Back to bathroom remodel contractors
Handyman Heroes Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to May 2026
- Last 24 months
- 17 permits filed
112 permits since 2000: 86 completed, 7 in progress, 15 never finaled, 4 expired or cancelled.
Of the 15 never-finaled permits, 6 are 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
40 bathroom remodel permits: 34 completed, 1 in progress, 3 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 134 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 10, 2026 | In progress issued Mar 2026 | 203 Holly Park Cr | cosmetic bathroom remodel in kind. no walls being moved. replace in kind tiles, vanity, shower pan. electrical and plumbing updates as needed. no change to floor layout. no change to wall layout. no structural work.Details
cosmetic bathroom remodel in kind. no walls being moved. replace in kind tiles, vanity, shower pan. electrical and plumbing updates as needed. no change to floor layout. no change to wall layout. no structural work. | $25,000 |
| Mar 25, 2025 | Completed final sign-off Aug 2025 | 832 Divisadero St | bathroom remodelDetails
bathroom remodel | $20,000 |
| Jul 29, 2024 | Completed final sign-off Oct 2024 | 22 Kittredge Tr | existing water closet room - add sink and replace toilet in kind. bathroom remove shower stall and replace with tub/shower combo. replace vanityu add light and fan and dedicated circuit.Details
existing water closet room - add sink and replace toilet in kind. bathroom remove shower stall and replace with tub/shower combo. replace vanityu add light and fan and dedicated circuit. | $59,700 |
| May 10, 2024 | Completed final sign-off Sep 2024 | 230 San Fernando Wy | 2 bathroom remodels in kind.Details
2 bathroom remodels in kind. | $48,000 |
| Jan 30, 2024 | Completed final sign-off Feb 2024 | 1397 12th Av | replace bath fan like for like. replace dry rotted door in garage side of garage. like for likeDetails
replace bath fan like for like. replace dry rotted door in garage side of garage. like for like | $3,500 |
| Jan 18, 2024 | Completed final sign-off Mar 2024 | 1895 Pacific Av | unit 406; open sheetrock in closet to access plumbing install washer and ductless dryer in a closet that\t backs up to the bathroom. add electrial circuit and necessary water supply, drain with water vent.Details
unit 406; open sheetrock in closet to access plumbing install washer and ductless dryer in a closet that\t backs up to the bathroom. add electrial circuit and necessary water supply, drain with water vent. | $14,000 |
| May 26, 2023 | Completed final sign-off Oct 2023 | 1244 Washington St | add w/d hookups at master bath. stackable units. comply with all plumbing / electrical requirements.Details
add w/d hookups at master bath. stackable units. comply with all plumbing / electrical requirements. | $7,500 |
| Jan 26, 2023 | Completed final sign-off Mar 2023 | 1231 York St | demo tile and subfloor in bathroom. remove existing toilet and vanity. repair any dry rot. replace subfloor and install new tile. reinstall existing vanity. install new toilet.Details
demo tile and subfloor in bathroom. remove existing toilet and vanity. repair any dry rot. replace subfloor and install new tile. reinstall existing vanity. install new toilet. | $13,000 |
| Dec 22, 2022 | Completed final sign-off Jul 2023 | 1001 Pine St | #412: one bathroom remodel in kind.Details
#412: one bathroom remodel in kind. | $27,950 |
| Oct 25, 2022 | Completed final sign-off May 2023 | 150 Northwood Dr | remodel 2 (e) baths in-kind. remodel kitchen: (n) wall between kitchen & mudroom, enlarge opening between kitchen & dining. replace window sashes at east facade. replace windows at dining (west facade). no change to building footprint. no work at roof.Details
remodel 2 (e) baths in-kind. remodel kitchen: (n) wall between kitchen & mudroom, enlarge opening between kitchen & dining. replace window sashes at east facade. replace windows at dining (west facade). no change to building footprint. no work at roof. | $50,000 |
| Aug 19, 2022 | Completed final sign-off Mar 2024 | 1300 Fell St | unit 2 on 3rd floor: update finishes in existing 3bed, 2bath condo. remodel existing kitchen and baths in kind. add 3rd bath, relocate hall closet. no structural work, no work to building envelope.Details
unit 2 on 3rd floor: update finishes in existing 3bed, 2bath condo. remodel existing kitchen and baths in kind. add 3rd bath, relocate hall closet. no structural work, no work to building envelope. | $90,000 |
| May 27, 2022 | Never finaled issued Jun 2022, no final | 72 Townsend St | remodel primary bathroom in kind. no other work. no walls or fixtures movedDetails
remodel primary bathroom in kind. no other work. no walls or fixtures moved | $20,000 |
| May 5, 2022 | Completed final sign-off Jun 2022 | 619 Wisconsin St | bathroom remodel replace fixtures in kindDetails
bathroom remodel replace fixtures in kind | $20,000 |
| Mar 31, 2022 | Completed final sign-off Jun 2022 | 2075 Sutter St | install 2 bathroom fans, vent to roofDetails
install 2 bathroom fans, vent to roof | $4,000 |
| Feb 24, 2022 | Completed final sign-off May 2022 | 292 Precita Av | unit #292: 1 bathroom remodel in-kind on 3rd fl. ~50 sqft.Details
unit #292: 1 bathroom remodel in-kind on 3rd fl. ~50 sqft. | $22,500 |
| Oct 12, 2021 | Completed final sign-off Apr 2023 | 334 Holladay Av | cosmetic remodel of existing kitchen and 2 existing bathrooms. no structural work. all elements to be replaced in kind.Details
cosmetic remodel of existing kitchen and 2 existing bathrooms. no structural work. all elements to be replaced in kind. | $50,000 |
| Sep 17, 2021 | Completed final sign-off Jul 2025 | 1431 31st Av | interior remodel to develop ground floor rooms within unconditioned sf on lst level adding (1) bedroom & and (1) full bath. remodel of (e) interior stair connecting level and laundry room.Details
interior remodel to develop ground floor rooms within unconditioned sf on lst level adding (1) bedroom & and (1) full bath. remodel of (e) interior stair connecting level and laundry room. | $250,000 |
| May 6, 2021 | Completed final sign-off Aug 2021 | 44 Macondray Ln | bathroom remodel, all elements replaced in-kind, no walls, no structural framing demo. fixtures moved. no work to building envelope. all work to comply w/ current codes including t-24.Details
bathroom remodel, all elements replaced in-kind, no walls, no structural framing demo. fixtures moved. no work to building envelope. all work to comply w/ current codes including t-24. | $15,000 |
| Feb 25, 2020 | Completed final sign-off Jul 2020 | 160 Gardenside Dr | remodel kitchen/bathroom in extg 1/1 condo. no work to bldg envelopeDetails
remodel kitchen/bathroom in extg 1/1 condo. no work to bldg envelope | $40,000 |
| Feb 12, 2020 | Completed final sign-off Aug 2020 | 100 Parker Av | unit 103: cosmetic bathroom remodel. no fixtures moved. tub to remain. no work to building envelope. bathroom remodel in kind.Details
unit 103: cosmetic bathroom remodel. no fixtures moved. tub to remain. no work to building envelope. bathroom remodel in kind. | $11,000 |
| Jan 22, 2020 | Completed final sign-off May 2020 | 1874 32nd Av | remodel bathroom in kind at 2nd fl, fixtures moved. no structural work.Details
remodel bathroom in kind at 2nd fl, fixtures moved. no structural work. | $11,000 |
| Nov 20, 2019 | Completed final sign-off Jun 2020 | 44 Leese St | minor renovations to photography studio: add windows to front wall for natural lght. convert closet into new 1/2 bathroom. renovate (e) kitchen in break room. no commercial food prepDetails
minor renovations to photography studio: add windows to front wall for natural lght. convert closet into new 1/2 bathroom. renovate (e) kitchen in break room. no commercial food prep | $25,000 |
| Aug 12, 2019 | Completed final sign-off Mar 2020 | 925 Corbett Av | to obtain a final inspection for work approved under previous permit pa201801178859. all work is complete for kitchen & bathroom remodel.Details
to obtain a final inspection for work approved under previous permit pa201801178859. all work is complete for kitchen & bathroom remodel. | $10,000 |
| Jul 18, 2019 | Completed final sign-off Oct 2019 | 1440 Broadway | cosmetic remodel of (2) bathrooms. no structural work, no walls/fixtures moved. install (1) tub and (1) shower pan.Details
cosmetic remodel of (2) bathrooms. no structural work, no walls/fixtures moved. install (1) tub and (1) shower pan. | $20,000 |
| Jun 19, 2019 | Completed final sign-off Mar 2022 | 152 Hartford St | add new 1236 sq ft apartment at the (e) storage area on the 1/fl. unit to include great room, study, 3 bedrooms, 2 baths. install (n) nfpa 13 sprinkler system at 1/fl.Details
add new 1236 sq ft apartment at the (e) storage area on the 1/fl. unit to include great room, study, 3 bedrooms, 2 baths. install (n) nfpa 13 sprinkler system at 1/fl. | $122,000 |
| Apr 19, 2019 | Completed final sign-off Oct 2019 | 235 Pierce St | remodel bathroom, convert closet into a half bath.Details
remodel bathroom, convert closet into a half bath. | $2,000 |
| Feb 8, 2019 | Completed final sign-off May 2019 | 650 Delancey St | cosmetic bathroom remodel. no walls moved. install built in shower pan. install vanity, toilet, light fixture, etc. approximate sq ft 48Details
cosmetic bathroom remodel. no walls moved. install built in shower pan. install vanity, toilet, light fixture, etc. approximate sq ft 48 | $11,000 |
| Sep 5, 2018 | Completed final sign-off Apr 2019 | 153 Country Club Dr | demo (e) spces on 1st fle of sfd. proposed new stiar to access new bedroom and bathroom on the 1st flr. relocation of the (e) w/h and new hvac unit. removal of side door w/creating new vestibule btw garage & stairDetails
demo (e) spces on 1st fle of sfd. proposed new stiar to access new bedroom and bathroom on the 1st flr. relocation of the (e) w/h and new hvac unit. removal of side door w/creating new vestibule btw garage & stair | $50,000 |
| Jun 20, 2018 | Never finaled issued Jun 2018, no final | 66 Amethyst Wy | bathroom remodelDetails
bathroom remodel | $22,000 |
| May 29, 2018 | Completed final sign-off Jul 2018 | 66 Amethyst Wy | remodel guest bathroom in-kind, replace fanDetails
remodel guest bathroom in-kind, replace fan | $15,000 |
| May 18, 2018 | Completed final sign-off Jul 2018 | 416 12th Av | at 416(a) remove bathroom & kitchenette in basement, to comply with fire dept requirements.Details
at 416(a) remove bathroom & kitchenette in basement, to comply with fire dept requirements. | $3,500 |
| Apr 3, 2018 | Expired or cancelled cancelled Nov 2022 | 866 36th Av | demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yardDetails
demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yard | $50,000 |
| Oct 13, 2017 | Completed final sign-off Feb 2018 | 2365 Green St | remodel kitchen & 2 bathrooms.Details
remodel kitchen & 2 bathrooms. | $51,000 |
| Aug 16, 2016 | Completed final sign-off Dec 2016 | 866 36th Av | bath remodel. no walls moved. replace in kind. shower/tile over tub, toilet/vanityDetails
bath remodel. no walls moved. replace in kind. shower/tile over tub, toilet/vanity | $15,000 |
| Aug 15, 2016 | Completed final sign-off Dec 2016 | 866 36th Av | remodel walk in closet to include new bathroom.Details
remodel walk in closet to include new bathroom. | $30,000 |
| Jul 29, 2016 | Never finaled issued Jul 2016, no final | 237 Sanchez St | bathroom remodel in-kind; no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5.Details
bathroom remodel in-kind; no new wall and no existing wall relocation. lighting shall comply with cec 150.0(k)5. | $10,000 |
| Jul 27, 2016 | Expired or cancelled cancelled Aug 2016 | 666 36th Av | bath remodel - no walls moved. replace in-kind. shower tile over tub. toilet/vanity.Details
bath remodel - no walls moved. replace in-kind. shower tile over tub. toilet/vanity. | $20,000 |
| Jul 21, 2016 | Completed final sign-off Apr 2017 | 360 Guerrero St | revision to pa 201607182583 to illustrate bathroom being enlarged. prior permit was issued as narrativeDetails
revision to pa 201607182583 to illustrate bathroom being enlarged. prior permit was issued as narrative | |
| Jul 18, 2016 | Completed final sign-off Apr 2017 | 360 Guerrero St | kitchen & bathroom remodel.Details
kitchen & bathroom remodel. | $40,000 |
| Jul 14, 2016 | Completed final sign-off Mar 2017 | 186 Merced Av | remodel kitchen & 2 bathrm, new laundry room, add 1 full bathroom, wetbar and 2 closets at basement. reconfigure interior stair and raise ceiling at living-dining and one bedroom, widen opening from dining to kitchen, add 6 new windows & 1 door. reconfigure 4(e) windows, title 24, new interiorDetails
remodel kitchen & 2 bathrm, new laundry room, add 1 full bathroom, wetbar and 2 closets at basement. reconfigure interior stair and raise ceiling at living-dining and one bedroom, widen opening from dining to kitchen, add 6 new windows & 1 door. reconfigure 4(e) windows, title 24, new interior | $150,000 |