Handyman Professionals Inc
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to Aug 2008
- Last 24 months
- 0 permits filed
23 permits since 2000: 18 completed, 2 never finaled, 3 expired or cancelled.
Of the 2 never-finaled permits, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for all building permits across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Most recent permits
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 4, 2008 | Completed final sign-off Oct 2008 | 1980 Vallejo St | replace countertops/ replace doors + drawer fronts/tile kitchen laudryroom floor/paint. no doors/windows/walls under this permit. life safety under separate permits.Details
replace countertops/ replace doors + drawer fronts/tile kitchen laudryroom floor/paint. no doors/windows/walls under this permit. life safety under separate permits. | $12,000 |
| May 29, 2008 | Completed final sign-off Jul 2008 | 191 Delmar St | frame in door from bedroom. install new exhaust fan to (e) penitration. relocate supplea & waste for sink. install new shower / tub valve with auxilary hand held shower. install 2 new circuits. (gfi) switches & sconces & gfi outlets, tile.Details
frame in door from bedroom. install new exhaust fan to (e) penitration. relocate supplea & waste for sink. install new shower / tub valve with auxilary hand held shower. install 2 new circuits. (gfi) switches & sconces & gfi outlets, tile. | $12,000 |
| May 28, 2008 | Completed final sign-off Sep 2008 | 451 Kansas St | work on unit#619.replace standard tub with jaccuzi tubb add dedicatted gfi circuit raise tub/shower valve 6-8" tub same size 60"x32"x19" deep.Details
work on unit#619.replace standard tub with jaccuzi tubb add dedicatted gfi circuit raise tub/shower valve 6-8" tub same size 60"x32"x19" deep. | $7,500 |
| May 16, 2008 | Completed final sign-off Jul 2008 | 535 Broderick St | replace deterioraten decking @ landings stabilize handrails per nov#200710835.Details
replace deterioraten decking @ landings stabilize handrails per nov#200710835. | $2,500 |
| Apr 24, 2008 | Completed final sign-off Sep 2008 | 360 Guerrero St | kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches.Details
kitchen remodel: removed and dreplace counters, cabinets, flooring, lighting (flourescent) and appliances, outlets and switches. bathroom remodel: removed tub convert to shower. change valve, sink, valve, flooring & lighting (flourescent) outlet and switches. | $18,000 |
| Apr 18, 2008 | Completed final sign-off Oct 2008 | 324 London St | remove illegal stairs and deck, replace doors with windows, replace abs plumbing fixtures with metal per sf codes, repair damaged drain lines. comply with nov# 200842172 dated 2-4-08Details
remove illegal stairs and deck, replace doors with windows, replace abs plumbing fixtures with metal per sf codes, repair damaged drain lines. comply with nov# 200842172 dated 2-4-08 | $15,000 |
| Apr 3, 2008 | Completed final sign-off Apr 2008 | 2353 Larkin St | renew pa #20703277357 for final inspection.Details
renew pa #20703277357 for final inspection. | |
| Mar 7, 2008 | Completed final sign-off Mar 2008 | 950 Harrison St | in unit #209: bathroom remodel. no structural changes or elec changes. update upgrade lighting cabinetry. no plmbg changes. new sink and fuacet, new shower valve and shower headDetails
in unit #209: bathroom remodel. no structural changes or elec changes. update upgrade lighting cabinetry. no plmbg changes. new sink and fuacet, new shower valve and shower head | $5,000 |
| Oct 9, 2007 | Expired or cancelled cancelled Mar 2008 | 950 Harrison St | work @ unit# 109 only. bathroom remodel. no structural changes or elec changes. update & upgrade lighting cabinerty. no plumbing changes. new sink & faucet. new shower valve & shower head.Details
work @ unit# 109 only. bathroom remodel. no structural changes or elec changes. update & upgrade lighting cabinerty. no plumbing changes. new sink & faucet. new shower valve & shower head. | $5,000 |
| Oct 9, 2007 | Completed final sign-off Apr 2008 | 1035 Fell St | kitchen remodel. no structural changes or exterior changes. update & upgrade lighting, cabinetry, hood vent, new dry wall, no plumbing centerline changes.Details
kitchen remodel. no structural changes or exterior changes. update & upgrade lighting, cabinetry, hood vent, new dry wall, no plumbing centerline changes. | $15,000 |
| Sep 10, 2007 | Completed final sign-off Apr 2008 | 3729 26th St | remodel bathroom on 2nd fl - replace tub w/steam shower, constr. soffit, install new cabinet, vanity, sink/toilet, connect exhaust fan to existing roof termination. 50% lighting to be h.e.Details
remodel bathroom on 2nd fl - replace tub w/steam shower, constr. soffit, install new cabinet, vanity, sink/toilet, connect exhaust fan to existing roof termination. 50% lighting to be h.e. | $12,000 |
| Aug 31, 2007 | Completed final sign-off Mar 2008 | 28 Keystone Wy | new lighting in kitchen remodel on 2nd floor. replace cabinetry, counters and appliance & flooring. reroute gas line into cabinet. install hood to existing ductwork/penetration. remove built in hutch in-fill opening.Details
new lighting in kitchen remodel on 2nd floor. replace cabinetry, counters and appliance & flooring. reroute gas line into cabinet. install hood to existing ductwork/penetration. remove built in hutch in-fill opening. | $8,000 |
| Aug 21, 2007 | Completed final sign-off Apr 2008 | 2353 Larkin St | convert bedroom to master bath on 2nd floor. all lighting to be recessed flourescent lighting.Details
convert bedroom to master bath on 2nd floor. all lighting to be recessed flourescent lighting. | $14,000 |
| Aug 2, 2007 | Completed final sign-off Mar 2008 | 2191 27th Av | renovation of 2nd floor bathroom. all lighting to be h.e. unless lighting controlled by occupant sensorDetails
renovation of 2nd floor bathroom. all lighting to be h.e. unless lighting controlled by occupant sensor | $12,000 |
| Jul 24, 2007 | Completed final sign-off Sep 2007 | 861 27th St | adding 1/2 bath to existing living space. no foundation or structural work. installation of vent/light combo. add wall mount sink and toilet.Details
adding 1/2 bath to existing living space. no foundation or structural work. installation of vent/light combo. add wall mount sink and toilet. | $7,000 |
| Jul 3, 2007 | Completed final sign-off Oct 2007 | 485 14th Av | unit #483 only-minor bathroom remodel, minor powder room remodel. 50% of all lighting will be flourscentDetails
unit #483 only-minor bathroom remodel, minor powder room remodel. 50% of all lighting will be flourscent | $12,000 |
| Apr 16, 2007 | Completed final sign-off May 2007 | 1050 North Point St | paint one kchn cbnts, install new granite countertops, replace stove/ oven. install new laminate flooring. paint cbnts in 1 bath (hall) install nw marble flooring. replace light. paint cbnts in 1 bath(master) install new marble flooring , replace lightDetails
paint one kchn cbnts, install new granite countertops, replace stove/ oven. install new laminate flooring. paint cbnts in 1 bath (hall) install nw marble flooring. replace light. paint cbnts in 1 bath(master) install new marble flooring , replace light | $15,240 |
| Mar 27, 2007 | Never finaled issued Mar 2007, no final | 2353 Larkin St | work @ upper unit only. remove (e) plumbing fixtures at tub / shower . remove (e) pedastol sink, toilet & replace in bathroom# 2. new tile surround & floor. remove & replace (e) vanity, toilet, shower fixtures & new tile surround & floor. bath# 1. electrical to stay in (e) locations for both baths.Details
work @ upper unit only. remove (e) plumbing fixtures at tub / shower . remove (e) pedastol sink, toilet & replace in bathroom# 2. new tile surround & floor. remove & replace (e) vanity, toilet, shower fixtures & new tile surround & floor. bath# 1. electrical to stay in (e) locations for both baths. | $22,000 |
| Apr 13, 2006 | Completed final sign-off Sep 2006 | 735 Oak St | work to comply with 3r report 3r-4378. items 1 to 10.Details
work to comply with 3r report 3r-4378. items 1 to 10. | $8,186 |
| May 4, 2005 | Expired or cancelled expired May 2006 | 1966 47th Av | renew app #9907668 for final inspDetails
renew app #9907668 for final insp | |
| May 4, 2005 | Expired or cancelled expired May 2006 | 1966 47th Av | dryrot repair of rear siding expanded to replace lap siding in rear of bldng with t-iii plywood sidiDetails
dryrot repair of rear siding expanded to replace lap siding in rear of bldng with t-iii plywood sidi | $5,000 |
| Apr 22, 2005 | Never finaled issued Apr 2005, no final | 1966 47th Av | increase value of work from $5,000.oo to $15,000. (inspector instructed us to increase size of permiDetails
increase value of work from $5,000.oo to $15,000. (inspector instructed us to increase size of permi | $10,000 |
| Mar 21, 2005 | Completed final sign-off Jan 2006 | 1966 47th Av | repair dryrot in several members.replc plywood,paper,stucco to return to orig condition at entr landDetails
repair dryrot in several members.replc plywood,paper,stucco to return to orig condition at entr land | $5,000 |