Hong's General Construction Inc
- Based in
- San Francisco
- On San Francisco permits
- May 2013 to Aug 2026
- Last 24 months
- 33 permits filed
165 permits since 2000: 110 completed, 19 in progress, 24 never finaled, 12 expired or cancelled.
Of the 24 never-finaled permits, 2 are 3 to 5 years old, 16 are 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
20 deck permits: 15 completed, 2 in progress, 3 never finaled. Typically 28 days from filing to permit and 244 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 2, 2026 | In progress issued Jul 2026 | 55 Oliver St | interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storageDetails
interior remodel/convert 1st fl into living space. 2nd fl - add new deck in the rear; 1st fl - add new bathrooms, new office, new bedrooms, new living room and storage | $150,000 |
| Apr 30, 2026 | In progress issued Jul 2026 | 57 Loomis St | to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance.Details
to comply with complaint 202545245 of (e) commercial space. no change of use or t.i. to show as-built conditions. removal of non permitted work, installation of metal decking and bringing existing restroom to compliance. | $5,000 |
| Jan 15, 2026 | Completed final sign-off Sep 2026 | 24 Lawrence Av | 1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl).Details
1/f: add 2 bedroom, 1 full bath , family room. 2/f: remodel kitchen, bathroom. add 1 full bath. infill lightwell. add new deck at rear. replace front windows in-kind (vinyl). | $130,000 |
| Aug 12, 2025 | Completed final sign-off Mar 2026 | 2124 18th Av | 1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear.Details
1st flr: relocate laundry. add 2 bedrooms. media with wet bar and 1.5 bath. 2nd flr: remodel (e) living, kitchen, dining, 2 bedrooms, bathroom. add 1 bathroom and pantry. infill lightwell, new deck at rear. | $190,000 |
| Oct 1, 2024 | Completed final sign-off Oct 2025 | 1224 Athens St | 1st fl: add 2 bedrooms, 2 full baths, and wet bar. relocate laundry and utilities. 2nd fl: add 1 full bath, remodel living and dining room. 3rd fl: convert bedrm to office, remodel bathrooms. replace sheetrock throughout. infill and new deck at rearDetails
1st fl: add 2 bedrooms, 2 full baths, and wet bar. relocate laundry and utilities. 2nd fl: add 1 full bath, remodel living and dining room. 3rd fl: convert bedrm to office, remodel bathrooms. replace sheetrock throughout. infill and new deck at rear | $150,000 |
| Sep 18, 2024 | Completed final sign-off Oct 2024 | 9 Mayfair Dr | revision to pa# 202310209124. to correct sheet a-2.3 deck joist to 2x8 @ 12 o.c., no posts adjacent to building.Details
revision to pa# 202310209124. to correct sheet a-2.3 deck joist to 2x8 @ 12 o.c., no posts adjacent to building. | $600 |
| Aug 5, 2024 | Completed final sign-off May 2025 | 2055 42nd Av | 1st fl adu prev approved. 2nd fl: remove internal stair, reconfigure bathrooms lyout add deck and stair to connect rear yard and 2nd flDetails
1st fl adu prev approved. 2nd fl: remove internal stair, reconfigure bathrooms lyout add deck and stair to connect rear yard and 2nd fl | $30,000 |
| Oct 20, 2023 | Completed final sign-off Oct 2024 | 9 Mayfair Dr | proposed new deck platform to access the backyard at 2nd fl with new sliding door. at 1st fl modify existing exterior stair to comply with todays code and easy to access the upper back yard. relocated existing furnace to 2nd and 3rd fls. no change of existing building envelope at front facadeDetails
proposed new deck platform to access the backyard at 2nd fl with new sliding door. at 1st fl modify existing exterior stair to comply with todays code and easy to access the upper back yard. relocated existing furnace to 2nd and 3rd fls. no change of existing building envelope at front facade | $13,000 |
| Jun 21, 2023 | Completed final sign-off Apr 2024 | 1738 22nd Av | to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north)Details
to comply w/ nov #202303319: 1st fl. add 2 bed rooms, 2 full bath and media. 2nd fl. remodel kitchen and bathroom, add 1 den and 1 full bath, add new deck at rear. replace front windows with in-kind alum clad wood, replace fire damage siding (north) | $430,000 |
| Jun 8, 2023 | Completed final sign-off Feb 2024 | 248 Ordway St | replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck.Details
replace front 2 windows in kind with thin profile fiberglass window. basement: add office, family rm, 1 full bath, 1 media, & storage. 1/f: add full bath, den & laundry. 2/f: remodel kitchen & bath. (total add living space 975 sf) new rear deck. | $220,000 |
| May 18, 2023 | Completed final sign-off Sep 2023 | 567 Head St | revision to bpa#202304145789, add new deck @ rearDetails
revision to bpa#202304145789, add new deck @ rear | $15,000 |
| Jan 19, 2023 | Completed final sign-off May 2025 | 2055 42nd Av | comply with nov #201488731 and nov #201714481. legalizing of dwelling unit on 1st floor per adu program under state program. remodel of 2nd floor, new deck @ rear yard under separate permit.Details
comply with nov #201488731 and nov #201714481. legalizing of dwelling unit on 1st floor per adu program under state program. remodel of 2nd floor, new deck @ rear yard under separate permit. | $80,000 |
| Nov 18, 2020 | Completed final sign-off Jul 2022 | 22 Bridgeview Dr | 1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage doorDetails
1st floor:construct (n)bedroom,family,bathrm & (n)deck w/stairs to rear yard.2nd floor: construct(n)master bedrm suite,laundry w/ wet bar & cantilever deck.3rd floor:remodel kitchen, dining & living rm. construct (n)bathrm;remodel(e)bathrm.infill small lightwell.(n)kylight;window & garage door | $120,000 |
| Jan 31, 2020 | Completed final sign-off Oct 2020 | 2538 21st Av | remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace.Details
remodel/relocate kitchen & bath, add a full bath & bedroom, relocate/replace stairs. infill lightwell, add a deck & stair @ rear on 2nd floor. add two bedrooms, 2 full bath, media & laundry, replace garage door on 1st floor. replace aluminum clad wood windows @ front. replace water heater/furnace. | $150,000 |
| Jan 21, 2020 | Completed final sign-off Jul 2020 | 176 Topeka Av | construct 2 bedrooms, 1 full bathroom & 1 media room at ground fl. relocate (e) kitchen, upgrade (e) bathroom, add 1 ned bathroom on 2nd fl. construct new deck at rear of bldg.(size approx 18'x5')Details
construct 2 bedrooms, 1 full bathroom & 1 media room at ground fl. relocate (e) kitchen, upgrade (e) bathroom, add 1 ned bathroom on 2nd fl. construct new deck at rear of bldg.(size approx 18'x5') | $89,000 |
| Feb 7, 2019 | Completed final sign-off Feb 2020 | 2131 Rivera St | 1st fl - interior renovation, add media, entertainment, 2 bedrom and 2 3 fixture bathroom. relocate interior staircase; 2nd fl - infill (e) lightwell interior renovation remodel (e) kitchen, dining, living & bathroom. add 1 3 fixture bathroom. add deck at rearDetails
1st fl - interior renovation, add media, entertainment, 2 bedrom and 2 3 fixture bathroom. relocate interior staircase; 2nd fl - infill (e) lightwell interior renovation remodel (e) kitchen, dining, living & bathroom. add 1 3 fixture bathroom. add deck at rear | $90,000 |
| Jan 28, 2019 | Never finaled issued Dec 2019, no final | 1339 21st Av | add new deck at the back of the existing house, per planning dept requirement, it has to be intake for 311 notification.Details
add new deck at the back of the existing house, per planning dept requirement, it has to be intake for 311 notification. | $1,200 |
| Mar 30, 2016 | Never finaled issued Apr 2016, no final | 1115 Rivera St | add stair at side of (e) deck per plan; add full bath on 2nd floor per plan; replace 3 windows at front o f building with all wood, divided light windows in kind, per plan; repair partial exterior stair at front of building less than 50%; add one room on 2nd floor.Details
add stair at side of (e) deck per plan; add full bath on 2nd floor per plan; replace 3 windows at front o f building with all wood, divided light windows in kind, per plan; repair partial exterior stair at front of building less than 50%; add one room on 2nd floor. | $30,000 |
| Feb 4, 2016 | Never finaled issued Jul 2016, no final | 2463 17th Av | relocate (e) full bath on 1st flr; add entertainment rm, mud rm,family rm, one bedrm, & powder on 1st flr. reconfigure floor plan layout on 2nd floor. add deck at rear. full bath remodel on 3rd floor. infill the lightwell.Details
relocate (e) full bath on 1st flr; add entertainment rm, mud rm,family rm, one bedrm, & powder on 1st flr. reconfigure floor plan layout on 2nd floor. add deck at rear. full bath remodel on 3rd floor. infill the lightwell. | $60,000 |
| May 6, 2015 | Completed final sign-off May 2016 | 415 Justin Dr | add new deck, add bedroom, bath, powder & entertainment room on 1/f, relocate interior staircase at 1/f. add 1 bath on 2/f. remove partition wall on 2/f. bath & kitchen remodel on 2/f. add (n) lighting fixtues. n/a ordinance #155-13Details
add new deck, add bedroom, bath, powder & entertainment room on 1/f, relocate interior staircase at 1/f. add 1 bath on 2/f. remove partition wall on 2/f. bath & kitchen remodel on 2/f. add (n) lighting fixtues. n/a ordinance #155-13 | $120,000 |