Back to bathroom remodel contractors
Hardman-Riedell Const.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Mar 2019
- Last 24 months
- 0 permits filed
66 permits since 2000: 53 completed, 6 never finaled, 7 expired or cancelled.
Of the 6 never-finaled permits, 2 are 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 13 completed. Typically 0 days from filing to permit and 177 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2018 | Completed final sign-off Sep 2018 | 1724 Lyon St | kitchen and bathroom remodel. no structural workDetails
kitchen and bathroom remodel. no structural work | $43,000 |
| Mar 19, 2013 | Completed final sign-off Jul 2013 | 93 Uranus Tr | install new lower base cabinets in kitchn in existing configuration, new couners & splash, new tile floor at kitchn and powder bath, new vanity & fixtures at powder bath, upgrade elec outlets throughout house, repl appliancesDetails
install new lower base cabinets in kitchn in existing configuration, new couners & splash, new tile floor at kitchn and powder bath, new vanity & fixtures at powder bath, upgrade elec outlets throughout house, repl appliances | $22,000 |
| Sep 15, 2010 | Completed final sign-off Jun 2011 | 80 Rockwood Ct | remodel baths on lower & middle fls; new vanities, vanity tops,sinks,facuets,shower valves,tub at middle fl. reuse exist'g tub at lower fl. all plumbing to remain in same locations. repair dry rot @middle bath floor and walls. no wall relocation.provide high efficency lights & "manual on" sensorDetails
remodel baths on lower & middle fls; new vanities, vanity tops,sinks,facuets,shower valves,tub at middle fl. reuse exist'g tub at lower fl. all plumbing to remain in same locations. repair dry rot @middle bath floor and walls. no wall relocation.provide high efficency lights & "manual on" sensor | $40,000 |
| Jan 7, 2009 | Completed final sign-off Jul 2009 | 1925 Gough St | #32 - new kitchen cabients, appliances, new powder bath, master bath & closet, new recessed lighting throughout unit, drywall & structural strengthening work.Details
#32 - new kitchen cabients, appliances, new powder bath, master bath & closet, new recessed lighting throughout unit, drywall & structural strengthening work. | $200,000 |
| Sep 8, 2008 | Completed final sign-off Feb 2009 | 1925 Gough St | demolish wall & ceiling surfaces at kitchen and master bathroom to expose existing framing for structural review. no structural work. 1 kitche, and 1 bath remodel all at 1 unit.Details
demolish wall & ceiling surfaces at kitchen and master bathroom to expose existing framing for structural review. no structural work. 1 kitche, and 1 bath remodel all at 1 unit. | $20,000 |
| Feb 21, 2008 | Completed final sign-off Mar 2008 | 1650 Jackson St | unit 308 - replace water damaged drywall at bathroom, laundry & hallway. replace water damage baseboard at hallway and laundry. no new framing, repaint.Details
unit 308 - replace water damaged drywall at bathroom, laundry & hallway. replace water damage baseboard at hallway and laundry. no new framing, repaint. | $2,500 |
| Feb 21, 2008 | Completed final sign-off Apr 2008 | 1650 Jackson St | unit 608 - replace water damaged drywall at bathroom & hallway. replace water damaged baseboard at hallway. no new framing. repaint.Details
unit 608 - replace water damaged drywall at bathroom & hallway. replace water damaged baseboard at hallway. no new framing. repaint. | $2,750 |
| Jan 22, 2008 | Completed final sign-off Jul 2012 | 1820 Vallejo St | non structural bath remodel. remove existing finishes in the bath room. install new drywall, lights, plumbing fixtures, cabinet, tile.min 50% of kitchen lighting wattage must be of fluorescent lights.Details
non structural bath remodel. remove existing finishes in the bath room. install new drywall, lights, plumbing fixtures, cabinet, tile.min 50% of kitchen lighting wattage must be of fluorescent lights. | $35,000 |
| Apr 3, 2007 | Completed final sign-off May 2008 | 1722 Lyon St | kitchen, bath and structural work per sheet s1 & s2, dated 10/10/06 as drawing by earthquake and structures, inc.Details
kitchen, bath and structural work per sheet s1 & s2, dated 10/10/06 as drawing by earthquake and structures, inc. | $150,000 |
| Oct 20, 2004 | Completed final sign-off Apr 2005 | 2519 Octavia St | install new vanity, toilet and shower tile, new wall board at(e) bathroom.Details
install new vanity, toilet and shower tile, new wall board at(e) bathroom. | $15,000 |
| Aug 14, 2003 | Completed final sign-off Feb 2004 | 1020 Union St | remodel master bath, guest bath and kchnDetails
remodel master bath, guest bath and kchn | $30,000 |
| Nov 14, 2001 | Completed final sign-off Apr 2002 | 765 Market St | install new master bath vaninty cabinets, sink & top, wet bar cabinets,bookcases at library........Details
install new master bath vaninty cabinets, sink & top, wet bar cabinets,bookcases at library........ | $50,000 |
| Feb 1, 2000 | Completed final sign-off Dec 2000 | 3464 Clay St | relocate mstr bath & plumbing and remove cabinetsDetails
relocate mstr bath & plumbing and remove cabinets | $100,000 |