Back to bathroom remodel contractors
Ideal Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Aug 2026
- Last 24 months
- 12 permits filed
57 permits since 2000: 46 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
21 bathroom remodel permits: 17 completed, 3 in progress, 1 expired or cancelled. Typically 27 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 18, 2026 | In progress issued Apr 2026 | 1193 Noe St | addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet..Details
addition of 8x8 dormer @ n/e corner of roof complying w/ 2ab #3. dormer adds approx. 64 sf of living area converting a portion of deeded storage to a new full bath. new access to deeded storage provided in primary bedroom. cosmetic remodel of (e) bathroom; replace laundry window + door; new closet.. | $200,000 |
| Feb 13, 2026 | Completed final sign-off May 2026 | 568 Belvedere St | replace tiles, sheetrock, shower controls for bathroom.Details
replace tiles, sheetrock, shower controls for bathroom. | $30,000 |
| Oct 2, 2025 | In progress issued Dec 2025 | 571 Monterey Bl | upper floor - kitchen and bathroom remodel. removal of powder room. lower floor - bathroom remodel. removal of kitchenette and replace with laundry closet.Details
upper floor - kitchen and bathroom remodel. removal of powder room. lower floor - bathroom remodel. removal of kitchenette and replace with laundry closet. | $400,000 |
| Dec 10, 2024 | In progress issued May 2025 | 76 Gaviota Wy | demolish (e) interior stair. at 1st flr adding 806 sqft, remodel (e) space to bedroom full bathroom, (n) family, laundry and enclose (e) foyer w/(n) dppr at 2nd flr, remodel (e) kitchen and bath. infill (e) lightwell over (e) exterior stair, new powder room and lightwell.Details
demolish (e) interior stair. at 1st flr adding 806 sqft, remodel (e) space to bedroom full bathroom, (n) family, laundry and enclose (e) foyer w/(n) dppr at 2nd flr, remodel (e) kitchen and bath. infill (e) lightwell over (e) exterior stair, new powder room and lightwell. | $182,000 |
| Jun 28, 2024 | Expired or cancelled cancelled Nov 2024 | 560 Hill St | kitchen & 1 bathroom remodel in kindDetails
kitchen & 1 bathroom remodel in kind | $125,000 |
| Jun 7, 2024 | Completed final sign-off Jun 2026 | 2118 44th Av | remodel of e) residence w/ e) bldg vulume. 464 sf of n) conditioned floor area converted from e) garage. level 1: new bedroom, bathroom, office. replacement of 1 window & 1 door on level 1. 2 windows on level 2. new stucco at rear facade, associated structure, mech, plumbing, electrical workDetails
remodel of e) residence w/ e) bldg vulume. 464 sf of n) conditioned floor area converted from e) garage. level 1: new bedroom, bathroom, office. replacement of 1 window & 1 door on level 1. 2 windows on level 2. new stucco at rear facade, associated structure, mech, plumbing, electrical work | $45,000 |
| Apr 19, 2024 | Completed final sign-off Jan 2025 | 2011 Oak St | rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head.Details
rev to pa# 2024-0117-4076; reconfiguration of 2 existing bathrooms in one of 4 units, new windows in lightwell, level kitchen floor and reinstall existing cabintry, removal of one bathroom sink and shower head. | |
| Apr 1, 2024 | Completed final sign-off May 2024 | 73 Germania St | bath to be replaced by shower and toilet to be moved 3ft, min. 30" clearance. install bathroom fan. shower pan.Details
bath to be replaced by shower and toilet to be moved 3ft, min. 30" clearance. install bathroom fan. shower pan. | $18,000 |
| Jan 26, 2024 | Completed final sign-off Jan 2025 | 2259 15th St | kitchen & main bath remodel.removing wall between kitchen and dining.reconfiguring current laundy room door.moving current water heater to the basement level.Details
kitchen & main bath remodel.removing wall between kitchen and dining.reconfiguring current laundy room door.moving current water heater to the basement level. | $120,000 |
| Jan 17, 2024 | Completed final sign-off Jan 2025 | 2011 Oak St | two in-kind bathrooms and one kitchen in-kind. no exterior work.Details
two in-kind bathrooms and one kitchen in-kind. no exterior work. | $120,000 |
| Aug 15, 2023 | Completed final sign-off Apr 2024 | 52 Sharon St | (n) windows for top only, wood facing street, vinyl facing rear. bath and kitchen renovation, removal of one sink in bath.Details
(n) windows for top only, wood facing street, vinyl facing rear. bath and kitchen renovation, removal of one sink in bath. | $80,000 |
| May 4, 2022 | Completed final sign-off Jan 2023 | 1382 06th Av | 2nd fl remodel including remodeled kitchen & relocated half bath, and removal of (e) fire place. 3rd fl interior remodel including remodeled bathroom, new primary bathroom & closet. replace 4 windows (front facing) windows & rear patio door.Details
2nd fl remodel including remodeled kitchen & relocated half bath, and removal of (e) fire place. 3rd fl interior remodel including remodeled bathroom, new primary bathroom & closet. replace 4 windows (front facing) windows & rear patio door. | $200,000 |
| Jan 28, 2022 | Completed final sign-off Apr 2022 | 280 Lily St | unit b. replace/remodel full bathroom in kind. non structural.Details
unit b. replace/remodel full bathroom in kind. non structural. | $20,000 |
| Mar 9, 2021 | Completed final sign-off Jun 2021 | 950 Teresita Bl | in kind full bathroom remodel. no change in layout of walls & openings.Details
in kind full bathroom remodel. no change in layout of walls & openings. | $20,000 |
| Jan 29, 2021 | Completed final sign-off Oct 2021 | 2123 Bush St | interior kitchen and bathroom remodel in upper unti #1 only. includeds plumbing and electrical work.Details
interior kitchen and bathroom remodel in upper unti #1 only. includeds plumbing and electrical work. | $205,880 |
| Sep 9, 2020 | Completed final sign-off Oct 2023 | 620 Belvedere St | remodel 3 bathrooms in kind (basement bath ~5'x8, kids bath ~7'x8'-6", master bath~ 6'x11'). replace all finishes. no change in layout.Details
remodel 3 bathrooms in kind (basement bath ~5'x8, kids bath ~7'x8'-6", master bath~ 6'x11'). replace all finishes. no change in layout. | $75,000 |
| Aug 6, 2020 | Completed final sign-off Jun 2021 | 2519 Polk St | kitchen inkind remodel. bathroom inkind remodelDetails
kitchen inkind remodel. bathroom inkind remodel | $60,000 |
| Jun 12, 2020 | Completed final sign-off Oct 2020 | 946 Teresita Bl | convert (e) closet into a powder room (1/2 bathroom), enclose light well on 2nd floor.Details
convert (e) closet into a powder room (1/2 bathroom), enclose light well on 2nd floor. | $10,000 |
| May 28, 2020 | Completed final sign-off Oct 2020 | 946 Teresita Bl | renovate (e) kitchen & bathroom. all work in-kind.Details
renovate (e) kitchen & bathroom. all work in-kind. | $35,000 |
| Apr 9, 2019 | Completed final sign-off Mar 2020 | 273 Andover St | renovation of interior kitchen, 2 beds, 2 baths, (n) habitable space at lower level for home office, (n) non-habitalbe storage & (n) laundry area. replace existing stair at rear yard w/ similar.Details
renovation of interior kitchen, 2 beds, 2 baths, (n) habitable space at lower level for home office, (n) non-habitalbe storage & (n) laundry area. replace existing stair at rear yard w/ similar. | $100,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 1391 06th Av | kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same.Details
kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same. | $110,000 |