Ho Bok Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to May 2024
- Last 24 months
- 0 permits filed
81 permits since 2000: 71 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 10 completed, 1 never finaled. Typically 20 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 29, 2024 | Completed final sign-off Oct 2024 | 165 Laura St | scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor.Details
scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor. | $10,000 |
| Jun 15, 2021 | Never finaled issued Jul 2021, no final | 826 Central Av | common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landingDetails
common area - improvement to (e) stairs from street to basement including: install handrails @ both side of stairs; remove door @ bottom step; upgrade landing @ bottom of stair; install 2 (n) doors, 1 @ each side of landing | $2,500 |
| Dec 7, 2020 | Completed final sign-off Sep 2022 | 968 Geneva Av | at 2/f, remodel existing bathroom and kitchen. one new bedroom and two new bathrooms and one new home office at front. @ 1st fl remodel (e) kitchen and remove wall @ stair landingDetails
at 2/f, remodel existing bathroom and kitchen. one new bedroom and two new bathrooms and one new home office at front. @ 1st fl remodel (e) kitchen and remove wall @ stair landing | $70,000 |
| Aug 20, 2019 | Completed final sign-off May 2022 | 183 Stanyan St | reconfigure internal/outdoor stair, move front downstairs; contdition space behind garage, replace windows, remove elevator, enclose/cover condition & central. courtyard @ top story, move kitchen downstairs. (1) kitchen, 1 powder, 3 full baths, 1 laundry. infill lightwellDetails
reconfigure internal/outdoor stair, move front downstairs; contdition space behind garage, replace windows, remove elevator, enclose/cover condition & central. courtyard @ top story, move kitchen downstairs. (1) kitchen, 1 powder, 3 full baths, 1 laundry. infill lightwell | $300,000 |
| May 3, 2018 | Completed final sign-off Jun 2025 | 750 44th Av | renovate & expand existing lower level of dwelling as follows: renovate 436 sq.ft of existing, convert 95 sq.ft of garage to dwelling, add 274 sq ft. project adds 129 sq ft deck on upper level, replace existing failing side yard stair. add second dwelling unit.Details
renovate & expand existing lower level of dwelling as follows: renovate 436 sq.ft of existing, convert 95 sq.ft of garage to dwelling, add 274 sq ft. project adds 129 sq ft deck on upper level, replace existing failing side yard stair. add second dwelling unit. | $121,000 |
| Oct 25, 2017 | Completed final sign-off Jun 2018 | 814 Persia Av | add 2 bedrooms, 2 full bathrooms and laundry on (e) ground floor. add skylight on bathroom & stair on (e) 2nd floor. remodel kitchen.Details
add 2 bedrooms, 2 full bathrooms and laundry on (e) ground floor. add skylight on bathroom & stair on (e) 2nd floor. remodel kitchen. | $120,000 |
| Feb 27, 2017 | Completed final sign-off Apr 2017 | 994 Le Conte Av | remove and replace front exterior stairs in kindDetails
remove and replace front exterior stairs in kind | $10,000 |
| Jan 26, 2016 | Completed final sign-off May 2016 | 1423 Oakdale Av | construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan.Details
construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan. | $90,000 |
| Sep 23, 2014 | Completed final sign-off Mar 2015 | 524 Girard St | 1st flr: add 2 bedrooms, bath & laundry to unit #526; 2nd flr: relocate bath, build interior stair to unit #526, remodel kitchen and bath to unit #524.Details
1st flr: add 2 bedrooms, bath & laundry to unit #526; 2nd flr: relocate bath, build interior stair to unit #526, remodel kitchen and bath to unit #524. | $90,000 |
| Sep 15, 2014 | Completed final sign-off Oct 2014 | 2247 47th Av | reapir the front side stairs. remove existing concrete treatds and risers and replace with new granite treads and risers (light cream color). no change to existing stair dimensions or heights.Details
reapir the front side stairs. remove existing concrete treatds and risers and replace with new granite treads and risers (light cream color). no change to existing stair dimensions or heights. | $3,000 |
| Apr 23, 2013 | Completed final sign-off Oct 2014 | 136 Highland Av | add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable spaceDetails
add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable space | $45,000 |