Block 1758, lot 013
1373 03rd Ave
- City’s use
- Single Family Residential
- Built
- 1909
- Stories
- 2
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,750 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Dec 12, 2018 | Never finaled issued Dec 2018, no final | 1373 03rd Av | Jemico Llc Dba Renewal By Andersen Of Sf | wood composite fibrex windows (7) in total, 6 at front elevation (2nd floor), 1 at rear elevation (1st floor). replacing existing wood. all like for like.Details
wood composite fibrex windows (7) in total, 6 at front elevation (2nd floor), 1 at rear elevation (1st floor). replacing existing wood. all like for like. | $13,633 |
| Sep 16, 2015 | Completed final sign-off Jun 2016 | 1373 03rd Av | Infinite Construction | 1)move garage door back to provide person door. 2) renovations of basement level rooms behind garage. 3) new powder room on 1st floor and new bathroom on 2nd floor. ref app#9614783.Details
1)move garage door back to provide person door. 2) renovations of basement level rooms behind garage. 3) new powder room on 1st floor and new bathroom on 2nd floor. ref app#9614783. | $100,000 |
| May 19, 2011 | Completed final sign-off May 2012 | 1373 03rd Av | bathroom remodeling: change out tub/toilet/vanity/light fixtures/new tile surround & new tile floor. second floor front bathroom.Details
bathroom remodeling: change out tub/toilet/vanity/light fixtures/new tile surround & new tile floor. second floor front bathroom. | $8,500 | |
| May 18, 2011 | Expired or cancelled cancelled Jan 2026 | 1373 03rd Av | bathroom remodeling-change out tub, toilet, vanity, light fixtures, new tile surround & new tile floor. 2nd floor front bathroomDetails
bathroom remodeling-change out tub, toilet, vanity, light fixtures, new tile surround & new tile floor. 2nd floor front bathroom | $9,037 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.