Handelin Inc Dba Original Construction C
- Based in
- Fairfax
- On San Francisco permits
- Mar 2000 to Oct 2024
- Last 24 months
- 1 permit filed
94 permits since 2000: 73 completed, 10 never finaled, 11 expired or cancelled.
Of the 10 never-finaled permits, 3 are 3 to 5 years old, 1 is 5 to 10 years old, 6 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 30 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 27, 2015 | Completed final sign-off Jul 2016 | 2305 Scott St | infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck.Details
infill deck /lightwell for new full bath. remove non-rated lattice wall & construct new 1 hour wall assembly on bedroom deck. | $50,000 |
| Jul 22, 2014 | Completed final sign-off Dec 2014 | 2002 Pacific Av | deck repair. new joists and decking. remove and replace e roted joists with new pressure treated joists. additional wwhere necessary. replace 2x decking. keep rail intact through repairs. repair in kind.Details
deck repair. new joists and decking. remove and replace e roted joists with new pressure treated joists. additional wwhere necessary. replace 2x decking. keep rail intact through repairs. repair in kind. | $10,000 |
| Jul 2, 2009 | Completed final sign-off Mar 2010 | 3435 Clay St | unit 4 - revision to pa# 2008.07.25.7628. change west wall of roff deck from 1hr glass to 1 hr fire wall.Details
unit 4 - revision to pa# 2008.07.25.7628. change west wall of roff deck from 1hr glass to 1 hr fire wall. | |
| Apr 13, 2005 | Completed final sign-off Apr 2006 | 66 Santa Paula Av | 64sf addition @ lower floor under exist. upper deck., minor interior alterations including upgraded bathroom, exterior deck extension with spaDetails
64sf addition @ lower floor under exist. upper deck., minor interior alterations including upgraded bathroom, exterior deck extension with spa | $125,000 |