Back to kitchen remodel contractors
Infinite Construction
- Based in
- Richmond
- On San Francisco permits
- Apr 2012 to Jul 2026
- Last 24 months
- 5 permits filed
31 permits since 2000: 16 completed, 6 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 8 completed, 2 in progress, 1 never finaled, 1 expired or cancelled. Typically 4 days from filing to permit and 144 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 15, 2026 | In progress issued Jul 2026 | 152 Berry St | kitchen remodel, provide handwash sink and replacement of range and hood.Details
kitchen remodel, provide handwash sink and replacement of range and hood. | $60,000 |
| Sep 18, 2024 | In progress issued Oct 2024 | 126 Miramar Av | to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electricalDetails
to comply with nov #202424682 from item #1 to #9 repair ground floor side gate and faming, repair entrance gate, repair hand/ guardrails, deck and stairs,repair 2nd fl rear exit door, repair deteriorated interior base of upstairs bathroom, sink cabinet, replace kitchen exhaust fan, repair electrical | $1,580 |
| Oct 14, 2022 | Completed final sign-off Feb 2023 | 126 Miramar Av | replace back winows 2 to comply 202294510 and 3 side windows. 1 bathroom window and 1 kitchen windowDetails
replace back winows 2 to comply 202294510 and 3 side windows. 1 bathroom window and 1 kitchen window | $5,500 |
| Aug 12, 2022 | Expired or cancelled expired Jun 2025 | 2821 Noriega St | remove (e) wall btw kitchen, dining & family rms. remodel & reconfigure kitchen. like for like 2 bathrooms remodeling (invisible from st). replace windows & doors @ lower fl rear of bldg & upper fl kitchen. replace furnace, install sub panel @ upper fl.Details
remove (e) wall btw kitchen, dining & family rms. remodel & reconfigure kitchen. like for like 2 bathrooms remodeling (invisible from st). replace windows & doors @ lower fl rear of bldg & upper fl kitchen. replace furnace, install sub panel @ upper fl. | $65,000 |
| Sep 28, 2020 | Completed final sign-off Nov 2020 | 153 Parker Av | install new cabinet in kitchen, new appliances/new flooring, repair plumbing & change outletsDetails
install new cabinet in kitchen, new appliances/new flooring, repair plumbing & change outlets | $21,000 |
| Feb 16, 2016 | Completed final sign-off Aug 2016 | 66 Cleary Ct | unit #1504: to an extg residential unit: new kitchen and bath cabinets, fixtures an appliance are proposed. no changes to exterior or interior walls or windows.Details
unit #1504: to an extg residential unit: new kitchen and bath cabinets, fixtures an appliance are proposed. no changes to exterior or interior walls or windows. | $15,000 |
| Jan 22, 2016 | Completed final sign-off Nov 2016 | 852 33rd Av | #852: kitchen & 1.5 bath remodel only. no changes to footprint of exterior modifications. add 2 plumbing fixtures. removal & creation of non bearing walls.Details
#852: kitchen & 1.5 bath remodel only. no changes to footprint of exterior modifications. add 2 plumbing fixtures. removal & creation of non bearing walls. | $25,000 |
| Oct 19, 2015 | Never finaled issued Nov 2015, no final | 802 Potrero Av | kitchen remodel for top floor unit. remove 2 window at enclosed porch maher na; expand 1(e) bath and add 1(n) bath.Details
kitchen remodel for top floor unit. remove 2 window at enclosed porch maher na; expand 1(e) bath and add 1(n) bath. | $25,000 |
| Apr 7, 2015 | Completed final sign-off Nov 2016 | 850 33rd Av | remodel kitchen and bathroom in unit 850 33rd ave. removal of non-structural walls. no exterior modification or addtional sq ft.Details
remodel kitchen and bathroom in unit 850 33rd ave. removal of non-structural walls. no exterior modification or addtional sq ft. | $40,000 |
| Nov 25, 2014 | Completed final sign-off Mar 2016 | 1458 43rd Av | legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor.Details
legalize unit @ ground floor per ordinance 43-14. remodel bath, relocate kitchenette, rebuild stair to 2nd floor, add (n) bedroom for main unit @ ground floor. | $10,000 |
| Jun 4, 2014 | Completed final sign-off Sep 2014 | 66 Cleary Ct | demo (e) kitchen cabinets. reinstall new cabinets & new counter/suite & faucet. no change on walls.Details
demo (e) kitchen cabinets. reinstall new cabinets & new counter/suite & faucet. no change on walls. | $8,900 |
| Nov 21, 2013 | Completed final sign-off Mar 2014 | 30 Quickstep Ln | #5- remodel existing codo, new kitchen cabinets, lighting & replace bathroom tub & valves. no structural work.Details
#5- remodel existing codo, new kitchen cabinets, lighting & replace bathroom tub & valves. no structural work. | $12,000 |