Back to bathroom remodel contractors
Handelin Inc Dba Original Construction C
- Based in
- Fairfax
- On San Francisco permits
- Mar 2000 to Oct 2024
- Last 24 months
- 1 permit filed
94 permits since 2000: 73 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 25 completed, 6 never finaled, 7 expired or cancelled. Typically 0 days from filing to permit and 262 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 14, 2024 | Completed final sign-off Jul 2024 | 100 Lansdale Av | one bath remodel-all new fixtures-vanity-shower enclosure. no exterior changes. demo down t0 framiing-insulate-drywall. no structural work. new tile w/waterproofing-paintingDetails
one bath remodel-all new fixtures-vanity-shower enclosure. no exterior changes. demo down t0 framiing-insulate-drywall. no structural work. new tile w/waterproofing-painting | $70,850 |
| Jun 29, 2023 | Expired or cancelled cancelled Jan 2025 | 587 Vermont St | bath remodel for 587 vermont street. remove 1 light fixture and put back. remove and put back plumbing fixtures. fix pipe leak. small patches and painting after leak repairs. re-install fixtures. no exterior work and no structural work. no removal of wallsDetails
bath remodel for 587 vermont street. remove 1 light fixture and put back. remove and put back plumbing fixtures. fix pipe leak. small patches and painting after leak repairs. re-install fixtures. no exterior work and no structural work. no removal of walls | $8,500 |
| May 25, 2022 | Never finaled issued May 2022, no final | 100 Lansdale Av | repair to electric meter box and transiition can. can has rusted out and fallen off wall. one bath remodel- new fixtures and painting- 1 bath.Details
repair to electric meter box and transiition can. can has rusted out and fallen off wall. one bath remodel- new fixtures and painting- 1 bath. | $21,200 |
| Apr 19, 2022 | Completed final sign-off Oct 2022 | 890 De Haro St | bathroom remodel with closet. no structural work will be done. no exterior changes will be done.Details
bathroom remodel with closet. no structural work will be done. no exterior changes will be done. | $62,300 |
| Oct 19, 2021 | Never finaled issued Oct 2021, no final | 2224 Sacramento St | kitchen and bath remodel no structural work. no moving walls.Details
kitchen and bath remodel no structural work. no moving walls. | $140,000 |
| Jun 21, 2021 | Completed final sign-off Dec 2021 | 1925 Gough St | bath remodel. no structural work. no changes to envelope. no moving walls.Details
bath remodel. no structural work. no changes to envelope. no moving walls. | $125,000 |
| Jun 15, 2021 | Never finaled issued Jun 2021, no final | 8 Rossi Av | one bathroom remodel - all new fixtures. no structuralDetails
one bathroom remodel - all new fixtures. no structural | $35,000 |
| Jun 18, 2019 | Completed final sign-off Aug 2020 | 591 Vermont St | remodel kitchen & bathroom. no structural work.Details
remodel kitchen & bathroom. no structural work. | $111,500 |
| May 3, 2018 | Completed final sign-off Aug 2018 | 2217 California St | two bathrooms remodel. no structural work.Details
two bathrooms remodel. no structural work. | $74,487 |
| Apr 28, 2016 | Completed final sign-off Feb 2017 | 1089 Chestnut St | level 1: renovate bath, new front door. level 2 renovate bathrooms, level 3: renovate 1/2 bath pantry, lev 4: renovate bth, relocate egress door, relocate wetbar. all levels: glass guardrails at stairs exterior. square off eyebrows, fill in north facade around moment frames.Details
level 1: renovate bath, new front door. level 2 renovate bathrooms, level 3: renovate 1/2 bath pantry, lev 4: renovate bth, relocate egress door, relocate wetbar. all levels: glass guardrails at stairs exterior. square off eyebrows, fill in north facade around moment frames. | $20,000 |
| Nov 30, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | revision to app#201507171797. redo all finishes in master bathroom in kind(tile, tub, nuheat lights). redo all finishes in master closet(shelves and cabinets) new led lights in dining room bathroom and where possible. new data low voltage in house. down stairs bathroom renovation in kind.Details
revision to app#201507171797. redo all finishes in master bathroom in kind(tile, tub, nuheat lights). redo all finishes in master closet(shelves and cabinets) new led lights in dining room bathroom and where possible. new data low voltage in house. down stairs bathroom renovation in kind. | $50,000 |
| Aug 27, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck.Details
infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck. | $50,000 |
| Aug 18, 2015 | Completed final sign-off Feb 2016 | 98 Seward St | kitchen remodel - 1 1/2 bath remodel, laundry rm remodel. add dumb waiter. add attic access ladder. ref pa 2015 0306 0141. no structural changes. no exterior workDetails
kitchen remodel - 1 1/2 bath remodel, laundry rm remodel. add dumb waiter. add attic access ladder. ref pa 2015 0306 0141. no structural changes. no exterior work | $133,000 |
| Jul 17, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | renovation of existing kitchen cabinets (no structural), reconfigure cabinets & appliances, add island & remove soffit (new cabinets), renovation of bathroom - new tile & finishes. new cabinets, t.v. built in as well as closet/pantry configuration.Details
renovation of existing kitchen cabinets (no structural), reconfigure cabinets & appliances, add island & remove soffit (new cabinets), renovation of bathroom - new tile & finishes. new cabinets, t.v. built in as well as closet/pantry configuration. | $125,000 |
| May 1, 2015 | Expired or cancelled cancelled Jan 2026 | 210 23rd Av | revision to pa 2013 1125 2741: add skylight to master bathroomDetails
revision to pa 2013 1125 2741: add skylight to master bathroom | |
| Mar 9, 2015 | Completed final sign-off Feb 2017 | 1089 Chestnut St | grade lev: relocate wall, lev 2: install wash/dry, lev 3: renovate kitch, lev 4: renovate bath.Details
grade lev: relocate wall, lev 2: install wash/dry, lev 3: renovate kitch, lev 4: renovate bath. | $40,000 |
| Mar 6, 2015 | Completed final sign-off Feb 2016 | 98 Seward St | bathroom remodel, new fixtures, tile, paint, tec. bring electr. up to code, also plumbing, nothing on exterior. lighting: min. one high efficiency. others also high efficacycocntrolled sensor.Details
bathroom remodel, new fixtures, tile, paint, tec. bring electr. up to code, also plumbing, nothing on exterior. lighting: min. one high efficiency. others also high efficacycocntrolled sensor. | $50,000 |
| Jan 26, 2015 | Never finaled issued Jan 2015, no final | 100 Lansdale Av | bathroom remodel, no structural work, change fixtures, new tile work, upgrade electrical, new 20 amp circuit, upgrade plumbing to copper pipes, no walls removed or added - all remain unchanged.Details
bathroom remodel, no structural work, change fixtures, new tile work, upgrade electrical, new 20 amp circuit, upgrade plumbing to copper pipes, no walls removed or added - all remain unchanged. | $35,000 |
| Jul 22, 2014 | Completed final sign-off Mar 2015 | 1815 Laguna St | remove carpeting on 1st level and install new hardwood fl.new kitchen cabinet, cntr,cabinet layout. add banquet, built in cab living rm.remodel 2 bath on 2nd fl, 1/2 bath 1st fl paint, trim as necessaryDetails
remove carpeting on 1st level and install new hardwood fl.new kitchen cabinet, cntr,cabinet layout. add banquet, built in cab living rm.remodel 2 bath on 2nd fl, 1/2 bath 1st fl paint, trim as necessary | $200,000 |
| May 9, 2014 | Completed final sign-off Mar 2015 | 1834 Broderick St | bathroom - paint, regrout tiles, floor repair, remove tub; kitchen - paint , new counters and tile splashes; refinish hardwood floors, new carpets, replace and upgrade some wood moldings, casings & base. no structural workDetails
bathroom - paint, regrout tiles, floor repair, remove tub; kitchen - paint , new counters and tile splashes; refinish hardwood floors, new carpets, replace and upgrade some wood moldings, casings & base. no structural work | $40,000 |
| Nov 25, 2013 | Completed final sign-off Jan 2016 | 210 23rd Av | horizontally expand 2nd floor on the rear of house, over existing ground and first floor structure to expand the master bedroom and add master bathDetails
horizontally expand 2nd floor on the rear of house, over existing ground and first floor structure to expand the master bedroom and add master bath | $125,000 |
| Oct 2, 2013 | Expired or cancelled expired Nov 2015 | 2872 Washington St | revision to 201308154438: revision 1 closet in bedroom 3. non structural remodel. add closet in another bedroom . alter bathroom #1Details
revision to 201308154438: revision 1 closet in bedroom 3. non structural remodel. add closet in another bedroom . alter bathroom #1 | $30,000 |
| Aug 20, 2013 | Completed final sign-off Mar 2014 | 1888 Church St | alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor.Details
alterations throughout. internal only. remove walls and add beams on 2nd floor. renovate kitchen and one bath. add 1 new bath on 1st floor. add family room on 1st floor. | $150,000 |
| Aug 15, 2013 | Expired or cancelled expired Nov 2015 | 2872 Washington St | bathroom remodel - #2872Details
bathroom remodel - #2872 | $60,000 |
| Jun 24, 2013 | Never finaled issued Jun 2013, no final | 1888 Church St | kitchen remodel, 2 bathroom remodels, new electrical service (200 amps), new plumbing copper water supplyDetails
kitchen remodel, 2 bathroom remodels, new electrical service (200 amps), new plumbing copper water supply | $200,000 |
| Oct 19, 2012 | Completed final sign-off Mar 2014 | 1009 Francisco St | seismic upgrade - (n) 2-story moment frame. interior non structural remodel of existing finishes and cabinetry. note: kitchens & baths under separate permit #201210182303.Details
seismic upgrade - (n) 2-story moment frame. interior non structural remodel of existing finishes and cabinetry. note: kitchens & baths under separate permit #201210182303. | $350,000 |
| Oct 18, 2012 | Completed final sign-off Mar 2014 | 1009 Francisco St | remodel kitchen and 2 bathrooms, no structural work, re-finish hardwood floors, paint interior, new carpeting.Details
remodel kitchen and 2 bathrooms, no structural work, re-finish hardwood floors, paint interior, new carpeting. | $215,000 |
| Oct 3, 2012 | Never finaled issued Oct 2012, no final | 587 Vermont St | bathroom remodel no structual roof leak repair (partial) new w/h replace finish flooring in the rest of house, replace 2 windows at back of house in existing openings in bathroom.Details
bathroom remodel no structual roof leak repair (partial) new w/h replace finish flooring in the rest of house, replace 2 windows at back of house in existing openings in bathroom. | $28,500 |
| Jul 10, 2012 | Completed final sign-off Aug 2012 | 8 Rossi Av | bathroom & powder room remodel, bathroom 6x9, powder 3x7, no structural, new fixtures in same locations. lighting must comply with cec150k, new tile work, new cabinety, re-use existing tub.Details
bathroom & powder room remodel, bathroom 6x9, powder 3x7, no structural, new fixtures in same locations. lighting must comply with cec150k, new tile work, new cabinety, re-use existing tub. | $30,080 |
| Jul 29, 2011 | Completed final sign-off Oct 2011 | 210 23rd Av | remodel bathroom, no structural work, 30% sheetrock removal, new tub/toilet/sink faucet, new tile floor & shower walls, repair sheetrock, paint whole bathroom, all (n) lighting must comply w/cec 150 (k).Details
remodel bathroom, no structural work, 30% sheetrock removal, new tub/toilet/sink faucet, new tile floor & shower walls, repair sheetrock, paint whole bathroom, all (n) lighting must comply w/cec 150 (k). | $15,000 |
| Oct 15, 2008 | Completed final sign-off Nov 2008 | 44 Macondray Ln | work @ unit# 4 only. upgrade bathroom. new toilet, sink, faucet, vanity, med cabinet, light fixtures (2). new tub, new tile at tub / shower. upgrade kitchen. new sink, faucet, counter top & splash everything stays in same locations. paint bathroom, kitchen & 1 hall way. provide fluorescent light orDetails
work @ unit# 4 only. upgrade bathroom. new toilet, sink, faucet, vanity, med cabinet, light fixtures (2). new tub, new tile at tub / shower. upgrade kitchen. new sink, faucet, counter top & splash everything stays in same locations. paint bathroom, kitchen & 1 hall way. provide fluorescent light or | $22,500 |
| Apr 13, 2005 | Expired or cancelled expired Jan 2007 | 2853 Vallejo St | replace 6 toilet,s 2 vanities, 1 shower at 2 existing baths, install 1500 sq ft new hardwood floorsDetails
replace 6 toilet,s 2 vanities, 1 shower at 2 existing baths, install 1500 sq ft new hardwood floors | $63,575 |
| Apr 13, 2005 | Completed final sign-off Apr 2006 | 66 Santa Paula Av | 64sf addition @ lower floor under exist. upper deck., minor interior alterations including upgraded bathroom, exterior deck extension with spaDetails
64sf addition @ lower floor under exist. upper deck., minor interior alterations including upgraded bathroom, exterior deck extension with spa | $125,000 |
| Oct 20, 2004 | Completed final sign-off Jan 2012 | 1336 06th Av | remove built in wood cabinets and frame in 2 new closets in family room and rm on other side of bathDetails
remove built in wood cabinets and frame in 2 new closets in family room and rm on other side of bath | $8,500 |
| Oct 20, 2004 | Expired or cancelled expired Apr 2007 | 235 17th Av | remodel bath and replace kitchen cntrtops. no movement of int walls, no ext changes, new bath fix,Details
remodel bath and replace kitchen cntrtops. no movement of int walls, no ext changes, new bath fix, | $25,000 |
| Sep 30, 2004 | Expired or cancelled expired Feb 2006 | 1336 06th Av | remodel bathroom..Details
remodel bathroom.. | $15,000 |
| Jul 26, 2004 | Completed final sign-off Jul 2005 | 1809 Taylor St | remodel kitchen & bath,new cabinets,countertops,fixtures,tile,floors.no wall movements or changes,Details
remodel kitchen & bath,new cabinets,countertops,fixtures,tile,floors.no wall movements or changes, | $68,500 |
| Sep 15, 2003 | Completed final sign-off Sep 2004 | 1784 Sanchez St | a bathroom remodel-remove plaster off walls, updated elec to current codes-new toilet, sink, faucet,Details
a bathroom remodel-remove plaster off walls, updated elec to current codes-new toilet, sink, faucet, | $7,500 |