Block 3789, lot 470
650 Delancey St
- City’s use
- Single Family Residential
- Built
- 1996
- Stories
- 4
- Units
- 1
- Rooms
- 3 bedrooms, 2 bathrooms
- Building
- 1,572 sq ft
- Zoning
- M2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
4 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 8, 2019 | Completed final sign-off May 2019 | 650 Delancey St | Handyman Heroes Inc. | cosmetic bathroom remodel. no walls moved. install built in shower pan. install vanity, toilet, light fixture, etc. approximate sq ft 48Details
cosmetic bathroom remodel. no walls moved. install built in shower pan. install vanity, toilet, light fixture, etc. approximate sq ft 48 | $11,000 |
| May 5, 2006 | Completed final sign-off Jun 2006 | 650 Delancey St | Douglas Gower Dba Mesa Construction | renew for final #2005/12/13/0174, 2005/06/29/6403 and 2005/05/16/2560 (to modify address in 2005/06/29/6403 to the proper address as 650 delancey #217 and lot no.470 apt #217Details
renew for final #2005/12/13/0174, 2005/06/29/6403 and 2005/05/16/2560 (to modify address in 2005/06/29/6403 to the proper address as 650 delancey #217 and lot no.470 apt #217 | |
| Dec 13, 2005 | Expired or cancelled expired Jun 2006 | 650 Delancey St | Douglas Gower Dba Mesa Construction | installation of new kitchen cabinet in (e) location, remove non-structural pantry wall. install new cabinetry @ mezzanine level. new lighting at least 50% of lighting high efficiency (he). work had to be shown to dbi inspector.Details
installation of new kitchen cabinet in (e) location, remove non-structural pantry wall. install new cabinetry @ mezzanine level. new lighting at least 50% of lighting high efficiency (he). work had to be shown to dbi inspector. | $3,500 |
| May 16, 2005 | Expired or cancelled expired Jun 2006 | 650 Delancey St | Douglas Gower Dba Mesa Construction | upper level bath remodel.non structural cosmetic remodel replacing (e)lav,tub,toilet with new fixturDetails
upper level bath remodel.non structural cosmetic remodel replacing (e)lav,tub,toilet with new fixtur | $7,500 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Douglas Gower Dba Mesa Construction (3), Handyman Heroes Inc.
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover apartment buildings like this one.