Hill Consulting Group
- Based in
- San Francisco
- On San Francisco permits
- Dec 2010 to Jan 2013
- Last 24 months
- 0 permits filed
11 permits since 2000: 9 completed, 2 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jan 23, 2013 | Completed final sign-off Dec 2013 | 188 Minna St | revision to app#201207124659. revise kitchen layout and 2 non-load bearing partitions.Details
revision to app#201207124659. revise kitchen layout and 2 non-load bearing partitions. | |
| Aug 2, 2012 | Expired or cancelled expired Nov 2014 | 301 Mission St | 56d: interior renovation to a condo unit -demolish an existing non-bearing wall between library and living room. existing hvac vent, electrical control, and outlet will be relocated. no net increase of floor area or (e) bldg. envelope.Details
56d: interior renovation to a condo unit -demolish an existing non-bearing wall between library and living room. existing hvac vent, electrical control, and outlet will be relocated. no net increase of floor area or (e) bldg. envelope. | $8,000 |
| May 14, 2012 | Completed final sign-off Sep 2012 | 1438 Green St | work in unit 8d: replace kitchen cabinetry, countertops, appliances and tile backsplash. no change in wall and opening layout. a min. of 50%mof the total wattage of permanently installed lighting in kitchen shall be high efficiency.Details
work in unit 8d: replace kitchen cabinetry, countertops, appliances and tile backsplash. no change in wall and opening layout. a min. of 50%mof the total wattage of permanently installed lighting in kitchen shall be high efficiency. | $18,000 |
| Apr 6, 2012 | Completed final sign-off Jul 2012 | 301 Mission St | unit #14e - replace (2) bathroom exhaust fans, demo door, demo wall between living room & 2nd bedroom, install wood flooring in ofrmer 2nd bedroom, frame tv & housephone niche.Details
unit #14e - replace (2) bathroom exhaust fans, demo door, demo wall between living room & 2nd bedroom, install wood flooring in ofrmer 2nd bedroom, frame tv & housephone niche. | $15,000 |
| Feb 6, 2012 | Completed final sign-off May 2012 | 301 Mission St | unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings.Details
unit #19f: paint unit, refinish floors, install glass shower screen, remove extg bathroom exaust fan and install new, relocate power and cabin for new tv location. remove extg tile and install new tile at 2nd bathroom and kitchen backsplash. no changes on walls and openings. | $20,000 |
| Dec 16, 2011 | Completed final sign-off Jul 2012 | 301 Mission St | unit # 38b:add pocket door, paint, add closet shelving and relocate laundry closet.Details
unit # 38b:add pocket door, paint, add closet shelving and relocate laundry closet. | $40,000 |
| Oct 7, 2011 | Expired or cancelled expired Nov 2013 | 301 Mission St | relocate 2 pendant j-boxes and install 7 new downlightsDetails
relocate 2 pendant j-boxes and install 7 new downlights | $2,500 |
| Oct 7, 2011 | Completed final sign-off Dec 2011 | 301 Mission St | replace 4 doors, 2 bathroom counters and install new bathroom mirrors and shower enclosure of unit# 49dDetails
replace 4 doors, 2 bathroom counters and install new bathroom mirrors and shower enclosure of unit# 49d | $13,000 |
| Aug 16, 2011 | Completed final sign-off Nov 2011 | 301 Mission St | unit #8j - demo & replace ktichen countertop & demo 2nd bathtub & install shower. no lighting changesDetails
unit #8j - demo & replace ktichen countertop & demo 2nd bathtub & install shower. no lighting changes | $15,000 |
| Jun 7, 2011 | Completed final sign-off Mar 2012 | 668 33rd Av | replace 1 kitchenn flooring, cabinets & counter tops lighting to comply with cec 150(k), no change to exterior walls window or doorsDetails
replace 1 kitchenn flooring, cabinets & counter tops lighting to comply with cec 150(k), no change to exterior walls window or doors | $10,000 |
| Dec 10, 2010 | Completed final sign-off Jun 2011 | 301 Mission St | relolcate 1 non structural wall , add wood floors, 1 pocket door, closet cabnietry, demo bathDetails
relolcate 1 non structural wall , add wood floors, 1 pocket door, closet cabnietry, demo bath | $30,000 |