Back to kitchen remodel contractors
Hong's General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2013 to Aug 2026
- Last 24 months
- 33 permits filed
165 permits since 2000: 110 completed, 19 in progress, 24 never finaled, 12 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 16 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
59 kitchen remodel permits: 43 completed, 7 in progress, 4 never finaled, 5 expired or cancelled. Typically 22 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 12, 2026 | In progress issued Aug 2026 | 1444 Ulloa St | 1st fl - add 2 bedroom, 2.5 bath and laundry; 2nd fl remodel kitchen and bathroom; in-fill lightwellDetails
1st fl - add 2 bedroom, 2.5 bath and laundry; 2nd fl remodel kitchen and bathroom; in-fill lightwell | $110,000 |
| Jul 24, 2026 | In progress issued Jul 2026 | 1423 31st Av | remodel (e) upstairs kitchen (180 sf) and (2) bathrooms (80 sf), in-kind. ho new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5.Details
remodel (e) upstairs kitchen (180 sf) and (2) bathrooms (80 sf), in-kind. ho new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3 and (k)5. | $45,000 |
| Jan 28, 2026 | In progress issued Feb 2026 | 21 Hollywood Ct | 1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairsDetails
1st fl - add family room; 2nd fl - remodel kitchen and bathroom, add 1 full bath and office; repair interior stairs | $78,000 |
| Jan 20, 2026 | In progress issued Mar 2026 | 2342 26th Av | 1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylightDetails
1st fl - relocate family, bathrm and laundry; add wet bar and bedrm; 2nd fl - reconfigure family, kitchen and dining rooms; remodel (e) bedrooms and bathrooms per layout; new patio at rear; new skylight | $230,000 |
| Jan 15, 2026 | Completed final sign-off Sep 2026 | 24 Lawrence Av | 1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl).Details
1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl). | $130,000 |
| Sep 24, 2025 | In progress issued Oct 2025 | 1009 Portola Dr | 1/f: add 2 bedroom, 2 full bath and family. 2/f: remodel kitchen and bathroom, add 1 full bath, add patio at rear. 9 new vinyl windows, new side stair with 1 hr rated wall, 2 replacement rear windows with vinyl.Details
1/f: add 2 bedroom, 2 full bath and family. 2/f: remodel kitchen and bathroom, add 1 full bath, add patio at rear. 9 new vinyl windows, new side stair with 1 hr rated wall, 2 replacement rear windows with vinyl. | $150,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 2124 18th Av | 1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear.Details
1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear. | $190,000 |
| May 28, 2025 | Completed final sign-off Aug 2025 | 26 Albion St | remodel existing kitchen, one full bathroom with shower and one powder room.Details
remodel existing kitchen, one full bathroom with shower and one powder room. | $50,000 |
| Mar 14, 2025 | Completed final sign-off Jan 2026 | 2347 42nd Av | 1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen.Details
1st floor: remodel (e) bathroom 2nd floor: remove 2'-6" section of partition wall at kitchen. | $10,000 |
| Feb 25, 2025 | Completed final sign-off Sep 2025 | 430 Rolph St | revision to pa 202410304066: 1st fl - resize (n) bedroom; 2nd fl - reconfigure kitchen & (n) bathroom layout; reconfigure interior stairDetails
revision to pa 202410304066: 1st fl - resize (n) bedroom; 2nd fl - reconfigure kitchen & (n) bathroom layout; reconfigure interior stair | |
| Jan 17, 2025 | In progress issued Apr 2025 | 180 De Soto St | interior remodel: reconfigure 1st/f with new bathrooms & remoel (e) kitchen. enlarge 2/f bathroom. no change of (e) building envelope and facade. no habitable sf ft addedDetails
interior remodel: reconfigure 1st/f with new bathrooms & remoel (e) kitchen. enlarge 2/f bathroom. no change of (e) building envelope and facade. no habitable sf ft added | $68,000 |
| Jul 16, 2024 | Completed final sign-off Apr 2026 | 571 Gates St | 1st fl: relocate kitchen & living room from 2nd fl. add powder room. 2nd fl: remodel bedrooms and bathroom. add 1 bedroom & 1 full bath. replace new fence 6' high at rear. add new patio at rear. replace garage door with wood in kind. 2 story rear additionDetails
1st fl: relocate kitchen & living room from 2nd fl. add powder room. 2nd fl: remodel bedrooms and bathroom. add 1 bedroom & 1 full bath. replace new fence 6' high at rear. add new patio at rear. replace garage door with wood in kind. 2 story rear addition | $150,000 |
| Mar 29, 2024 | Completed final sign-off Sep 2025 | 494 46th Av | 1/f: add 2 bedrooms, 2 full baths, family room and laundry. 2/f: remodel kitchen and bath, add 1 full bath and interior stairs.Details
1/f: add 2 bedrooms, 2 full baths, family room and laundry. 2/f: remodel kitchen and bath, add 1 full bath and interior stairs. | $300,000 |
| Nov 29, 2023 | Completed final sign-off May 2025 | 2307 35th Av | construct 2 bedroom, 2 bath, media room, install wet bar at gr fl. remodel kitchen, bath, construct 1 new bath rm and study room at 2nd fl; seismic strengthen upper an lowr levelDetails
construct 2 bedroom, 2 bath, media room, install wet bar at gr fl. remodel kitchen, bath, construct 1 new bath rm and study room at 2nd fl; seismic strengthen upper an lowr level | $234,960 |
| Oct 13, 2023 | Completed final sign-off Jan 2024 | 2241 17th Av | revision to pa#: 202304075341. 1st flr: resize bedroom, bathroom, and closet. 2nd floor: relocate kitchen sink to islandDetails
revision to pa#: 202304075341. 1st flr: resize bedroom, bathroom, and closet. 2nd floor: relocate kitchen sink to island | |
| Jun 21, 2023 | Completed final sign-off Apr 2024 | 1738 22nd Av | to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north)Details
to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north) | $430,000 |
| Jun 8, 2023 | Completed final sign-off Feb 2024 | 248 Ordway St | replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck.Details
replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck. | $220,000 |
| Apr 14, 2023 | Completed final sign-off Sep 2023 | 567 Head St | 1st fl new bedroom, family and full bath. 2nd fl remodel kitchen, bath, living rm, replace interior stair.Details
1st fl new bedroom, family and full bath. 2nd fl remodel kitchen, bath, living rm, replace interior stair. | $130,000 |
| Apr 7, 2023 | Completed final sign-off Jan 2024 | 2241 17th Av | 1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwellsDetails
1/f: add 2 bedrooms, media, home office and 2 full bath. add new patio. 2/f: remodel kitchen, bathroom. add 1 full bath. 5 new skylights infill lightwells | $150,000 |
| Mar 1, 2023 | Completed final sign-off Jun 2024 | 9 Mayfair Dr | interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplaceDetails
interior remodel on 2nd and 3rd floor. remodel extg 2 kitchens and extg 2 bathrooms. adding 2 new bathrooms. no work on 1st floor. no change of front and bldg envelope. remove 2nd fl fireplace | $87,000 |
| Oct 3, 2022 | Completed final sign-off Jun 2023 | 177 Baltimore Wy | 1st fl: add 2 bedrooms, family and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath.Details
1st fl: add 2 bedrooms, family and 1 full bath. 2nd fl: remodel kitchen, bathroom, add 1 full bath. | $85,000 |
| Jul 25, 2022 | Completed final sign-off Jun 2023 | 271 Seneca Av | remodel existing kitchen and existing bathroom with shower. add recess light in living room. dinner room, kitchenDetails
remodel existing kitchen and existing bathroom with shower. add recess light in living room. dinner room, kitchen | $46,000 |
| May 17, 2022 | Completed final sign-off Nov 2022 | 520 Brazil Av | 1st fl: add 1 den, media, family room and full bath. 2nd fl: remodel kitchen, bathroom add 1 full bath and interior stair.Details
1st fl: add 1 den, media, family room and full bath. 2nd fl: remodel kitchen, bathroom add 1 full bath and interior stair. | $120,000 |
| Feb 23, 2022 | Completed final sign-off Dec 2022 | 1390 Hampshire St | 1st fl: remove (e) shed at rear. reconfigure 2-bed & 1-bath. infill south side lightwell. add wetbar, 1 media rm, 1 bath & wic. replace wall with handrail. relocate mech appliances. add laundry unit. 2nd fl: reconfigure interior layout with 2-bed, 1 master bath & wic, common bath & office, kitchen,Details
1st fl: remove (e) shed at rear. reconfigure 2-bed & 1-bath. infill south side lightwell. add wetbar, 1 media rm, 1 bath & wic. replace wall with handrail. relocate mech appliances. add laundry unit. 2nd fl: reconfigure interior layout with 2-bed, 1 master bath & wic, common bath & office, kitchen, | $80,000 |
| Feb 18, 2022 | Completed final sign-off Aug 2022 | 431 32nd Av | relocate kitchen, remodel bathroom. construct 1 new full bathroom & install (4) 18x36 skylight & upgrade ceiling joists. replace (e) sheet rock w/ new. all work on 2/f.Details
relocate kitchen, remodel bathroom. construct 1 new full bathroom & install (4) 18x36 skylight & upgrade ceiling joists. replace (e) sheet rock w/ new. all work on 2/f. | $60,000 |
| Feb 17, 2022 | Completed final sign-off Dec 2022 | 1390 Hampshire St | remodel existing kitchen on second floor and replace all sheetrock on second floor. use 5/8" type x along property line walls.Details
remodel existing kitchen on second floor and replace all sheetrock on second floor. use 5/8" type x along property line walls. | $25,000 |
| Feb 7, 2022 | Completed final sign-off Feb 2023 | 1254 36th Av | construct 2 bedroom, 1 full bathroom, media room, & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bathroom & replace (e) sheetrock w/ new at 2nd floor. remove/replace (e) interior staircase w/ new.Details
construct 2 bedroom, 1 full bathroom, media room, & family room at g/f. remodel (e) kitchen, bathroom, add 1 full bathroom & replace (e) sheetrock w/ new at 2nd floor. remove/replace (e) interior staircase w/ new. | $154,000 |
| Aug 6, 2021 | Completed final sign-off Sep 2021 | 721 Amazon Av | remodel bathroom and kitchen upstair, no structural work, no plans, no location changes. comply cec 150.(k) and 150.0 (k)5Details
remodel bathroom and kitchen upstair, no structural work, no plans, no location changes. comply cec 150.(k) and 150.0 (k)5 | $35,000 |
| Aug 4, 2021 | Completed final sign-off Nov 2021 | 440 Silliman St | replace 11 windows in-kind @ front w/ wood frame & 2 vinyl window in the back in -kind. remodel (e) kitchen and (e) bathroom upstair. remodel 1 (e) bathroom in the basement. no structural work.Details
replace 11 windows in-kind @ front w/ wood frame & 2 vinyl window in the back in -kind. remodel (e) kitchen and (e) bathroom upstair. remodel 1 (e) bathroom in the basement. no structural work. | $38,000 |
| Jun 25, 2021 | Expired or cancelled expired Nov 2024 | 154 Gaven St | interior remodel: 1st fl adding new bathroom & relocate (e) bathroom; 2nd fl - remodel (e) kitchen and add new bathroom and remodel (e) bathroom.Details
interior remodel: 1st fl adding new bathroom & relocate (e) bathroom; 2nd fl - remodel (e) kitchen and add new bathroom and remodel (e) bathroom. | $46,000 |
| Apr 26, 2021 | Completed final sign-off Nov 2021 | 916 Vienna St | construct 2 bedrooms, 2 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom. construct (3) 1.5'x 3' skylight. replace (e) sheetrock with new at 2nd floor.Details
construct 2 bedrooms, 2 full bathroom, & family room at ground floor. remodel (e) kitchen, bathroom. construct (3) 1.5'x 3' skylight. replace (e) sheetrock with new at 2nd floor. | $120,000 |
| Mar 1, 2021 | Completed final sign-off Dec 2021 | 100 Foerster St | 1) construct two bed room, one full bath room, and family room at ground floor. 2)remodel extg kitchen, bath room, add one full bathroom and replace extg sheet rock with new at 2nd floor.Details
1) construct two bed room, one full bath room, and family room at ground floor. 2)remodel extg kitchen, bath room, add one full bathroom and replace extg sheet rock with new at 2nd floor. | $105,000 |
| Jan 19, 2021 | In progress issued Dec 2025 | 38 Chenery St | adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802.Details
adu per planning code sec 207.1 to legalize the udu at the ground floor including kitchen, bathrooms, bedrooms, and a 489 sqft rear addition, and reconfiguring the interior stair to separate the units. and per planner request to legalize second floor rear addition not addressed under 202009234802. | $138,000 |
| Dec 7, 2020 | Completed final sign-off Oct 2021 | 1371 44th Av | comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom.Details
comply with nov 202064487. interior remodel: upgrade kitchen and bath at (e) location. replace the stairs from 2-f to (e) habitable attic. new interior stairs to 1-f. excavate garage for headroom and bathroom. | $100,000 |
| Nov 18, 2020 | Completed final sign-off Jul 2022 | 22 Bridgeview Dr | 1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage doorDetails
1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage door | $120,000 |
| Sep 23, 2020 | Completed final sign-off Feb 2021 | 361 Molimo Dr | interior remodel at 1st floor & 2nd floor. replace existing kitchen cabinets and countertop. replace existing bathrooms.Details
interior remodel at 1st floor & 2nd floor. replace existing kitchen cabinets and countertop. replace existing bathrooms. | $82,000 |
| Sep 23, 2020 | Completed final sign-off May 2023 | 38 Chenery St | for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately.Details
for 2nd floor, relocate & update (e) kitchen and bath with new electrical and plumbing, add 1 (n) bath. for 3rd floor, add new unit, reconfiguring interior layout. interior remodel only with no change to exterior facade. 1st floor adu will be submitted separately. | $120,000 |
| Sep 10, 2020 | Completed final sign-off Jan 2021 | 574 38th Av | #2: remodel interior kitchen and bathroom. repair and replace in kind.Details
#2: remodel interior kitchen and bathroom. repair and replace in kind. | $35,000 |
| Sep 10, 2020 | Expired or cancelled expired May 2023 | 38 Chenery St | remodel interior repair and replace kitchen and 2 bathrooms in kind at 2nd floor.Details
remodel interior repair and replace kitchen and 2 bathrooms in kind at 2nd floor. | $53,000 |
| Feb 20, 2020 | Completed final sign-off Jul 2020 | 2638 Clement St | remodel (1) kitchen and (1) bathroom. #3.Details
remodel (1) kitchen and (1) bathroom. #3. | $18,000 |
| Jan 31, 2020 | Completed final sign-off Oct 2020 | 2538 21st Av | remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace.Details
remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace. | $150,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 176 Topeka Av | construct 2 bedrooms, 1 full bathroom & 1 media room at ground fl. relocate (e) kitchen, upgrade (e) bathroom, add 1 ned bathroom on 2nd fl. construct new deck at rear of bldg.(size approx 18'x5')Details
construct 2 bedrooms, 1 full bathroom & 1 media room at ground fl. relocate (e) kitchen, upgrade (e) bathroom, add 1 ned bathroom on 2nd fl. construct new deck at rear of bldg.(size approx 18'x5') | $89,000 |
| Nov 26, 2019 | Expired or cancelled revoked Jan 2020 | 44 Bonview St | 1)convert extg storage area to multiple room at lower floor. 2)remodel extg family room, bedroom and bathroom at ground floor. 3)remodel extg kitchen, bathroom, bedroom and add one new bathroom at 2nd floor.Details
1)convert extg storage area to multiple room at lower floor. 2)remodel extg family room, bedroom and bathroom at ground floor. 3)remodel extg kitchen, bathroom, bedroom and add one new bathroom at 2nd floor. | $160,000 |
| Oct 2, 2019 | Completed final sign-off Feb 2021 | 361 Molimo Dr | reinstall new drywall that had removed under app#201908148818. replace windows at the back. kitchen, bathrooms upgrade electrical, mechanical. no change of bldg envelopes. not visible from street.Details
reinstall new drywall that had removed under app#201908148818. replace windows at the back. kitchen, bathrooms upgrade electrical, mechanical. no change of bldg envelopes. not visible from street. | $150,000 |
| Aug 29, 2019 | Completed final sign-off Apr 2024 | 484 Sawyer St | 1st flr -(n) bedroom, den, home office and bathroom. 2nd flr -remodel (e) kitchen and bathroom, add (n) bathroom and (n) hallDetails
1st flr -(n) bedroom, den, home office and bathroom. 2nd flr -remodel (e) kitchen and bathroom, add (n) bathroom and (n) hall | $80,000 |
| Feb 7, 2019 | Completed final sign-off Feb 2020 | 2131 Rivera St | 1st fl - interior renovation, add media, entertainment, 2 bedrom and 2 3 fixture bathroom. relocate interior staircase; 2nd fl - infill (e) lightwell interior renovation remodel (e) kitchen, dining, living & bathroom. add 1 3 fixture bathroom. add deck at rearDetails
1st fl - interior renovation, add media, entertainment, 2 bedrom and 2 3 fixture bathroom. relocate interior staircase; 2nd fl - infill (e) lightwell interior renovation remodel (e) kitchen, dining, living & bathroom. add 1 3 fixture bathroom. add deck at rear | $90,000 |
| Jan 31, 2019 | Never finaled issued Mar 2019, no final | 2463 17th Av | revision to 201602048852. 1st fl: reconfig interior layout w 2 bedrm, 1 media, 1 office ,1 entertainment rm. 2nd fl reduce scope, relocate int stairs btwn 1st 2nd fl. relocate kitchen. eliminate n proposed full bath. 3rd fl reduce scope keep e layoutDetails
revision to 201602048852. 1st fl: reconfig interior layout w 2 bedrm, 1 media, 1 office ,1 entertainment rm. 2nd fl reduce scope, relocate int stairs btwn 1st 2nd fl. relocate kitchen. eliminate n proposed full bath. 3rd fl reduce scope keep e layout | $30,000 |
| Nov 7, 2018 | Never finaled issued Nov 2018, no final | 1525 09th Av | dryrot repair and window replacement. dry rot along walls and window area. kitchen ceiling and wall, living room and bedroom all windows to be replaced as wellDetails
dryrot repair and window replacement. dry rot along walls and window area. kitchen ceiling and wall, living room and bedroom all windows to be replaced as well | $5,000 |
| Apr 24, 2018 | Never finaled issued May 2018, no final | 849 Rolph St | turn storage rm into bedrm on basement fl per plan. turn family rm into bedrm on 1st fl per plan. relocate laundry units on1st fl. add a 3 fixture bathroom on 1st fl per plan. remove bearing wall to cerate open kitchen on 2nd fl per plan. kitchen & bathroom remodel on 2nd fl per plan.Details
turn storage rm into bedrm on basement fl per plan. turn family rm into bedrm on 1st fl per plan. relocate laundry units on1st fl. add a 3 fixture bathroom on 1st fl per plan. remove bearing wall to cerate open kitchen on 2nd fl per plan. kitchen & bathroom remodel on 2nd fl per plan. | $30,000 |
| Feb 5, 2018 | Never finaled issued Mar 2018, no final | 2590 24th Av | revision to 201710100762. relocate shelves on 1st flr per plan, kitchen remodel onm 2nd & 3rd flr.per plan, add 2 bedrooms on 2nd & 3rd flr per plan, add one new skylight, maher naDetails
revision to 201710100762. relocate shelves on 1st flr per plan, kitchen remodel onm 2nd & 3rd flr.per plan, add 2 bedrooms on 2nd & 3rd flr per plan, add one new skylight, maher na | $25,000 |
| Sep 19, 2017 | Completed final sign-off Oct 2018 | 241 Paris St | 1st fl: add two bedroom, one full bath, den & media rm. per plan. 2nd floor: (e) bedroom into study room; add one full bath & kitchen remodel per plan.Details
1st fl: add two bedroom, one full bath, den & media rm. per plan. 2nd floor: (e) bedroom into study room; add one full bath & kitchen remodel per plan. | $40,000 |
| Feb 3, 2017 | Completed final sign-off Jun 2017 | 901 Holyoke St | remodel ground floor to have 1 family room, 1 bedroom & 1 full bathroom. remodel kitchen & full bathroom on 2nd floor.Details
remodel ground floor to have 1 family room, 1 bedroom & 1 full bathroom. remodel kitchen & full bathroom on 2nd floor. | $35,000 |
| Jan 26, 2017 | Expired or cancelled revoked Mar 2018 | 50 Bradford St | add interior staircase to connect 1st & 2nd floor per plan. turn (e) powder room into full bath on 1st floor per plan. add one full bath & 2 bedroom on 1st floor per plan. relocated (e) staircase between 2nd & 3rd floor per plan. add one powder room on 2nd floor per plan. kitchen and full bathroomDetails
add interior staircase to connect 1st & 2nd floor per plan. turn (e) powder room into full bath on 1st floor per plan. add one full bath & 2 bedroom on 1st floor per plan. relocated (e) staircase between 2nd & 3rd floor per plan. add one powder room on 2nd floor per plan. kitchen and full bathroom | $50,000 |
| Dec 21, 2016 | Completed final sign-off Oct 2023 | 511 Lakeview Av | horizontal & vertical addition over garage to single family dwelling, add two master bedrooms, two bedrooms, living room, kitchen, dining room, office & half baths, exercise room.Details
horizontal & vertical addition over garage to single family dwelling, add two master bedrooms, two bedrooms, living room, kitchen, dining room, office & half baths, exercise room. | $340,000 |
| Oct 17, 2016 | Expired or cancelled cancelled Jul 2026 | 235 Holyoke St | comply with the planning enforcement #2023-007589enf & complaint 20242611. legalize infilled of one internal stair. legalize (e) 1st floor bathrooms. convert (e) accessory kitchen to new nook on the 2nd floor.Details
comply with the planning enforcement #2023-007589enf & complaint 20242611. legalize infilled of one internal stair. legalize (e) 1st floor bathrooms. convert (e) accessory kitchen to new nook on the 2nd floor. | $150,000 |
| May 6, 2015 | Completed final sign-off May 2016 | 415 Justin Dr | add new deck, add bedroom, bath, powder & entertainment room on 1/f, relocate interior staircase at 1/f. add 1 bath on 2/f. remove partition wall on 2/f. bath & kitchen remodel on 2/f. add (n) lighting fixtues. n/a ordinance #155-13Details
add new deck, add bedroom, bath, powder & entertainment room on 1/f, relocate interior staircase at 1/f. add 1 bath on 2/f. remove partition wall on 2/f. bath & kitchen remodel on 2/f. add (n) lighting fixtues. n/a ordinance #155-13 | $120,000 |
| Mar 19, 2015 | Completed final sign-off Jun 2015 | 264 Orizaba Av | remodel two bathrooms & 1 kitchen on 2nd floor per plan.Details
remodel two bathrooms & 1 kitchen on 2nd floor per plan. | $30,000 |
| Mar 18, 2015 | Completed final sign-off Jan 2016 | 223 Edinburgh St | remodel 3 bathrooms on 1st and 2nd floor. remodel kitchen on 2nd floor. add new storage and playroom on basement floor per plan. no structural work.Details
remodel 3 bathrooms on 1st and 2nd floor. remodel kitchen on 2nd floor. add new storage and playroom on basement floor per plan. no structural work. | $30,000 |
| Mar 9, 2015 | Completed final sign-off May 2017 | 532 Natoma St | change of use to legalize (e) dwelling units. rearrange living area - add bedrooms, family, bathrooms, & staircase to (n) roof deck. add flat skylights, relocate kitchen, replace windows & garage door @ front. relocate water heater & furnace.Details
change of use to legalize (e) dwelling units. rearrange living area - add bedrooms, family, bathrooms, & staircase to (n) roof deck. add flat skylights, relocate kitchen, replace windows & garage door @ front. relocate water heater & furnace. | $100,000 |