Hardman-Riedell Const.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 53 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
7 stairs permits: 6 completed, 1 never finaled. Typically 0 days from filing to permit and 58 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 17, 2017 | Completed final sign-off Apr 2017 | 46 Marston Av | repair dryrot damage to under sie of existing brick entry staircase, in kind. (replace less that 50% of the stair elements)Details
repair dryrot damage to under sie of existing brick entry staircase, in kind. (replace less that 50% of the stair elements) | $5,000 |
| Jul 5, 2013 | Completed final sign-off Jul 2015 | 2516 Gough St | remodel 2 and 1/2 bathrms, kitchen, master closet, misc interior partitions, replacement of (e) windows in kind with new wood dble glazed windows, enclose north wall below exterior stair & landing per planDetails
remodel 2 and 1/2 bathrms, kitchen, master closet, misc interior partitions, replacement of (e) windows in kind with new wood dble glazed windows, enclose north wall below exterior stair & landing per plan | $95,000 |
| May 28, 2013 | Never finaled issued Jul 2013, no final | 2763 Filbert St | addition of 2 internal stairs & adding conditioned space at the 3rd floor attic, add 2 skylights (not visible from street).Details
addition of 2 internal stairs & adding conditioned space at the 3rd floor attic, add 2 skylights (not visible from street). | $40,000 |
| Oct 18, 2011 | Completed final sign-off Dec 2011 | 99 Uranus Tr | dry rot repairs to exterior staircase (entry) in kind. less than 50%Details
dry rot repairs to exterior staircase (entry) in kind. less than 50% | $9,500 |
| Aug 24, 2011 | Completed final sign-off Sep 2011 | 1319 Dolores St | replace dry rotted handrail in kind at front staircase, existing spindles to remain, repl dry rotted treads & risers as needed, less than 50% repair, no chane to window walls or doorsDetails
replace dry rotted handrail in kind at front staircase, existing spindles to remain, repl dry rotted treads & risers as needed, less than 50% repair, no chane to window walls or doors | $4,000 |
| Jul 8, 2005 | Completed final sign-off Aug 2005 | 1083 York St | submit drawings for full stair replacement.rev.to appl#200503217979Details
submit drawings for full stair replacement.rev.to appl#200503217979 | |
| Mar 21, 2005 | Completed final sign-off Aug 2005 | 1083 York St | replace front stairs in kind from sidewalk to landing at front doors. add wrought iron handrail.Details
replace front stairs in kind from sidewalk to landing at front doors. add wrought iron handrail. | $11,000 |