damaged foundation & garden retaining wall at rear per plan. | $40,000 |
| Dec 30, 2015 | Completed final sign-off Aug 2018 | 778 34th Av | convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd.Details
convert 1st floor to habitable living space. infill south lightwell at 1st & 2nd floor. int. remodel incl. kitchen & 5 baths. replace all extg window, add new window. include fire rated prop line windw & nw skylights. new retaining wall and landscaping in rear yard. struct/elec/plmg as req'd. | $270,000 |
| Nov 30, 2015 | Never finaled issued Nov 2015, no final | 571 Myra Wy | repair foundation at rear of garage in-kind partial repair. replace exterior siding at rear of poperty with in-kind at west. reile (e) bathroom on 2/f. repair roof lead at (e) skylight area on roof.Details
repair foundation at rear of garage in-kind partial repair. replace exterior siding at rear of poperty with in-kind at west. reile (e) bathroom on 2/f. repair roof lead at (e) skylight area on roof. | $9,000 |
| Jun 22, 2015 | Never finaled issued Oct 2019, no final | 522 Vienna St | horizontal addition. add 1-entertainment room, 1-storage room on 1st fl. remodel bathrm on 1st fl per plan. add 2-bedrm, 1-bathrm & 1-family room on 2nd fl. remodel (e) kitchen on 2nd fl per plan. add (n) deck on 2nd fl. add study room, 3-office on attic, add 1-full bath on attic.Details
horizontal addition. add 1-entertainment room, 1-storage room on 1st fl. remodel bathrm on 1st fl per plan. add 2-bedrm, 1-bathrm & 1-family room on 2nd fl. remodel (e) kitchen on 2nd fl per plan. add (n) deck on 2nd fl. add study room, 3-office on attic, add 1-full bath on attic. | $90,000 |
| Oct 7, 2013 | Completed final sign-off Jul 2014 | 453 Ralston St | add 1 bedroom, 3 baths, great room, mud room and 3 storage rooms on 1st fl per planDetails
add 1 bedroom, 3 baths, great room, mud room and 3 storage rooms on 1st fl per plan | $40,000 |
| Sep 17, 2013 | Completed final sign-off Mar 2016 | 75 Navajo Av | add a bedroom and relocate bath on 1st fl per plan to comply with nov 201304881.Details
add a bedroom and relocate bath on 1st fl per plan to comply with nov 201304881. | $48,000 |
| Feb 5, 2013 | Completed final sign-off Jul 2013 | 435 Athens St | convert existing storage room to one bath room and add one bedroom on 1st floor per plan & two storage rooms.Details
convert existing storage room to one bath room and add one bedroom on 1st floor per plan & two storage rooms. | $18,000 |
| Jan 31, 2013 | Never finaled issued Jan 2013, no final | 451 24th Av | retile bath floor on 2/f, common bath at unit #2 to comply with sfbc 2304.11.4.2Details
retile bath floor on 2/f, common bath at unit #2 to comply with sfbc 2304.11.4.2 | $2,800 |
| Nov 13, 2012 | Completed final sign-off Jan 2013 | 1600 Shafter Av | convert (e) storage room to 1 bedroom, 1 bathroom, 2 storage rooms & 1 mud room on garage level. also add 1 powder roomDetails
convert (e) storage room to 1 bedroom, 1 bathroom, 2 storage rooms & 1 mud room on garage level. also add 1 powder room | $50,000 |