Back to bathroom remodel contractors
Ho Bok Construction
- Based in
- San Francisco
- On San Francisco permits
- Dec 2011 to May 2024
- Last 24 months
- 0 permits filed
81 permits since 2000: 71 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
51 bathroom remodel permits: 48 completed, 1 never finaled, 2 expired or cancelled. Typically 8 days from filing to permit and 252 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 2, 2024 | Completed final sign-off Dec 2024 | 3249 Harrison St | remodel one kitchen and one bathroom. change 6 new windows in kind and one door in the rear of the building. u=.30maxDetails
remodel one kitchen and one bathroom. change 6 new windows in kind and one door in the rear of the building. u=.30max | $58,000 |
| Mar 29, 2024 | Completed final sign-off Oct 2024 | 165 Laura St | scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor.Details
scope includes structural, add 167 sq ft of conditioned area. ground floor: construct reated hallway, new full bath. 2nd floor: construct (n) int. stair to ground floor. | $10,000 |
| Mar 24, 2022 | Never finaled issued Mar 2022, no final | 156 Shawnee Av | remodel bathroom. replace the tiles. install new toilet. new bath tub and vanity.Details
remodel bathroom. replace the tiles. install new toilet. new bath tub and vanity. | $17,000 |
| Oct 18, 2021 | Completed final sign-off Dec 2021 | 18 Perego Tr | unit 5: remodel bathroom. move electrical panel to garageDetails
unit 5: remodel bathroom. move electrical panel to garage | $12,000 |
| Sep 30, 2021 | Completed final sign-off Apr 2022 | 1722 34th Av | remodel one existing kitchen and one bathroom. non structuralDetails
remodel one existing kitchen and one bathroom. non structural | $18,000 |
| Aug 3, 2021 | Completed final sign-off Apr 2022 | 300 03rd St | in-kind kitchen remodel (60 sf). in-kind bathroom remodel (45 sf).Details
in-kind kitchen remodel (60 sf). in-kind bathroom remodel (45 sf). | $18,000 |
| Jun 23, 2021 | Completed final sign-off Nov 2021 | 1562 10th Av | upper unit: remodel bath & add one bath.Details
upper unit: remodel bath & add one bath. | $28,000 |
| Jun 8, 2021 | Completed final sign-off Oct 2021 | 1278 03rd Av | remodel one kitchen and bathroom upgarde electrical panel new cabinets vanity and 2 windows. change new faucet and sink and bath tub. windows not facing street.Details
remodel one kitchen and bathroom upgarde electrical panel new cabinets vanity and 2 windows. change new faucet and sink and bath tub. windows not facing street. | $18,000 |
| Feb 25, 2021 | Completed final sign-off May 2021 | 1448 Underwood Av | remodel (e) kitchen & bathroom on 2/f.Details
remodel (e) kitchen & bathroom on 2/f. | $26,000 |
| Dec 7, 2020 | Completed final sign-off Sep 2022 | 968 Geneva Av | at 2/f, remodel existing bathroom and kitchen. one new bedroom and two new bathrooms and one new home office at front. @ 1st fl remodel (e) kitchen and remove wall @ stair landingDetails
at 2/f, remodel existing bathroom and kitchen. one new bedroom and two new bathrooms and one new home office at front. @ 1st fl remodel (e) kitchen and remove wall @ stair landing | $70,000 |
| Oct 2, 2019 | Completed final sign-off Aug 2020 | 1264 Page St | remodel units "b" and "c" new plan configuration, remodel extg kitchen and bathrooms. add one more bathroom to each unit.Details
remodel units "b" and "c" new plan configuration, remodel extg kitchen and bathrooms. add one more bathroom to each unit. | $90,000 |
| Aug 20, 2019 | Completed final sign-off May 2022 | 183 Stanyan St | reconfigure internal/outdoor stair, move front downstairs; contdition space behind garage, replace windows, remove elevator, enclose/cover condition & central. courtyard @ top story, move kitchen downstairs. (1) kitchen, 1 powder, 3 full baths, 1 laundry. infill lightwellDetails
reconfigure internal/outdoor stair, move front downstairs; contdition space behind garage, replace windows, remove elevator, enclose/cover condition & central. courtyard @ top story, move kitchen downstairs. (1) kitchen, 1 powder, 3 full baths, 1 laundry. infill lightwell | $300,000 |
| Jun 20, 2019 | Completed final sign-off Sep 2020 | 2457 20th Av | remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in heightDetails
remodel at all 3 levels. (n) conditioned space at basement to incl 1 media rm, 1 bedrm, 1 bath, laundry. (n) patio at rear. replace deck in rear, under 10 ft in height | $200,000 |
| May 23, 2019 | Completed final sign-off Aug 2020 | 1264 Page St | remodel kitchen, install new master bedroom with full bath in unit "a" 1st flr. remodel kitchen and bathroom create new bedroom in unit "d" 4th flr.Details
remodel kitchen, install new master bedroom with full bath in unit "a" 1st flr. remodel kitchen and bathroom create new bedroom in unit "d" 4th flr. | $72,000 |
| Mar 26, 2019 | Completed final sign-off Jan 2020 | 360 Sweeny St | construct 2 bedrooms, 2 bathrooms & install front door at ground fl; relocate (e) kitchen, bedrooms, remodel (e) bathroom, add 1 new bathroom & upgrade partial ceiling joists at 2nd fl; construct new deck at rear of bldg (size approx 18x7')Details
construct 2 bedrooms, 2 bathrooms & install front door at ground fl; relocate (e) kitchen, bedrooms, remodel (e) bathroom, add 1 new bathroom & upgrade partial ceiling joists at 2nd fl; construct new deck at rear of bldg (size approx 18x7') | $98,000 |
| Jan 18, 2019 | Completed final sign-off Dec 2019 | 3829 25th St | revision to app#201805250220. infill of lightwell to create new master bath, new skylights to both bathrooms and replacement of all windows and doors with glazing. replace fauDetails
revision to app#201805250220. infill of lightwell to create new master bath, new skylights to both bathrooms and replacement of all windows and doors with glazing. replace fau | $20,000 |
| Sep 13, 2018 | Completed final sign-off Jan 2021 | 27 Sutro Heights Av | revision to #201205160569 to correct mismeasurements (reduction of mass) new scope, relocate kitchen @ 3rd story, new bath @ 2nd level, reconfigure layout @ all stories, new windows@ rear to be reconfigured vs approv + doors.Details
revision to #201205160569 to correct mismeasurements (reduction of mass) new scope, relocate kitchen @ 3rd story, new bath @ 2nd level, reconfigure layout @ all stories, new windows@ rear to be reconfigured vs approv + doors. | $100,000 |
| Jul 19, 2018 | Completed final sign-off Jan 2019 | 55 Keystone Wy | install shower, move laundry, add walls/doors, remodel master bathroomDetails
install shower, move laundry, add walls/doors, remodel master bathroom | $20,000 |
| Jul 2, 2018 | Completed final sign-off Jul 2019 | 995 Girard St | construct (1) bedroom & (1) full bathroom at ground fl. comply w/complaint 200345474 & 2018069681Details
construct (1) bedroom & (1) full bathroom at ground fl. comply w/complaint 200345474 & 2018069681 | $32,000 |
| Jun 14, 2018 | Completed final sign-off Jul 2019 | 54 Mendosa Av | remodel 3 bathrooms, update electricla and plumbing. no walls moved, infilled, or modified. layout remains unchanged.Details
remodel 3 bathrooms, update electricla and plumbing. no walls moved, infilled, or modified. layout remains unchanged. | $20,000 |
| Jun 14, 2018 | Completed final sign-off Oct 2018 | 170 27th St | 1st floor: remodel bathroom, relocate washer & dryer. 2nd floor: remodel bathroom, add 1 bathroomDetails
1st floor: remodel bathroom, relocate washer & dryer. 2nd floor: remodel bathroom, add 1 bathroom | $32,000 |
| May 25, 2018 | Completed final sign-off Sep 2019 | 3829 25th St | kitchen and bath remodel, relocate 2 bedrooms, living and diningDetails
kitchen and bath remodel, relocate 2 bedrooms, living and dining | $50,000 |
| May 8, 2018 | Completed final sign-off Apr 2020 | 2279 29th Av | infill lightwells @ n&s sides. infill under overhang @ south rear side (less than 10' ht & enclosed on 2 sides) push garage door fwd in (e) alcove (front wall no change) excavate for 9' ceiling behind garage. condition btw garage, n bath. (1) kit, (2) bathrm, (5) skylts, 1 (n) window/wood&alum cladDetails
infill lightwells @ n&s sides. infill under overhang @ south rear side (less than 10' ht & enclosed on 2 sides) push garage door fwd in (e) alcove (front wall no change) excavate for 9' ceiling behind garage. condition btw garage, n bath. (1) kit, (2) bathrm, (5) skylts, 1 (n) window/wood&alum clad | $300,000 |
| Mar 29, 2018 | Completed final sign-off Dec 2018 | 235 London St | ground floor remodel w/addition of habitable space. all work limited to within interior of existing building envelope and no exterior changes. window replacement in kind at rear. 1 new bedroom, 1 full bath, and media room in gr flDetails
ground floor remodel w/addition of habitable space. all work limited to within interior of existing building envelope and no exterior changes. window replacement in kind at rear. 1 new bedroom, 1 full bath, and media room in gr fl | $40,000 |
| Mar 19, 2018 | Completed final sign-off Dec 2018 | 235 London St | remodel (e) kitchen and bathrooms on (e) 2nd flr. add 1 bathroom, and skylights on (e) 2nd flr. window replacement in kind at rear. all work limited to within interior of exterior bld envelope and no exterior changesDetails
remodel (e) kitchen and bathrooms on (e) 2nd flr. add 1 bathroom, and skylights on (e) 2nd flr. window replacement in kind at rear. all work limited to within interior of exterior bld envelope and no exterior changes | $80,000 |
| Dec 20, 2017 | Completed final sign-off Jul 2021 | 116 Whittier St | legalization (e) in-law unit per ordinance# 43-14. to comply with nov# 200869313, # 200993384 & # 201061553. replace a window - fire rate wall @ prop line. fire rate wall between in-law & garage. fire rate floor / ceiling. update kitchen & bath. install heat for the legalization of the illegal unit.Details
legalization (e) in-law unit per ordinance# 43-14. to comply with nov# 200869313, # 200993384 & # 201061553. replace a window - fire rate wall @ prop line. fire rate wall between in-law & garage. fire rate floor / ceiling. update kitchen & bath. install heat for the legalization of the illegal unit. | $58,350 |
| Nov 27, 2017 | Completed final sign-off Nov 2018 | 48 Maynard St | 2nd floor: add 3 new bathrooms, remodel extg bath and kitchen. 1st floor: add 3 new bedrooms, 1 new office, 3 new full baths and theater. sheetrock garage. n/a for maherDetails
2nd floor: add 3 new bathrooms, remodel extg bath and kitchen. 1st floor: add 3 new bedrooms, 1 new office, 3 new full baths and theater. sheetrock garage. n/a for maher | $110,000 |
| Oct 25, 2017 | Completed final sign-off Jun 2018 | 814 Persia Av | add 2 bedrooms, 2 full bathrooms and laundry on (e) ground floor. add skylight on bathroom & stair on (e) 2nd floor. remodel kitchen.Details
add 2 bedrooms, 2 full bathrooms and laundry on (e) ground floor. add skylight on bathroom & stair on (e) 2nd floor. remodel kitchen. | $120,000 |
| Sep 27, 2017 | Completed final sign-off Dec 2017 | 448 Gold Mine Dr | remodel existing bathroom at first floor. and add (8) recess lighting at bedroom.Details
remodel existing bathroom at first floor. and add (8) recess lighting at bedroom. | $6,000 |
| Sep 27, 2017 | Completed final sign-off Dec 2017 | 420 Burrows St | remodel kitchen and bathroom, add 1.5 bathroom and 3 skylight on extg 2nd floor. two window replacement in the back.Details
remodel kitchen and bathroom, add 1.5 bathroom and 3 skylight on extg 2nd floor. two window replacement in the back. | $50,000 |
| Aug 2, 2017 | Completed final sign-off Feb 2018 | 338 Munich St | 2nd floor: add one new bathroom, remodel extg bathroom & kitchen. ground floor: add one nw bath & 1 nw bedroom. remodel extg bath & bedroom,sheet rock garage. exterior: replace windows and patio doors in kind at rear.Details
2nd floor: add one new bathroom, remodel extg bathroom & kitchen. ground floor: add one nw bath & 1 nw bedroom. remodel extg bath & bedroom,sheet rock garage. exterior: replace windows and patio doors in kind at rear. | $65,000 |
| Apr 7, 2017 | Expired or cancelled expired Dec 2024 | 350 Athens St | ground floor: add 2 (n) bedrooms, 2 (n) bathrooms&1 (n) family rm., sheet rock garage. 2nd flr: add 1(n) bathroom, remodel (e) bathroom, kitchen and whole floor.attic-legalize(e)attic area to be playroom, add 1 (n) bathroom @ 3rd flr. exterior - - replace 10 vinyl windows, 1 patio door in kind faceDetails
ground floor: add 2 (n) bedrooms, 2 (n) bathrooms&1 (n) family rm., sheet rock garage. 2nd flr: add 1(n) bathroom, remodel (e) bathroom, kitchen and whole floor.attic-legalize(e)attic area to be playroom, add 1 (n) bathroom @ 3rd flr. exterior - - replace 10 vinyl windows, 1 patio door in kind face | $130,000 |
| Feb 23, 2017 | Completed final sign-off Sep 2017 | 90 Aquavista Wy | renovation to kitchen & bathroom on 2nd floor. 1st flor renovate to (e) great room. 31 sf of the garage to be converted to conditioned space to include bedroom, bedroom, bathroom & hallway.Details
renovation to kitchen & bathroom on 2nd floor. 1st flor renovate to (e) great room. 31 sf of the garage to be converted to conditioned space to include bedroom, bedroom, bathroom & hallway. | $64,650 |
| Jan 27, 2017 | Completed final sign-off Dec 2017 | 923 Capitol Av | add office, media room, one full bath & laundry at 1st floor per planDetails
add office, media room, one full bath & laundry at 1st floor per plan | $35,300 |
| Oct 18, 2016 | Completed final sign-off Apr 2017 | 112 Judson Av | 2nd flr: add one new bath, remodel (e) bath & kitchen gf: add 2 new bedrooms, 1 bathroom 1 new home theater & new laundry. exterior - replace 3 vinyl windows, 2 patio doors in kind & add 2 skylightsDetails
2nd flr: add one new bath, remodel (e) bath & kitchen gf: add 2 new bedrooms, 1 bathroom 1 new home theater & new laundry. exterior - replace 3 vinyl windows, 2 patio doors in kind & add 2 skylights | $40,000 |
| May 17, 2016 | Completed final sign-off Apr 2017 | 1643 43rd Av | interior remodel of s.f.d. remove extg central courtyard. new laundry, master suite on 1st floor. remodel kitchen and bath. new skylights.Details
interior remodel of s.f.d. remove extg central courtyard. new laundry, master suite on 1st floor. remodel kitchen and bath. new skylights. | $50,000 |
| May 16, 2016 | Completed final sign-off Dec 2016 | 152 Bridgeview Dr | 2nd floor - add 2(n) bathroom, remodel 1 (e) bathroom, add 1 (n) skylight; 1st floor - remodel (e) bathroom & kitchen. basement - convert (e) storage to (n) bedroom & (n) bathroom, replace windows & sliding door to rear yardDetails
2nd floor - add 2(n) bathroom, remodel 1 (e) bathroom, add 1 (n) skylight; 1st floor - remodel (e) bathroom & kitchen. basement - convert (e) storage to (n) bedroom & (n) bathroom, replace windows & sliding door to rear yard | $70,000 |
| Feb 25, 2016 | Completed final sign-off Oct 2016 | 211 04th Av | all work will be done on the upper unit: kitchen remodelling, bath remodelling, lighting fixture replacement/upgrade; laundry hook upDetails
all work will be done on the upper unit: kitchen remodelling, bath remodelling, lighting fixture replacement/upgrade; laundry hook up | $18,000 |
| Feb 2, 2016 | Completed final sign-off Nov 2016 | 2310 33rd Av | revision to pa#2013-1112-1591 & 2015-1113-2526:1) relocate bathrooms, washer & dryer, water heater, furnace at ground floor,2) convert half bathroom into full bathroom & add one 2x2 skylight inside the bathroom at 2/f.Details
revision to pa#2013-1112-1591 & 2015-1113-2526:1) relocate bathrooms, washer & dryer, water heater, furnace at ground floor,2) convert half bathroom into full bathroom & add one 2x2 skylight inside the bathroom at 2/f. | $5,000 |
| Jan 26, 2016 | Completed final sign-off May 2016 | 1423 Oakdale Av | construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan.Details
construct rear deck w/stairs at rear of (e) building per plan. to add 1 bedroom. one full bathroom & laundry room on (e) ground floor per plan. to add 1 full bathroom and remodel (e) kitchen & bathroom on 2nd flr per plan. | $90,000 |
| Jan 25, 2016 | Completed final sign-off Nov 2016 | 70 Cotter St | add 2 bedrooms, media room & 1 full bath at 1st floor. re-built (e) deck at rear of 2nd floor.Details
add 2 bedrooms, media room & 1 full bath at 1st floor. re-built (e) deck at rear of 2nd floor. | $46,500 |
| Dec 18, 2015 | Completed final sign-off Nov 2016 | 70 Cotter St | 1)2nd floor: relocated living room, kitchen, dining, bath room, bedroom and add half bath. 2) 3rd floor: add one full bath and office. 3)replace interior finishes with 5/8" type x gyp. bd.Details
1)2nd floor: relocated living room, kitchen, dining, bath room, bedroom and add half bath. 2) 3rd floor: add one full bath and office. 3)replace interior finishes with 5/8" type x gyp. bd. | $75,000 |
| Nov 13, 2015 | Completed final sign-off Nov 2016 | 2310 33rd Av | remodel (e) kitchen, bathroom, add 2 new bathrooms, replace sheetrock with new & re-wire lighting at 2/fDetails
remodel (e) kitchen, bathroom, add 2 new bathrooms, replace sheetrock with new & re-wire lighting at 2/f | $48,000 |
| Apr 29, 2015 | Completed final sign-off Sep 2015 | 994 Le Conte Av | add 2 bedrooms, 1 full bath & media room at 1/f, relocate 1 bath & add 1 bath at 2/f, replace all windows, add 4 windows & 3 skylights, re-stucco at front & side, all window facing street to be wood window.Details
add 2 bedrooms, 1 full bath & media room at 1/f, relocate 1 bath & add 1 bath at 2/f, replace all windows, add 4 windows & 3 skylights, re-stucco at front & side, all window facing street to be wood window. | $83,000 |
| Jan 27, 2015 | Completed final sign-off Nov 2015 | 994 Le Conte Av | remodel kitchen & bathroom, replace interior finishes w 5/8" type "x" gyp bd. at 2/f; within same kitchen & bathroom area, living room & bedrooms, lighting will control per cec 150 (k)Details
remodel kitchen & bathroom, replace interior finishes w 5/8" type "x" gyp bd. at 2/f; within same kitchen & bathroom area, living room & bedrooms, lighting will control per cec 150 (k) | $33,000 |
| Nov 6, 2014 | Completed final sign-off Jan 2016 | 2178 22nd Av | restore property to legal use as a single family dwelling. remove (e) illegal kitchen, bathroom, living room & bedroom. revert back to storage room. the (e) wall separating garage from storage room to remain.Details
restore property to legal use as a single family dwelling. remove (e) illegal kitchen, bathroom, living room & bedroom. revert back to storage room. the (e) wall separating garage from storage room to remain. | $5,000 |
| Sep 23, 2014 | Completed final sign-off Mar 2015 | 524 Girard St | 1st flr: add 2 bedrooms, bath & laundry to unit #526; 2nd flr: relocate bath, build interior stair to unit #526, remodel kitchen and bath to unit #524.Details
1st flr: add 2 bedrooms, bath & laundry to unit #526; 2nd flr: relocate bath, build interior stair to unit #526, remodel kitchen and bath to unit #524. | $90,000 |
| Oct 24, 2013 | Expired or cancelled cancelled Jan 2026 | 900 Bush St | bathroom remodel. zero change in plumbing. changing like for like fixtures ie vanity, tubDetails
bathroom remodel. zero change in plumbing. changing like for like fixtures ie vanity, tub | |
| Oct 24, 2013 | Completed final sign-off Jan 2014 | 900 Bush St | bathroom remodel. zero change in plumbing. changing like for like fixtures ie vanity, tubDetails
bathroom remodel. zero change in plumbing. changing like for like fixtures ie vanity, tub | $6,500 |
| Apr 23, 2013 | Completed final sign-off Oct 2014 | 136 Highland Av | add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable spaceDetails
add 1 bathroom, game room & office on 1st floor per plan, remodel (e) kitchen & bathroom, add deck & replace stairs on 2nd floor. add 2 bedrooms, 1 full bathroom & laundry room on 3rd floor. replace windows in kind, total of 24 windows. converting 3rd floor to habitable space | $45,000 |
| Dec 21, 2011 | Completed final sign-off Nov 2016 | 12 Brentwood Av | kitchen & bathroom remodel on 2nd floor per plan. add laundry room on 2nd floor per plan and bathroom remodel on 1st floor per plan. replace windows (4) at front with same size and location per plan.Details
kitchen & bathroom remodel on 2nd floor per plan. add laundry room on 2nd floor per plan and bathroom remodel on 1st floor per plan. replace windows (4) at front with same size and location per plan. | $38,000 |