Infinite Construction
- Based in
- Richmond
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 5 permits filed
31 permits since 2000: 16 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
8 stairs permits: 3 completed, 2 in progress, 3 never finaled. Typically 18 days from filing to permit and 143 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 22, 2024 | Completed final sign-off Dec 2024 | 352 Ashton Av | to comply with complaint #202429063 (1): repair or replace the loose stair treads and loose gaurddrails (less than 50%).Details
to comply with complaint #202429063 (1): repair or replace the loose stair treads and loose gaurddrails (less than 50%). | $1,500 |
| Sep 18, 2024 | In progress issued Oct 2024 | 126 Miramar Av | to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electricalDetails
to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electrical | $1,580 |
| Apr 4, 2024 | In progress issued Apr 2024 | 1153 Pacific Av | like for like bathroom remodeling. convert (e) space under stairs into (n) powder room. add (n) electrical main panel from 100a to 150a. main panel is in the garage with u/g connection to the pge box.Details
like for like bathroom remodeling. convert (e) space under stairs into (n) powder room. add (n) electrical main panel from 100a to 150a. main panel is in the garage with u/g connection to the pge box. | $35,000 |
| Oct 14, 2022 | Completed final sign-off Mar 2023 | 126 Miramar Av | comply with nov# 202290147: replace and repairs wnidows- street facing: replace gutter: replace and repair roof:replace and repair in kind deck and stair less than 50%Details
comply with nov# 202290147: replace and repairs wnidows- street facing: replace gutter: replace and repair roof:replace and repair in kind deck and stair less than 50% | $18,000 |
| Jul 2, 2019 | Never finaled issued Aug 2020, no final | 8 Phoenix Tr | exterior changes to (e) single family home. new work consists of (n) rear yard stair, enclosing 3rd fl porch to create sunroom, roof access hatch to (n) roof deck. (n) lighting is incorporated.Details
exterior changes to (e) single family home. new work consists of (n) rear yard stair, enclosing 3rd fl porch to create sunroom, roof access hatch to (n) roof deck. (n) lighting is incorporated. | $10,000 |
| Apr 26, 2019 | Never finaled issued Feb 2020, no final | 8 Phoenix Tr | interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof.Details
interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof. | $200,000 |
| Nov 25, 2014 | Completed final sign-off Mar 2016 | 1458 43rd Av | legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor.Details
legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor. | $10,000 |
| Sep 22, 2014 | Never finaled issued Sep 2014, no final | 1034 Pacific Av | patch & repair the 2 stairs, interior courtyard, total of work not to exceed 50% of stair structure.Details
patch & repair the 2 stairs, interior courtyard, total of work not to exceed 50% of stair structure. | $5,000 |