Ho Bok Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to May 2024
- Last 24 months
- 0 permits filed
81 permits since 2000: 71 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
9 deck permits: 8 completed, 1 expired or cancelled. Typically 26 days from filing to permit and 274 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 14, 2021 | Expired or cancelled expired Sep 2026 | 342 Hearst Av | add 427 sq ft addition on grnd flr w/ deck above at main flr level. add 19 sq ft, hallway sairwell from upper flr to lower addition. add 9n) lighting, plumbing and hvac for addition. remodel kitchen.Details
add 427 sq ft addition on grnd flr w/ deck above at main flr level. add 19 sq ft, hallway sairwell from upper flr to lower addition. add 9n) lighting, plumbing and hvac for addition. remodel kitchen. | $210,000 |
| Jun 20, 2019 | Completed final sign-off Sep 2020 | 2457 20th Av | remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in heightDetails
remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in height | $200,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 360 Sweeny St | construct 2 bedrooms, 2 bathrooms & install front door at ground fl; relocate (e) kitchen, bedrooms, remodel (e) bathroom, add 1 new bathroom & upgrade partial ceiling joists at 2nd fl; construct new deck at rear of bldg (size approx 18x7')Details
construct 2 bedrooms, 2 bathrooms & install front door at ground fl; relocate (e) kitchen, bedrooms, remodel (e) bathroom, add 1 new bathroom & upgrade partial ceiling joists at 2nd fl; construct new deck at rear of bldg (size approx 18x7') | $98,000 |
| May 3, 2018 | Completed final sign-off Jun 2025 | 750 44th Av | renovate & expand existing lower level of dwelling as follows: renovate 436 sq.ft of existing, convert 95 sq.ft of garage to dwelling, add 274 sq ft. project adds 129 sq ft deck on upper level, replace existing failing side yard stair. add second dwelling unit.Details
renovate & expand existing lower level of dwelling as follows: renovate 436 sq.ft of existing, convert 95 sq.ft of garage to dwelling, add 274 sq ft. project adds 129 sq ft deck on upper level, replace existing failing side yard stair. add second dwelling unit. | $121,000 |
| Nov 21, 2017 | Completed final sign-off Jun 2018 | 814 Persia Av | foundation replacement and add deck at rearDetails
foundation replacement and add deck at rear | $30,000 |
| Sep 7, 2017 | Completed final sign-off Dec 2017 | 685 20th Av | to comply with physical inspection report cc-8141.remove sunroom enclosure at (e) unit 685 deck.install 42in high wood guardrail facing rear yard. repair (e) property line wall at deck.install new electrical panel to serve common areas. replace (e) small fuse panel in 687.Details
to comply with physical inspection report cc-8141.remove sunroom enclosure at (e) unit 685 deck.install 42in high wood guardrail facing rear yard. repair (e) property line wall at deck.install new electrical panel to serve common areas. replace (e) small fuse panel in 687. | $5,000 |
| Jan 26, 2016 | Completed final sign-off May 2016 | 1423 Oakdale Av | construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan.Details
construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan. | $90,000 |
| Jan 25, 2016 | Completed final sign-off Nov 2016 | 70 Cotter St | add 2 bedrooms, media room & 1 full bath at 1st floor. re-built (e) deck at rear of 2nd floor.Details
add 2 bedrooms, media room & 1 full bath at 1st floor. re-built (e) deck at rear of 2nd floor. | $46,500 |
| Apr 23, 2013 | Completed final sign-off Oct 2014 | 136 Highland Av | add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable spaceDetails
add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable space | $45,000 |