Back to kitchen remodel contractors
Harmony Design & Development Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2020 to Mar 2026
- Last 24 months
- 18 permits filed
64 permits since 2000: 46 completed, 9 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
16 kitchen remodel permits: 9 completed, 5 in progress, 2 never finaled. Typically 8 days from filing to permit and 300 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 9, 2025 | In progress issued Dec 2025 | 215 29th St | unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.Details
unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances. | $119,500 |
| Nov 14, 2025 | In progress issued Dec 2025 | 10 Arbor St | revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddownsDetails
revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns | $48,000 |
| Jul 21, 2025 | In progress issued Jul 2025 | 10 Arbor St | full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kindDetails
full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kind | $110,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 1 Country Club Dr | renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.Details
renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings. | $123,000 |
| Feb 4, 2025 | In progress issued May 2025 | 561 Anderson St | 1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....Details
1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,.... | $235,000 |
| Nov 4, 2024 | Completed final sign-off Sep 2025 | 2111 21st Av | residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroomDetails
residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroom | $92,000 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 3524 Quintara St | 1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgradesDetails
1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgrades | $121,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 54 Valmar Tr | bathroom remodel in kind. kitchen remodel in kind. no structural workDetails
bathroom remodel in kind. kitchen remodel in kind. no structural work | $90,000 |
| Aug 24, 2023 | Completed final sign-off Jun 2024 | 451 Somerset St | revision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room.Details
revision to pa# 202210285372, add ground floor expanded conditions space- 240 sqft total, update structural header framing connection over 2nd flr kitchen/dining room. | $8,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 3452 Cabrillo St | full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.Details
full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers. | $115,000 |
| Apr 4, 2023 | Completed final sign-off Jul 2023 | 3295 Clay St | kitchen remodel in kind, no work to smoke detectors. no wall alteration.Details
kitchen remodel in kind, no work to smoke detectors. no wall alteration. | $62,350 |
| Dec 6, 2022 | Completed final sign-off Jan 2026 | 3676 17th St | partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.Details
partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure. | $325,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2024 | 451 Somerset St | kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code.Details
kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code. | $82,000 |
| Dec 15, 2021 | Never finaled issued Jan 2022, no final | 51 Oakwood St | full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier)Details
full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier) | $90,000 |
| Apr 29, 2021 | Completed final sign-off Feb 2022 | 2114 Wawona St | kitchen remodel in kindDetails
kitchen remodel in kind | $43,800 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 875 South Van Ness Av | unit 875: remodel existing bathroom & kitchen. add master bathroom.Details
unit 875: remodel existing bathroom & kitchen. add master bathroom. | $25,000 |