Back to kitchen remodel contractors
Hill Consulting Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jan 2013
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 204 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2013 | Completed final sign-off Dec 2013 | 188 Minna St | revision to app#201207124659. revise kitchen layout and 2 non-load bearing partitions.Details
revision to app#201207124659. revise kitchen layout and 2 non-load bearing partitions. | |
| May 14, 2012 | Completed final sign-off Sep 2012 | 1438 Green St | work in unit 8d: replace kitchen cabinetry, countertops, appliances and tile backsplash. no change in wall and opening layout. a min. of 50%mof the total wattage of permanently installed lighting in kitchen shall be high efficiency.Details
work in unit 8d: replace kitchen cabinetry, countertops, appliances and tile backsplash. no change in wall and opening layout. a min. of 50%mof the total wattage of permanently installed lighting in kitchen shall be high efficiency. | $18,000 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 301 Mission St | unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings.Details
unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings. | $20,000 |
| Jun 7, 2011 | Completed final sign-off Mar 2012 | 668 33rd Av | replace 1 kitchenn flooring, cabinets & counter tops lighting to comply with cec 150(k), no change to exterior walls window or doorsDetails
replace 1 kitchenn flooring, cabinets & counter tops lighting to comply with cec 150(k), no change to exterior walls window or doors | $10,000 |