Back to kitchen remodel contractors
Handelin Inc Dba Original Construction C
- Based in
- Fairfax
- On San Francisco permits
- Mar 2000 to Oct 2024
- Last 24 months
- 1 permit filed
94 permits since 2000: 73 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
21 kitchen remodel permits: 18 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 248 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2024 | Completed final sign-off Jan 2025 | 98 Seward St | install 2 new velax skylights into existing comp shingle roof. slope of roof is 5 and 12 pitch. see page 1 of drawings. more than 5 ft away from property line. shed roof is over kitchen and dining room on top of the main floor above basement.Details
install 2 new velax skylights into existing comp shingle roof. slope of roof is 5 and 12 pitch. see page 1 of drawings. more than 5 ft away from property line. shed roof is over kitchen and dining room on top of the main floor above basement. | $22,350 |
| Oct 19, 2021 | Never finaled issued Oct 2021, no final | 2224 Sacramento St | kitchen and bath remodel no structural work. no moving walls.Details
kitchen and bath remodel no structural work. no moving walls. | $140,000 |
| Feb 19, 2020 | Completed final sign-off Nov 2020 | 210 23rd Av | remodel kitchen in kind. no structural work, no exterior work.Details
remodel kitchen in kind. no structural work, no exterior work. | $110,000 |
| Jun 18, 2019 | Completed final sign-off Aug 2020 | 591 Vermont St | remodel kitchen & bathroom. no structural work.Details
remodel kitchen & bathroom. no structural work. | $111,500 |
| Aug 18, 2015 | Completed final sign-off Feb 2016 | 98 Seward St | kitchen remodel - 1 1/2 bath remodel, laundry rm remodel. add dumb waiter. add attic access ladder. ref pa 2015 0306 0141. no structural changes. no exterior workDetails
kitchen remodel - 1 1/2 bath remodel, laundry rm remodel. add dumb waiter. add attic access ladder. ref pa 2015 0306 0141. no structural changes. no exterior work | $133,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | renovation of existing kitchen cabinets (no structural), reconfigure cabinets & appliances, add island & remove soffit (new cabinets), renovation of bathroom - new tile & finishes. new cabinets, t.v. built in as well as closet/pantry configuration.Details
renovation of existing kitchen cabinets (no structural), reconfigure cabinets & appliances, add island & remove soffit (new cabinets), renovation of bathroom - new tile & finishes. new cabinets, t.v. built in as well as closet/pantry configuration. | $125,000 |
| Jul 22, 2014 | Completed final sign-off Mar 2015 | 1815 Laguna St | remove carpeting on 1st level and install new hardwood fl.new kitchen cabinet, cntr,cabinet layout. add banquet, built in cab living rm.remodel 2 bath on 2nd fl, 1/2 bath 1st fl paint, trim as necessaryDetails
remove carpeting on 1st level and install new hardwood fl.new kitchen cabinet, cntr,cabinet layout. add banquet, built in cab living rm.remodel 2 bath on 2nd fl, 1/2 bath 1st fl paint, trim as necessary | $200,000 |
| May 9, 2014 | Completed final sign-off Mar 2015 | 1834 Broderick St | bathroom - paint, regrout tiles, floor repair, remove tub; kitchen - paint , new counters and tile splashes; refinish hardwood floors, new carpets, replace and upgrade some wood moldings, casings & base. no structural workDetails
bathroom - paint, regrout tiles, floor repair, remove tub; kitchen - paint , new counters and tile splashes; refinish hardwood floors, new carpets, replace and upgrade some wood moldings, casings & base. no structural work | $40,000 |
| Aug 20, 2013 | Completed final sign-off Mar 2014 | 1888 Church St | alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor.Details
alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor. | $150,000 |
| Jun 24, 2013 | Never finaled issued Jun 2013, no final | 1888 Church St | kitchen remodel, 2 bathroom remodels, new electrical service (200 amps), new plumbing copper water supplyDetails
kitchen remodel, 2 bathroom remodels, new electrical service (200 amps), new plumbing copper water supply | $200,000 |
| Oct 19, 2012 | Completed final sign-off Mar 2014 | 1009 Francisco St | seismic upgrade - (n) 2-story moment frame. interior non structural remodel of existing finishes and cabinetry. note: kitchens & baths under separate permit #201210182303.Details
seismic upgrade - (n) 2-story moment frame. interior non structural remodel of existing finishes and cabinetry. note: kitchens & baths under separate permit #201210182303. | $350,000 |
| Oct 18, 2012 | Completed final sign-off Mar 2014 | 1009 Francisco St | remodel kitchen and 2 bathrooms, no structural work, re-finish hardwood floors, paint interior, new carpeting.Details
remodel kitchen and 2 bathrooms, no structural work, re-finish hardwood floors, paint interior, new carpeting. | $215,000 |
| Aug 9, 2012 | Completed final sign-off Dec 2012 | 587 Vermont St | kitchen remodel. replace all in same locations. no exterior envelope changes. no walls moving and no structural work. new cabinets, counters, appliances, fixtures, flooring work in 587 vermont.Details
kitchen remodel. replace all in same locations. no exterior envelope changes. no walls moving and no structural work. new cabinets, counters, appliances, fixtures, flooring work in 587 vermont. | $9,240 |
| Feb 3, 2011 | Completed final sign-off Jan 2012 | 1917 Vallejo St | kitchen remodel with removal of rear bay window. new moment frame & general remodeling. new ahu in basement & new water heater at 3rd floor.Details
kitchen remodel with removal of rear bay window. new moment frame & general remodeling. new ahu in basement & new water heater at 3rd floor. | $75,000 |
| Jan 13, 2009 | Completed final sign-off Jun 2009 | 1941 Leavenworth St | kitchen remodel. new cabinets. new counter tops. new appliances. painting. new floor. everything remain in the same locations. new florescent lighting in kitchen to meet code.Details
kitchen remodel. new cabinets. new counter tops. new appliances. painting. new floor. everything remain in the same locations. new florescent lighting in kitchen to meet code. | $22,500 |
| Oct 15, 2008 | Completed final sign-off Nov 2008 | 44 Macondray Ln | work @ unit# 4 only. upgrade bathroom. new toilet, sink, faucet, vanity, med cabinet, light fixtures (2). new tub, new tile at tub / shower. upgrade kitchen. new sink, faucet, counter top & splash everything stays in same locations. paint bathroom, kitchen & 1 hall way. provide fluorescent light orDetails
work @ unit# 4 only. upgrade bathroom. new toilet, sink, faucet, vanity, med cabinet, light fixtures (2). new tub, new tile at tub / shower. upgrade kitchen. new sink, faucet, counter top & splash everything stays in same locations. paint bathroom, kitchen & 1 hall way. provide fluorescent light or | $22,500 |
| Jan 31, 2007 | Completed final sign-off Jun 2007 | 1915 Vallejo St | replace powder room pedestal sink with new wood vanity. install new stove in same location. install new kitchen sink and faucet. (n) light fixtures.Details
replace powder room pedestal sink with new wood vanity. install new stove in same location. install new kitchen sink and faucet. (n) light fixtures. | $18,500 |
| Jun 19, 2006 | Completed final sign-off Sep 2006 | 100 Lansdale Av | kitchen remodel, change cabinets, counters, appliances, sink, bring electrical upto code. no alter of structural, windows or wall. paint.Details
kitchen remodel, change cabinets, counters, appliances, sink, bring electrical upto code. no alter of structural, windows or wall. paint. | $67,000 |
| Oct 20, 2004 | Expired or cancelled expired Apr 2007 | 235 17th Av | remodel bath and replace kitchen cntrtops. no movement of int walls, no ext changes, new bath fix,Details
remodel bath and replace kitchen cntrtops. no movement of int walls, no ext changes, new bath fix, | $25,000 |
| Jul 26, 2004 | Completed final sign-off Jul 2005 | 1809 Taylor St | remodel kitchen & bath,new cabinets,countertops,fixtures,tile,floors.no wall movements or changes,Details
remodel kitchen & bath,new cabinets,countertops,fixtures,tile,floors.no wall movements or changes, | $68,500 |
| Dec 16, 2003 | Completed final sign-off Sep 2004 | 1784 Sanchez St | kitchen repair, sheetrock, framing, add gas stove, new sink & cabinets,painting & wood trim. noDetails
kitchen repair, sheetrock, framing, add gas stove, new sink & cabinets,painting & wood trim. no | $5,000 |