Handyman Heroes Inc.
- Based in
- San Francisco
- On San Francisco permits
- Jun 2016 to May 2026
- Last 24 months
- 17 permits filed
112 permits since 2000: 86 completed, 7 in progress, 15 never finaled, 4 expired or cancelled.
Of the 15 never-finaled permits, 6 are 3 to 5 years old, 5 are 5 to 10 years old, 4 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
6 deck permits: 3 completed, 1 in progress, 1 never finaled, 1 expired or cancelled. Typically 16 days from filing to permit and 25 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2025 | Completed final sign-off Jul 2025 | 282 Louisburg St | deck repair less than 50%. replace 2 rotted joists, 2-3 deck boards. replace in kind. (back of house).Details
deck repair less than 50%. replace 2 rotted joists, 2-3 deck boards. replace in kind. (back of house). | $1,200 |
| Sep 19, 2023 | In progress issued Jun 2024 | 1431 31st Av | new rear deck with stairs & 1hr fire rated walls along property line up to 42" above single level deck,new doors accessing deck & finishes on 2nd level.Details
new rear deck with stairs & 1hr fire rated walls along property line up to 42" above single level deck,new doors accessing deck & finishes on 2nd level. | $90,000 |
| Oct 18, 2018 | Completed final sign-off Nov 2018 | 2160 Vallejo St | selective repair/replace of rotted deck boards @ rear decks/stairways. no change in configuration. no structural work. rear deck stairway. not visible from street. repair in-kind. less than 50% of work.Details
selective repair/replace of rotted deck boards @ rear decks/stairways. no change in configuration. no structural work. rear deck stairway. not visible from street. repair in-kind. less than 50% of work. | $5,500 |
| Apr 3, 2018 | Expired or cancelled cancelled Nov 2022 | 866 36th Av | demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yardDetails
demo existing rear porch, laundry room, half bath, stairs. new addition laundry room bathroom, bedroom and side deck/staris to rear yard | $50,000 |
| Nov 23, 2016 | Never finaled filed Nov 2016, never issued | 1457 Fulton St | to comply with niv 200907332 item #1 - rebuild rear deck per plans. iten #2 - verify concrete work at frontDetails
to comply with niv 200907332 item #1 - rebuild rear deck per plans. iten #2 - verify concrete work at front | $20,000 |
| Jun 24, 2016 | Completed final sign-off May 2017 | 306 Arlington St | remodel existing upper and lower facades, exposed portion of southwest side wall and entry portal with replacement stucco and foam trim. replacement of existing deck guardrails, with 4" height increase, 3 new windows at lower facade and new decking at existing deckDetails
remodel existing upper and lower facades, exposed portion of southwest side wall and entry portal with replacement stucco and foam trim. replacement of existing deck guardrails, with 4" height increase, 3 new windows at lower facade and new decking at existing deck | $43,000 |