Hardman-Riedell Const.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 53 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 2 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 116 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2019 | Expired or cancelled cancelled Jan 2026 | 475 17th Av | constru rear deck to exteriorDetails
constru rear deck to exterior | $10,000 |
| Jul 28, 2009 | Completed final sign-off Dec 2009 | 3464 Clay St | replace (e) galvanized pipe railings at rear of house at 2nd and 3rd floor decks with new tempered glass panels on aluminium railingsDetails
replace (e) galvanized pipe railings at rear of house at 2nd and 3rd floor decks with new tempered glass panels on aluminium railings | $7,500 |
| Sep 20, 2007 | Completed final sign-off Feb 2008 | 2552 Baker St | repair dry rot at deck (rear deck) approx 30% of deck.Details
repair dry rot at deck (rear deck) approx 30% of deck. | $15,000 |
| Aug 6, 2004 | Never finaled issued Aug 2004, no final | 3464 Clay St | replace (e) 2x6 redwood deck boards with 1x6 teak deckingDetails
replace (e) 2x6 redwood deck boards with 1x6 teak decking | $25,000 |