Back to bathroom remodel contractors
Hill Consulting Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jan 2013
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
4 bathroom remodel permits: 4 completed. Typically 0 days from filing to permit and 91 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 6, 2012 | Completed final sign-off Jul 2012 | 301 Mission St | unit #14e - replace (2) bathroom exhaust fans, demo door, demo wall between living room & 2nd bedroom, install wood flooring in ofrmer 2nd bedroom, frame tv & housephone niche.Details
unit #14e - replace (2) bathroom exhaust fans, demo door, demo wall between living room & 2nd bedroom, install wood flooring in ofrmer 2nd bedroom, frame tv & housephone niche. | $15,000 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 301 Mission St | unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings.Details
unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings. | $20,000 |
| Oct 7, 2011 | Completed final sign-off Dec 2011 | 301 Mission St | replace 4 doors, 2 bathroom counters and install new bathroom mirrors and shower enclosure of unit# 49dDetails
replace 4 doors, 2 bathroom counters and install new bathroom mirrors and shower enclosure of unit# 49d | $13,000 |
| Dec 10, 2010 | Completed final sign-off Jun 2011 | 301 Mission St | relolcate 1 non structural wall , add wood floors, 1 pocket door, closet cabnietry, demo bathDetails
relolcate 1 non structural wall , add wood floors, 1 pocket door, closet cabnietry, demo bath | $30,000 |