Back to bathroom remodel contractors
Handyman Professionals Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Aug 2008
- Last 24 months
- 0 permits filed
23 permits since 2000: 18 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
10 bathroom remodel permits: 8 completed, 1 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 124 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2008 | Completed final sign-off Sep 2008 | 360 Guerrero St | kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches.Details
kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches. | $18,000 |
| Mar 7, 2008 | Completed final sign-off Mar 2008 | 950 Harrison St | in unit #209: bathroom remodel. no structural changes or elec changes. update upgrade lighting cabinetry. no plmbg changes. new sink and fuacet, new shower valve and shower headDetails
in unit #209: bathroom remodel. no structural changes or elec changes. update upgrade lighting cabinetry. no plmbg changes. new sink and fuacet, new shower valve and shower head | $5,000 |
| Oct 9, 2007 | Expired or cancelled cancelled Mar 2008 | 950 Harrison St | work @ unit# 109 only. bathroom remodel. no structural changes or elec changes. update & upgrade lighting cabinerty. no plumbing changes. new sink & faucet. new shower valve & shower head.Details
work @ unit# 109 only. bathroom remodel. no structural changes or elec changes. update & upgrade lighting cabinerty. no plumbing changes. new sink & faucet. new shower valve & shower head. | $5,000 |
| Sep 10, 2007 | Completed final sign-off Apr 2008 | 3729 26th St | remodel bathroom on 2nd fl - replace tub w/steam shower, constr. soffit, install new cabinet, vanity, sink/toilet, connect exhaust fan to existing roof termination. 50% lighting to be h.e.Details
remodel bathroom on 2nd fl - replace tub w/steam shower, constr. soffit, install new cabinet, vanity, sink/toilet, connect exhaust fan to existing roof termination. 50% lighting to be h.e. | $12,000 |
| Aug 21, 2007 | Completed final sign-off Apr 2008 | 2353 Larkin St | convert bedroom to master bath on 2nd floor. all lighting to be recessed flourescent lighting.Details
convert bedroom to master bath on 2nd floor. all lighting to be recessed flourescent lighting. | $14,000 |
| Aug 2, 2007 | Completed final sign-off Mar 2008 | 2191 27th Av | renovation of 2nd floor bathroom. all lighting to be h.e. unless lighting controlled by occupant sensorDetails
renovation of 2nd floor bathroom. all lighting to be h.e. unless lighting controlled by occupant sensor | $12,000 |
| Jul 24, 2007 | Completed final sign-off Sep 2007 | 861 27th St | adding 1/2 bath to existing living space. no foundation or structural work. installation of vent/light combo. add wall mount sink and toilet.Details
adding 1/2 bath to existing living space. no foundation or structural work. installation of vent/light combo. add wall mount sink and toilet. | $7,000 |
| Jul 3, 2007 | Completed final sign-off Oct 2007 | 485 14th Av | unit #483 only-minor bathroom remodel, minor powder room remodel. 50% of all lighting will be flourscentDetails
unit #483 only-minor bathroom remodel, minor powder room remodel. 50% of all lighting will be flourscent | $12,000 |
| Apr 16, 2007 | Completed final sign-off May 2007 | 1050 North Point St | paint one kchn cbnts, install new granite countertops, replace stove/ oven. install new laminate flooring. paint cbnts in 1 bath (hall) install nw marble flooring. replace light. paint cbnts in 1 bath(master) install new marble flooring , replace lightDetails
paint one kchn cbnts, install new granite countertops, replace stove/ oven. install new laminate flooring. paint cbnts in 1 bath (hall) install nw marble flooring. replace light. paint cbnts in 1 bath(master) install new marble flooring , replace light | $15,240 |
| Mar 27, 2007 | Never finaled issued Mar 2007, no final | 2353 Larkin St | work @ upper unit only. remove (e) plumbing fixtures at tub / shower . remove (e) pedastol sink, toilet & replace in bathroom# 2. new tile surround & floor. remove & replace (e) vanity, toilet, shower fixtures & new tile surround & floor. bath# 1. electrical to stay in (e) locations for both baths.Details
work @ upper unit only. remove (e) plumbing fixtures at tub / shower . remove (e) pedastol sink, toilet & replace in bathroom# 2. new tile surround & floor. remove & replace (e) vanity, toilet, shower fixtures & new tile surround & floor. bath# 1. electrical to stay in (e) locations for both baths. | $22,000 |