Back to kitchen remodel contractors
Hammerhead Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jul 2009
- Last 24 months
- 0 permits filed
60 permits since 2000: 40 completed, 20 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
12 kitchen remodel permits: 10 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 30, 2008 | Expired or cancelled expired Aug 2009 | 1625 Monterey Bl | remodel of existing kitchen on ground floor. remodel of existing master bath on 2nd floor. no removal of bering walls during construction.Details
remodel of existing kitchen on ground floor. remodel of existing master bath on 2nd floor. no removal of bering walls during construction. | $46,000 |
| Feb 14, 2008 | Completed final sign-off Jun 2008 | 246 28th Av | cosmetic remodel of kitchen and 3 baths. change out door. no moving of walls. upgrade 2 windows on back of house. call work on 1st & 2nd floor.Details
cosmetic remodel of kitchen and 3 baths. change out door. no moving of walls. upgrade 2 windows on back of house. call work on 1st & 2nd floor. | $52,000 |
| Dec 5, 2007 | Expired or cancelled expired Nov 2008 | 145 El Verano Wy | replacement of counters and kitchen cabinets.no structural work.Details
replacement of counters and kitchen cabinets.no structural work. | $18,000 |
| Jun 15, 2007 | Completed final sign-off Jan 2008 | 2555 Filbert St | remodel kitchen. replace extg windows and extg doors at rear(from single glazing to double glazing). replace extg exterior siding with shingle siding at rearDetails
remodel kitchen. replace extg windows and extg doors at rear(from single glazing to double glazing). replace extg exterior siding with shingle siding at rear | $105,000 |
| Jan 19, 2007 | Completed final sign-off Jun 2007 | 1275 Stanyan St | new cabinets in kitchen, upgrade plumbing & electrical. replace front window. replace counter top, garbage disposal, dishwasher. new lighting, replace front door. insulation & floors in living room and replace carpet in bedroom.Details
new cabinets in kitchen, upgrade plumbing & electrical. replace front window. replace counter top, garbage disposal, dishwasher. new lighting, replace front door. insulation & floors in living room and replace carpet in bedroom. | $20,000 |
| Oct 14, 2005 | Completed final sign-off Aug 2007 | 2454 Francisco St | transfer an upper unit flat to a garden unit flat.combine 2 upper floors into 1 flat-unit count maintained.mechanical renovation (plumbing,electrical htg.)horizontal extension at all levels.new baths & kitchens throughout,laundry added to lower unit & upper unit.add new rear deck & stairs from middlDetails
transfer an upper unit flat to a garden unit flat.combine 2 upper floors into 1 flat-unit count maintained.mechanical renovation (plumbing,electrical htg.)horizontal extension at all levels.new baths & kitchens throughout,laundry added to lower unit & upper unit.add new rear deck & stairs from middl | $280,000 |
| Jul 2, 2004 | Completed final sign-off Nov 2004 | 460 Gold Mine Dr | remodel kitchen and add non bearing room divider to create a home office. no structural alteating.Details
remodel kitchen and add non bearing room divider to create a home office. no structural alteating. | $56,000 |
| Apr 19, 2004 | Completed final sign-off Nov 2004 | 2572 Greenwich St | interior remodel of (e)structure,kitchen,2 bathrooms & cosmetic work.no removal of bearing wall.Details
interior remodel of (e)structure,kitchen,2 bathrooms & cosmetic work.no removal of bearing wall. | $287,400 |
| Dec 6, 2001 | Completed final sign-off Feb 2002 | 3122 Steiner St | remodel kitchen 1 bath. no strutural work, no change wallsDetails
remodel kitchen 1 bath. no strutural work, no change walls | $60,000 |
| May 23, 2001 | Completed final sign-off May 2001 | 64 Pleasant St | renea pa#919350 kitchen & front bathroom remodel & finala inpsectionDetails
renea pa#919350 kitchen & front bathroom remodel & finala inpsection | |
| Oct 27, 2000 | Completed final sign-off Jul 2001 | 2121 Divisadero St | dry rot repair, int. demo of existing kitchen and 2 bathroomsDetails
dry rot repair, int. demo of existing kitchen and 2 bathrooms | $2,000 |
| Aug 22, 2000 | Completed final sign-off May 2001 | 64 Pleasant St | remodel kitchen & front bathroom,install over bath 2'x2' skylight,trim & sheetrock repair 18' fr proDetails
remodel kitchen & front bathroom,install over bath 2'x2' skylight,trim & sheetrock repair 18' fr pro | $22,600 |