Back to bathroom remodel contractors
Hammerhead Construction
- Based in
- San Francisco
- On San Francisco permits
- Aug 2000 to Jul 2009
- Last 24 months
- 0 permits filed
60 permits since 2000: 40 completed, 20 expired or cancelled.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
13 bathroom remodel permits: 11 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 167 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2008 | Completed final sign-off May 2009 | 88 King St | work @ unit# 1221 only. remodel existing bathroom. new tile, sheetrock, vanity. remove tub. install shower.Details
work @ unit# 1221 only. remodel existing bathroom. new tile, sheetrock, vanity. remove tub. install shower. | $20,000 |
| Jun 30, 2008 | Expired or cancelled expired Aug 2009 | 1625 Monterey Bl | remodel of existing kitchen on ground floor. remodel of existing master bath on 2nd floor. no removal of bering walls during construction.Details
remodel of existing kitchen on ground floor. remodel of existing master bath on 2nd floor. no removal of bering walls during construction. | $46,000 |
| May 30, 2008 | Completed final sign-off Sep 2008 | 730 Balboa St | remodel 2 existing bathrooms, new lighting to be high efficency, manual or on auto off switch. move location of washer/dryer. no structural work.Details
remodel 2 existing bathrooms, new lighting to be high efficency, manual or on auto off switch. move location of washer/dryer. no structural work. | $40,000 |
| Feb 14, 2008 | Completed final sign-off Jun 2008 | 246 28th Av | cosmetic remodel of kitchen and 3 baths. change out door. no moving of walls. upgrade 2 windows on back of house. call work on 1st & 2nd floor.Details
cosmetic remodel of kitchen and 3 baths. change out door. no moving of walls. upgrade 2 windows on back of house. call work on 1st & 2nd floor. | $52,000 |
| Nov 15, 2007 | Completed final sign-off Jan 2008 | 2705 Buchanan St | remodel (e) bathroom on 2nd floor. no lighting change.Details
remodel (e) bathroom on 2nd floor. no lighting change. | $16,000 |
| Feb 16, 2007 | Completed final sign-off Dec 2007 | 2555 Filbert St | interior remodel of 1 bedroom and 2 bathroomsDetails
interior remodel of 1 bedroom and 2 bathrooms | $45,000 |
| Oct 14, 2005 | Completed final sign-off Aug 2007 | 2454 Francisco St | transfer an upper unit flat to a garden unit flat.combine 2 upper floors into 1 flat-unit count maintained.mechanical renovation (plumbing,electrical htg.)horizontal extension at all levels.new baths & kitchens throughout,laundry added to lower unit & upper unit.add new rear deck & stairs from middlDetails
transfer an upper unit flat to a garden unit flat.combine 2 upper floors into 1 flat-unit count maintained.mechanical renovation (plumbing,electrical htg.)horizontal extension at all levels.new baths & kitchens throughout,laundry added to lower unit & upper unit.add new rear deck & stairs from middl | $280,000 |
| Jul 13, 2005 | Expired or cancelled expired Jan 2007 | 2746 Buchanan St | remodel two (e) bathrooms on main floor (2nd ) (tile /fixtures, lighting/painting). removal of wineDetails
remodel two (e) bathrooms on main floor (2nd ) (tile /fixtures, lighting/painting). removal of wine | $32,000 |
| Apr 19, 2004 | Completed final sign-off Nov 2004 | 2572 Greenwich St | interior remodel of (e)structure,kitchen,2 bathrooms & cosmetic work.no removal of bearing wall.Details
interior remodel of (e)structure,kitchen,2 bathrooms & cosmetic work.no removal of bearing wall. | $287,400 |
| Dec 6, 2001 | Completed final sign-off Feb 2002 | 3122 Steiner St | remodel kitchen 1 bath. no strutural work, no change wallsDetails
remodel kitchen 1 bath. no strutural work, no change walls | $60,000 |
| May 23, 2001 | Completed final sign-off May 2001 | 64 Pleasant St | renea pa#919350 kitchen & front bathroom remodel & finala inpsectionDetails
renea pa#919350 kitchen & front bathroom remodel & finala inpsection | |
| Oct 27, 2000 | Completed final sign-off Jul 2001 | 2121 Divisadero St | dry rot repair, int. demo of existing kitchen and 2 bathroomsDetails
dry rot repair, int. demo of existing kitchen and 2 bathrooms | $2,000 |
| Aug 22, 2000 | Completed final sign-off May 2001 | 64 Pleasant St | remodel kitchen & front bathroom,install over bath 2'x2' skylight,trim & sheetrock repair 18' fr proDetails
remodel kitchen & front bathroom,install over bath 2'x2' skylight,trim & sheetrock repair 18' fr pro | $22,600 |