Hough Construction
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Jun 2022
- Last 24 months
- 0 permits filed
223 permits since 2000: 189 completed, 13 never finaled, 21 expired or cancelled.
Of the 13 never-finaled permits, 3 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
19 stairs permits: 14 completed, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 110 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 7, 2019 | Never finaled issued Nov 2020, no final | 2530 Vallejo St | remodel & minor addition to (e) 4-story w/ garage single fam dwelling: minor reconfiguration of 3rd flr, sunroom in rear of bldg; create (n) 80 sf roof deck on 4th flr in rear of bldg; (2)(n) spiral staircases in rear:1) up to (n) 4th flr roof deck & down to rear yard from 3rd flr balcony.Details
remodel & minor addition to (e) 4-story w/ garage single fam dwelling: minor reconfiguration of 3rd flr, sunroom in rear of bldg; create (n) 80 sf roof deck on 4th flr in rear of bldg; (2)(n) spiral staircases in rear:1) up to (n) 4th flr roof deck & down to rear yard from 3rd flr balcony. | $22,000 |
| Feb 3, 2016 | Completed final sign-off Feb 2016 | 2735 Clay St | replace all damaged wooden members in exterior stair and deck at rear wall of building.use pt lumber, comply with sf city building code minimum requirements less 50%.Details
replace all damaged wooden members in exterior stair and deck at rear wall of building.use pt lumber, comply with sf city building code minimum requirements less 50%. | $17,000 |
| Dec 2, 2014 | Completed final sign-off Feb 2016 | 2858 Vallejo St | interior remodel of single family including relocation of existing groudn floor bathroom and stair.Details
interior remodel of single family including relocation of existing groudn floor bathroom and stair. | $19,000 |
| Nov 25, 2014 | Completed final sign-off Jan 2016 | 2858 Vallejo St | removal of existing ground floor stair / landing in rear & replacement with a new deck (10' x 10') & stairs.Details
removal of existing ground floor stair / landing in rear & replacement with a new deck (10' x 10') & stairs. | $4,500 |
| Jun 5, 2014 | Completed final sign-off Jun 2015 | 1164 Alabama St | repair/replace "in - kind" all dry rot in siding, stairs and landing assembly at rear of property.Details
repair/replace "in - kind" all dry rot in siding, stairs and landing assembly at rear of property. | $11,750 |
| Aug 9, 2012 | Completed final sign-off Oct 2012 | 119 Joost Av | removal of dry rotted exterior stair down to rear yard. new layout stair/landing to rear yardDetails
removal of dry rotted exterior stair down to rear yard. new layout stair/landing to rear yard | $6,500 |
| Feb 27, 2012 | Completed final sign-off Dec 2012 | 1980 Hayes St | voluntary replacement in kind of required rear exit stair (2nd means of egress) with minor code adjustments to tread/riser sizeDetails
voluntary replacement in kind of required rear exit stair (2nd means of egress) with minor code adjustments to tread/riser size | $11,000 |
| Dec 5, 2011 | Completed final sign-off Dec 2011 | 1183 Vallejo St | repair dry rot in rear stair assemblyDetails
repair dry rot in rear stair assembly | $3,800 |
| Jun 6, 2011 | Completed final sign-off Aug 2011 | 178 Haight St | interior remodel of unit at 176 haight st. relocation of (e) kitch to create 2nd bedrm, creation of powder rm under stair, removal of (e) brick chimneyDetails
interior remodel of unit at 176 haight st. relocation of (e) kitch to create 2nd bedrm, creation of powder rm under stair, removal of (e) brick chimney | $30,000 |
| Feb 9, 2011 | Completed final sign-off Mar 2011 | 2076 Grove St | correct faulty foundation grades, partial laterial load bracing of 1st floor level with 4 steel omf frames, remove unbraced brick chimney to roof level, replace with braced metal flue, repair in kind, dry rot damaged rear stair membersDetails
correct faulty foundation grades, partial laterial load bracing of 1st floor level with 4 steel omf frames, remove unbraced brick chimney to roof level, replace with braced metal flue, repair in kind, dry rot damaged rear stair members | $45,000 |
| Sep 22, 2010 | Completed final sign-off Oct 2011 | 1871 Green St | addition to south wall of 3rd floor over (e) floor below, removal of (e) non bearing partition & contruction of (n) bathroom on 3rd floor; revision to (e) deck at 3rd floor. (n) non brg partition alterations on 2nd floor & relocation of stair from (e) deck to rear yard. reconstruciton of (e) wall atDetails
addition to south wall of 3rd floor over (e) floor below, removal of (e) non bearing partition & contruction of (n) bathroom on 3rd floor; revision to (e) deck at 3rd floor. (n) non brg partition alterations on 2nd floor & relocation of stair from (e) deck to rear yard. reconstruciton of (e) wall at | $89,000 |
| Dec 7, 2009 | Completed final sign-off Jun 2010 | 201 Upper Tr | interior remodel of 201 upper terrace by new stairs to (e) garage space. convert to family room, bedroom, laundry & bathroom. building currently has 4 parking spaces with this remodel is has 2. replacement windows throughoutDetails
interior remodel of 201 upper terrace by new stairs to (e) garage space. convert to family room, bedroom, laundry & bathroom. building currently has 4 parking spaces with this remodel is has 2. replacement windows throughout | $35,000 |
| Sep 13, 2007 | Never finaled issued Sep 2007, no final | 2814 Pine St | raise foundation height as per drawing (1'-0" max.) by lewis w. bulter architect. location at front stair and nw corner rear of the property line (approx. 10'-0" in length each)Details
raise foundation height as per drawing (1'-0" max.) by lewis w. bulter architect. location at front stair and nw corner rear of the property line (approx. 10'-0" in length each) | $7,500 |
| Jul 10, 2006 | Never finaled issued Jul 2006, no final | 543 Garfield St | dry rot repairs to stucco banister & stairs. replace in kind. less than 50% of stairs. replace in kind.Details
dry rot repairs to stucco banister & stairs. replace in kind. less than 50% of stairs. replace in kind. | $9,500 |
| Nov 30, 2005 | Completed final sign-off Jan 2006 | 86 St Marys Av | existing concrete stairway at front, replace in kind. repair wood stairs at front in kind.Details
existing concrete stairway at front, replace in kind. repair wood stairs at front in kind. | $25,000 |
| Jul 1, 2004 | Completed final sign-off Oct 2004 | 2200 Green St | install appox 10ft. reinforced concrete wall to support (e) brick wall at interior staircase. appoxDetails
install appox 10ft. reinforced concrete wall to support (e) brick wall at interior staircase. appox | $3,100 |
| Sep 26, 2002 | Expired or cancelled expired Oct 2003 | 3358 22nd St | demolish (e) porches & back stairs, build new decks & back stairsDetails
demolish (e) porches & back stairs, build new decks & back stairs | $20,500 |
| Jun 19, 2000 | Completed final sign-off Sep 2002 | 214 Precita Av | foundation and stair repairs as per drawing by culley assoc engineersDetails
foundation and stair repairs as per drawing by culley assoc engineers | $51,000 |
| May 1, 2000 | Expired or cancelled expired Nov 2000 | 2021 Pacific Av | repair in kind existing concrete stairs on gradeDetails
repair in kind existing concrete stairs on grade | $6,500 |