Harmony Design & Development Inc
- Based in
- Pacifica
- On San Francisco permits
- Aug 2020 to Mar 2026
- Last 24 months
- 18 permits filed
64 permits since 2000: 46 completed, 9 in progress, 6 never finaled, 3 expired or cancelled.
Of the 6 never-finaled permits, 6 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 expired or cancelled. Typically 38 days from filing to permit.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 1, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell.Details
revision to pa # 2022-1206-7705 remove & replace siding at rear & side btwn grid g & h. replace dry rotted posts at grid h1 + h4; reframe 2nd fl wall on grid 1 btwn grid g & h. adjust preapproved deck supports; shift preapproved 1st & 2nd fl stairs 12" east; remove siding at lightwell. | $10,000 |
| Feb 9, 2024 | Expired or cancelled expired Jan 2026 | 3676 17th St | revision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below.Details
revision to pa#202212067705 due to zoning change. eliminate 3rd floor open patio space & replace with 100 sq ft cantilevered deck within building buildable area and > 3'-0" off any property line. cut back extg 2nd floor deck to align w/n retaining wall below. | $20,000 |