Ideal Builders
- Based in
- San Francisco
- On San Francisco permits
- Mar 2013 to Aug 2026
- Last 24 months
- 12 permits filed
57 permits since 2000: 46 completed, 3 in progress, 4 never finaled, 4 expired or cancelled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 3 completed, 1 expired or cancelled. Typically 198 days from filing to permit and 323 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 17, 2026 | Completed final sign-off Oct 2026 | 1485 Church St | repair dry rot on rear deck. less than 50% repairs. located in lightwell, non-street facing deck.Details
repair dry rot on rear deck. less than 50% repairs. located in lightwell, non-street facing deck. | $21,000 |
| Sep 29, 2021 | Completed final sign-off Aug 2023 | 2123 Bush St | convert rear detached studio space to (n) garage at rear of building and extend and renovate rear deck.Details
convert rear detached studio space to (n) garage at rear of building and extend and renovate rear deck. | $100,000 |
| Mar 3, 2020 | Expired or cancelled cancelled Jan 2026 | 333 Dellbrook Av | remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnaceDetails
remodel of ground fl to retain 1 car garage, master bedrm, office, laundry & closet; new deck w/spiral staircase on 1st fl; replace 1 window & 1 patio door at deck on 1st fl; convert 1 non-bearing full height wall to low wall at main floor. re-use (e) hot water heater & furnace | $145,000 |
| Mar 6, 2018 | Completed final sign-off Nov 2019 | 1391 06th Av | kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same.Details
kitchen & bath remodel/addition on 2nd fl. rear addition @ garage @ 1st fl (n) foundation & shed roof @ area of (n) work. (n) wood deck & stair. (n) electrical & plumbing @ area of (n) work. 1/2 bath @ upper level, toilet count remains the same. | $110,000 |