Back to pergola or trellis contractors
Innovative Construction Implement
- Based in
- San Francisco
- On San Francisco permits
- Nov 2012 to Aug 2024
- Last 24 months
- 0 permits filed
144 permits since 2000: 100 completed, 34 never finaled, 10 expired or cancelled.
Of the 34 never-finaled permits, 3 are 3 to 5 years old, 24 are 5 to 10 years old, 7 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for pergola or trellis across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Pergola or trellis permits
1 pergola or trellis permit: 1 completed. Typically 5 days from filing to permit and 610 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2022 | Completed final sign-off Mar 2024 | 531 20th Av | comply with nov 202292225: legalize the pergola at rear yard with 11ftx9ft and 8ft max from finished grade per plan, the two rear yard retaining walls were pre-(e per photo provided on sheet a1.2. one new retaining wall less than 4 feet with no permit required.Details
comply with nov 202292225: legalize the pergola at rear yard with 11ftx9ft and 8ft max from finished grade per plan, the two rear yard retaining walls were pre-(e per photo provided on sheet a1.2. one new retaining wall less than 4 feet with no permit required. | $10,000 |