Back to bathroom remodel contractors
Infinite Construction
- Based in
- Richmond
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 5 permits filed
31 permits since 2000: 16 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 8 completed, 2 in progress, 3 never finaled, 1 expired or cancelled. Typically 8 days from filing to permit and 196 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Sep 18, 2024 | In progress issued Oct 2024 | 126 Miramar Av | to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electricalDetails
to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electrical | $1,580 |
| Apr 4, 2024 | In progress issued Apr 2024 | 1153 Pacific Av | like for like bathroom remodeling. convert (e) space under stairs into (n) powder room. add (n) electrical main panel from 100a to 150a. main panel is in the garage with u/g connection to the pge box.Details
like for like bathroom remodeling. convert (e) space under stairs into (n) powder room. add (n) electrical main panel from 100a to 150a. main panel is in the garage with u/g connection to the pge box. | $35,000 |
| Feb 2, 2023 | Completed final sign-off Feb 2023 | 126 Miramar Av | revision permit# 2022-1014-4438: repair front windows no replacement: no bathroom replacementDetails
revision permit# 2022-1014-4438: repair front windows no replacement: no bathroom replacement | |
| Oct 14, 2022 | Completed final sign-off Feb 2023 | 126 Miramar Av | replace back winows 2 to comply 202294510 and 3 side windows. 1 bathroom window and 1 kitchen windowDetails
replace back winows 2 to comply 202294510 and 3 side windows. 1 bathroom window and 1 kitchen window | $5,500 |
| Aug 12, 2022 | Expired or cancelled expired Jun 2025 | 2821 Noriega St | remove (e) wall btw kitchen, dining & family rms. remodel & reconfigure kitchen. like for like 2 bathrooms remodeling (invisible from st). replace windows & doors @ lower fl rear of bldg & upper fl kitchen. replace furnace, install sub panel @ upper fl.Details
remove (e) wall btw kitchen, dining & family rms. remodel & reconfigure kitchen. like for like 2 bathrooms remodeling (invisible from st). replace windows & doors @ lower fl rear of bldg & upper fl kitchen. replace furnace, install sub panel @ upper fl. | $65,000 |
| Apr 26, 2019 | Never finaled issued Feb 2020, no final | 8 Phoenix Tr | interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof.Details
interior remodel- new work consists of converting an uninhabited 1st fl to a workroom with storage and bathroom. 2nd fl remodel kithchen , half bath and new stairs to 1st fl, 3rd fl remodel bathroom, new master bath, laundry and closet, new stair to roof. | $200,000 |
| Feb 16, 2016 | Completed final sign-off Aug 2016 | 66 Cleary Ct | unit #1504: to an extg residential unit: new kitchen and bath cabinets, fixtures an appliance are proposed. no changes to exterior or interior walls or windows.Details
unit #1504: to an extg residential unit: new kitchen and bath cabinets, fixtures an appliance are proposed. no changes to exterior or interior walls or windows. | $15,000 |
| Jan 22, 2016 | Completed final sign-off Nov 2016 | 852 33rd Av | #852: kitchen & 1.5 bath remodel only. no changes to footprint of exterior modifications. add 2 plumbing fixtures. removal & creation of non bearing walls.Details
#852: kitchen & 1.5 bath remodel only. no changes to footprint of exterior modifications. add 2 plumbing fixtures. removal & creation of non bearing walls. | $25,000 |
| Oct 19, 2015 | Never finaled issued Nov 2015, no final | 802 Potrero Av | kitchen remodel for top floor unit. remove 2 window at enclosed porch maher na; expand 1(e) bath and add 1(n) bath.Details
kitchen remodel for top floor unit. remove 2 window at enclosed porch maher na; expand 1(e) bath and add 1(n) bath. | $25,000 |
| Sep 16, 2015 | Completed final sign-off Jun 2016 | 1373 03rd Av | 1)move garage door back to provide person door. 2) renovations of basement level rooms behind garage. 3) new powder room on 1st floor and new bathroom on 2nd floor. ref app#9614783.Details
1)move garage door back to provide person door. 2) renovations of basement level rooms behind garage. 3) new powder room on 1st floor and new bathroom on 2nd floor. ref app#9614783. | $100,000 |
| Apr 7, 2015 | Completed final sign-off Nov 2016 | 850 33rd Av | remodel kitchen and bathroom in unit 850 33rd ave. removal of non-structural walls. no exterior modification or addtional sq ft.Details
remodel kitchen and bathroom in unit 850 33rd ave. removal of non-structural walls. no exterior modification or addtional sq ft. | $40,000 |
| Feb 9, 2015 | Never finaled issued Feb 2015, no final | 66 Cleary Ct | replacement of tub and valves, new vanity and faucets, replacement of tub tiles and bathroom floorsDetails
replacement of tub and valves, new vanity and faucets, replacement of tub tiles and bathroom floors | $10,500 |
| Nov 25, 2014 | Completed final sign-off Mar 2016 | 1458 43rd Av | legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor.Details
legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor. | $10,000 |
| Nov 21, 2013 | Completed final sign-off Mar 2014 | 30 Quickstep Ln | #5- remodel existing codo, new kitchen cabinets, lighting & replace bathroom tub & valves. no structural work.Details
#5- remodel existing codo, new kitchen cabinets, lighting & replace bathroom tub & valves. no structural work. | $12,000 |