Ideal Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Aug 2026
- Last 24 months
- 12 permits filed
57 permits since 2000: 46 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
9 stairs permits: 6 completed, 1 in progress, 2 expired or cancelled. Typically 38 days from filing to permit and 222 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 30, 2025 | Completed final sign-off Mar 2026 | 76 Gaviota Wy | revision to bpa 202412106524: repair in kind interior stairs less than 50% repair.Details
revision to bpa 202412106524: repair in kind interior stairs less than 50% repair. | $2,000 |
| Dec 10, 2024 | In progress issued May 2025 | 76 Gaviota Wy | demolish (e) interior stair. at 1st flr adding 806 sqft, remodel (e) space to bedroom full bathroom, (n) family, laundry and enclose (e) foyer w/(n) dppr at 2nd flr, remodel (e) kitchen and bath. infill (e) lightwell over (e) exterior stair, new powder room and lightwell.Details
demolish (e) interior stair. at 1st flr adding 806 sqft, remodel (e) space to bedroom full bathroom, (n) family, laundry and enclose (e) foyer w/(n) dppr at 2nd flr, remodel (e) kitchen and bath. infill (e) lightwell over (e) exterior stair, new powder room and lightwell. | $182,000 |
| Mar 16, 2021 | Completed final sign-off May 2021 | 513 30th St | in kind exterior stair repair. less than 50% of front stairwayDetails
in kind exterior stair repair. less than 50% of front stairway | $10,000 |
| Jan 7, 2021 | Completed final sign-off Apr 2021 | 932 Sanchez St | replacement in-kind of dry-rotted exterior front entry stair. replace front entry soffit light fixture. provide new electrical outlet and door bell/camera wiring at front entry porch.Details
replacement in-kind of dry-rotted exterior front entry stair. replace front entry soffit light fixture. provide new electrical outlet and door bell/camera wiring at front entry porch. | $25,000 |
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 333 Dellbrook Av | remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnaceDetails
remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnace | $145,000 |
| Apr 9, 2019 | Completed final sign-off Mar 2020 | 273 Andover St | renovation of interior kitchen, 2 beds, 2 baths, (n) habitable space at lower level for home office, (n) non-habitalbe storage & (n) laundry area. replace existing stair at rear yard w/ similar.Details
renovation of interior kitchen, 2 beds, 2 baths, (n) habitable space at lower level for home office, (n) non-habitalbe storage & (n) laundry area. replace existing stair at rear yard w/ similar. | $100,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 1391 06th Av | kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same.Details
kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same. | $110,000 |
| Sep 28, 2017 | Expired or cancelled expired Apr 2023 | 2086 46th Av | inkind replacement of tile on existing stairs. work is visible from street.Details
inkind replacement of tile on existing stairs. work is visible from street. | $3,500 |
| Mar 25, 2013 | Completed final sign-off May 2016 | 12 Sanchez St | work to be at common area. the proposed project will demolish deteriorating, non-code compliant existing rear egress stair. replacement code-compliant egress stair. proposed 465 s.f. roof deck accessed via proposed replacement stair.Details
work to be at common area. the proposed project will demolish deteriorating, non-code compliant existing rear egress stair. replacement code-compliant egress stair. proposed 465 s.f. roof deck accessed via proposed replacement stair. | $30,000 |