Back to kitchen remodel contractors
Handyman Professionals Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Aug 2008
- Last 24 months
- 0 permits filed
23 permits since 2000: 18 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
4 kitchen remodel permits: 4 completed. Typically 0 days from filing to permit and 168 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2008 | Completed final sign-off Oct 2008 | 1980 Vallejo St | replace countertops/ replace doors + drawer fronts/tile kitchen laudryroom floor/paint. no doors/windows/walls under this permit. life safety under separate permits.Details
replace countertops/ replace doors + drawer fronts/tile kitchen laudryroom floor/paint. no doors/windows/walls under this permit. life safety under separate permits. | $12,000 |
| Apr 24, 2008 | Completed final sign-off Sep 2008 | 360 Guerrero St | kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches.Details
kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches. | $18,000 |
| Oct 9, 2007 | Completed final sign-off Apr 2008 | 1035 Fell St | kitchen remodel. no structural changes or exterior changes. update & upgrade lighting, cabinetry, hood vent, new dry wall, no plumbing centerline changes.Details
kitchen remodel. no structural changes or exterior changes. update & upgrade lighting, cabinetry, hood vent, new dry wall, no plumbing centerline changes. | $15,000 |
| Aug 31, 2007 | Completed final sign-off Mar 2008 | 28 Keystone Wy | new lighting in kitchen remodel on 2nd floor. replace cabinetry, counters and appliance & flooring. reroute gas line into cabinet. install hood to existing ductwork/penetration. remove built in hutch in-fill opening.Details
new lighting in kitchen remodel on 2nd floor. replace cabinetry, counters and appliance & flooring. reroute gas line into cabinet. install hood to existing ductwork/penetration. remove built in hutch in-fill opening. | $8,000 |