Back to bathroom remodel contractors
Harmony Design & Development Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2020 to Mar 2026
- Last 24 months
- 18 permits filed
64 permits since 2000: 46 completed, 9 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
45 bathroom remodel permits: 33 completed, 8 in progress, 4 never finaled. Typically 14 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 26, 2026 | In progress issued Feb 2026 | 215 29th St | unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations)Details
unit 215-1/2 29th st. - revision to permit 202512091286. framing repair to dryrot arount bathroom door, bathroom window, bedroom closet and laundry room door (in-kind, no structural alterations) | |
| Dec 9, 2025 | In progress issued Dec 2025 | 215 29th St | unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances.Details
unit 1/2: bathroom remodel in-kind, showerpan. kitchen remodel in-kind, cabinets and appliances. | $119,500 |
| Dec 9, 2025 | In progress issued Dec 2025 | 241 Granville Wy | 2nd floor bathroom remodel in-kind, sink, shower pan, toilet.Details
2nd floor bathroom remodel in-kind, sink, shower pan, toilet. | $47,000 |
| Nov 14, 2025 | In progress issued Dec 2025 | 10 Arbor St | revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddownsDetails
revision 202507211224- 3rd floor 2 bathroom remodel , 2nd floor powder room, kitchen remodel to remove load bearing wall and add seismic plywood shear wallsto 1st floor. 1st floor plywood shearwalls and holddowns | $48,000 |
| Sep 4, 2025 | In progress issued Dec 2025 | 1 Country Club Dr | revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the otherDetails
revision 202504083895- reconfigure bathroom remodel layouts (2 total) add side (north) door at 1st floor garage to access side breezeway with landing and stairs to grade. add platform & steps to access rear yard on one side & public row on the other | |
| Jul 21, 2025 | In progress issued Jul 2025 | 10 Arbor St | full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kindDetails
full remodel of primary bathroom, guest bathroom & powder room - all in-kind; full remodel of kitchen - in-kind | $110,000 |
| Jun 10, 2025 | Completed final sign-off Oct 2025 | 1501 Filbert St | unit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features.Details
unit th1a: revise permit 202504094066 to include the full, in kind/like for like renovation of the master bathroom to scope of work. no wall demolition or construction, no change in plumbing fixture count or accessibiliy features. | $57,000 |
| Apr 9, 2025 | Completed final sign-off Oct 2025 | 1501 Filbert St | unit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind.Details
unit# th1a: install 42 new recess lights the entire unit. countertop replacement and partial pantry remodel. powder room remodel (in kind). guest bathroom full remodel - in kind. primary bathroom full remodel - in kind. | $80,000 |
| Apr 8, 2025 | In progress issued Apr 2025 | 1 Country Club Dr | renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings.Details
renovation of single family dwelling at upper fl. kitchen remodel. remove interior bearing wall between kitchen and living rm. 2 bath remodel. add powder. add plywood shearwalls, structural posts and footings. | $123,000 |
| Feb 4, 2025 | In progress issued May 2025 | 561 Anderson St | 1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,....Details
1/f: add 225 sq conditioned space (living room, bathroom). reconfigure entry stair for access upgrade; 2/f: partial infill entry vestibule for stair. remodel kitchen & bath. attic enlarge internal stair to attic. attic: add 325 sq ft conditioned space. add new bedroom & bath, new rear roof deck,.... | $235,000 |
| Nov 4, 2024 | Completed final sign-off Sep 2025 | 2111 21st Av | residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroomDetails
residential remodel to 2nd story - 1/fl- add 415sf of habitable space to include (n) bedroom, family room and bathroom. add (n) rear windows , sliding door. (n) plywood, shearwalls and holdowns. 2/fl- remodel kitchen , dining room and bathroom | $92,000 |
| Jun 11, 2024 | Completed final sign-off Sep 2024 | 2 Mountain Spring Av | full guest bathroom remodelDetails
full guest bathroom remodel | $38,500 |
| Mar 22, 2024 | Completed final sign-off May 2025 | 3524 Quintara St | 1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgradesDetails
1 story horizontal addition of existing 1 story single family dwelling. add 115 sf rear addition. kitchen & bathroom remodel. add bathroom. add (4) skylights; seismic & structural upgrades | $121,000 |
| Mar 8, 2024 | Completed final sign-off Jul 2025 | 108 Congdon St | residential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades.Details
residential renovation of (e) 2 story sfd. 2/f: add bathroom, remove wall between front bedroom/dining wall. center wall relocated so front living room is converted to bedroom seismic structural upgrades. | $82,000 |
| Mar 7, 2024 | Completed final sign-off Apr 2024 | 154 Everson St | full bath remodel in kind.Details
full bath remodel in kind. | $34,000 |
| Jan 3, 2024 | Completed final sign-off Feb 2024 | 965 Elizabeth St | one bathroom remodel, non structuralDetails
one bathroom remodel, non structural | $38,500 |
| Oct 17, 2023 | Completed final sign-off Jul 2024 | 166 Desmond St | remodel (e) bathroom on 2nd fl, per plans.Details
remodel (e) bathroom on 2nd fl, per plans. | $10,000 |
| Aug 25, 2023 | Completed final sign-off Jan 2024 | 54 Valmar Tr | bathroom remodel in kind. kitchen remodel in kind. no structural workDetails
bathroom remodel in kind. kitchen remodel in kind. no structural work | $90,000 |
| Jul 18, 2023 | Never finaled issued Jul 2023, no final | 3452 Cabrillo St | full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers.Details
full 1 kitchen, full 1 master bathroom, and full 1 guest bathroom renovation in-kind. no work to fire sprinklers. | $115,000 |
| May 31, 2023 | Completed final sign-off Sep 2023 | 676 Page St | interior remodel in unit 676 page st. remodel existing bathroom (4th fl)Details
interior remodel in unit 676 page st. remodel existing bathroom (4th fl) | $12,000 |
| Mar 14, 2023 | Completed final sign-off Jun 2023 | 370 Maynard St | one full bath remodel. in kind. no wall changes.Details
one full bath remodel. in kind. no wall changes. | $29,000 |
| Feb 21, 2023 | Completed final sign-off May 2025 | 1779 08th Av | convert rear garage space into (2) unconditioned storage room, add bathroomDetails
convert rear garage space into (2) unconditioned storage room, add bathroom | $38,000 |
| Dec 6, 2022 | Completed final sign-off Jan 2026 | 3676 17th St | partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure.Details
partially excavate lower level to create (n) principal suite and laundry in (e) 1st flr storage area and connect to 2nd flr unit w/(n) stair . renovate 2nd flr kitchen and living and 3rd flr bedroom and 2nd bathrooms (n) windows balcony and spiral stair at rear of structure. | $325,000 |
| Oct 28, 2022 | Completed final sign-off Jan 2024 | 451 Somerset St | kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code.Details
kitchen remodel. add (1) bathroom. remove/resize side windows at second floor. remove side door at first floor. relocate internal stair to meet building code. | $82,000 |
| Jul 12, 2022 | Completed final sign-off Feb 2024 | 650 36th Av | revision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall.Details
revision to 202112104187. g/f: reconfigure bathroom, w/d, mech room.new landing to enclosed patio 2/f: reduce north lightwell infill adjacent to neighbor's blind wall. | |
| Jun 2, 2022 | Completed final sign-off Oct 2022 | 3341 Jackson St | hallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom.Details
hallway bathroom remodel: install seperation dividing extg bathroom spaces into powder room and full bathroom. all plumbing fixtures remain in same location, toilet added to bathroom. | $25,000 |
| May 27, 2022 | Completed final sign-off Jul 2022 | 134 Nevada St | bathroom remodel in-kind. no relocations, no changes to smoke detectors.Details
bathroom remodel in-kind. no relocations, no changes to smoke detectors. | $39,500 |
| May 3, 2022 | Completed final sign-off Sep 2022 | 330 Arguello Bl | unit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers.Details
unit 3: install new half bathroom using (e) closet space- includes new toilet & vanity (no shower or tub). no alteration to fire sspinklers. | $45,500 |
| Apr 25, 2022 | Completed final sign-off Dec 2022 | 1860 Page St | hallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system.Details
hallway bathroom and master bathroom full remodel - no fixture relocations. no work on fire sprinkler system. | $67,000 |
| Apr 21, 2022 | Completed final sign-off Oct 2022 | 1290 45th Av | bathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers.Details
bathroom remodel: cancel shower, combine (e) tub with shower. relocate toilet. add 2nd vanity sink. no work to fire sprinklers. | $34,500 |
| Apr 21, 2022 | Completed final sign-off Jan 2023 | 66 Bret Harte Tr | full remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed.Details
full remodel of (e) master bathroom, including relocation of shower and toilet. installation of new bathtub. addition of 2nd sink & adjustment to (e) window frame.no structural, no layout change. non str wall next to water closet removed. | $39,000 |
| Mar 28, 2022 | Completed final sign-off Sep 2023 | 370 Maynard St | 1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kindDetails
1/f bathroom remodel in kind. led lights 3 vacancy sensors, replace exh fan in-kind | $30,000 |
| Mar 28, 2022 | Never finaled issued Apr 2022, no final | 124 Nevada St | bathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind.Details
bathroom remodel in kind @ 1st floor.led lights with occupancy sensors. replace exh fan in-kind. | $39,500 |
| Dec 15, 2021 | Never finaled issued Jan 2022, no final | 51 Oakwood St | full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier)Details
full bathroom remodel in kind: (no changes to layout or fixtures count) full kitchen remodel in kind (no change to layout or fixtures count) lighting install 16 new light fixtures (15 recessed lights, 1 new chandelier) | $90,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 1559 Jerrold Av | hallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system.Details
hallway bathroom: #1 remodel in kind (shower, all plumbing fixtures remain in same location- add 2nd sink to existing 60" vanity no layout changes) no work to existing fire system. | $30,000 |
| Dec 15, 2021 | Completed final sign-off Apr 2023 | 1559 Jerrold Av | hallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire systemDetails
hallway bathroom: full remodel in kind: tub, all plumbing fixtures to remain in same location. no work to existing fire system | $27,000 |
| Sep 3, 2021 | Completed final sign-off Nov 2021 | 850 45th Av | remodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k)Details
remodel bathroom in-kind no plumbing relocations: no work to fire sprinklers. lights per cenc 150.0 (k) | $28,400 |
| Aug 16, 2021 | Completed final sign-off Nov 2021 | 850 45th Av | remodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers.Details
remodel master bathroom: convert jacuzzi tub to walk-in shower, cancel existing shower, relocate vanity (2 sinks). adjust toilet location (relocate approx. 6"). no work to fire sprinklers. | $34,600 |
| Jun 9, 2021 | Completed final sign-off Jan 2022 | 2114 Wawona St | new bathroom @ 1/fDetails
new bathroom @ 1/f | $10,000 |
| Apr 29, 2021 | Completed final sign-off Oct 2021 | 850 Guerrero St | remodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondaryDetails
remodel water closet with toilet staying at same location, add secondary heated flooring unit (electric) remodel bathroom in kind (all fixtures keep same location) add heated floorning unit (elec) secondary | $93,000 |
| Feb 24, 2021 | Completed final sign-off Aug 2021 | 3016 20th Av | convert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated.Details
convert half bathroom to full bathroom by converting adjacent closet to walk-in shower + incorporating existing hallway space. vanity relocated. | $29,000 |
| Feb 16, 2021 | Completed final sign-off Feb 2022 | 2114 Wawona St | full bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan.Details
full bathroom remodel, replace all plumbing fixtures in-kind (separate bathtub & shower, toilet & vanity). install 6 new rececessed lights & fan. | $28,000 |
| Feb 4, 2021 | Completed final sign-off Jun 2021 | 2011 03rd St | full bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms.Details
full bathroom remodel, all fixtures in same locaiton - convert tub to shower (keep same location). no alterations to sprinklers or fire alarms. | $23,000 |
| Jan 4, 2021 | Completed final sign-off Sep 2021 | 875 South Van Ness Av | unit 875: remodel existing bathroom & kitchen. add master bathroom.Details
unit 875: remodel existing bathroom & kitchen. add master bathroom. | $25,000 |
| Aug 21, 2020 | Never finaled issued Nov 2021, no final | 209 Quintara St | interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath.Details
interior alteration @ grd flr: 1 car capacity garage, a family room & (n) bathroom w/ shower.(n) furnace & water heater. lower back yard grd adjacent to bldg for 10' to create patio & steps for access.water proofing @ retaining wall. lower portion of grd flr for (n) family rm & bath. | $50,000 |