Block 0945, lot 017
2555 Filbert St
- City’s use
- Single Family Residential
- Built
- 1930
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 3,300 sq ft
- Lot
- 3,584 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Feb 7, 2025 | Completed final sign-off Aug 2025 | 2555 Filbert St | Maap Corp Dba Save Energy Co | replace (1) entry door and (1) window, in kind. entry door is wood and window is aluminum clad wood. nail finish install. no change to size or loction. street visible. u-factor 0.30Details
replace (1) entry door and (1) window, in kind. entry door is wood and window is aluminum clad wood. nail finish install. no change to size or loction. street visible. u-factor 0.30 | $11,524 |
| Oct 24, 2024 | Completed final sign-off Apr 2025 | 2555 Filbert St | Maap Corp Dba Save Energy Co | replace (14) windows in-kind with aluminum wood clad window, tempered. nail fin frame installation. u factor <.30 street visible. no change to size or location.Details
replace (14) windows in-kind with aluminum wood clad window, tempered. nail fin frame installation. u factor <.30 street visible. no change to size or location. | $56,477 |
| Feb 7, 2018 | Completed final sign-off Oct 2018 | 2555 Filbert St | Macgyver Construction Inc | remodel (e) master bath and (e) guest bath. provide new cabinets and new island for (e) kitchen, replace 1 fireplace with gas. remove elevator and infill space for master bathDetails
remodel (e) master bath and (e) guest bath. provide new cabinets and new island for (e) kitchen, replace 1 fireplace with gas. remove elevator and infill space for master bath | $40,000 |
| Jan 5, 2018 | Completed final sign-off Oct 2018 | 2555 Filbert St | Macgyver Construction Inc | remodel of a existing kitchen island onlyDetails
remodel of a existing kitchen island only | $6,000 |
| Sep 9, 2016 | Never finaled issued May 2017, no final | 2555 Filbert St | street spaceDetails
street space | ||
| Aug 2, 2016 | Completed final sign-off Oct 2016 | 2555 Filbert St | Sassoon Construction | remodel 2 bathrooms; replace vanity sinks, floor finishes, tub tiles; relocate two gfiplugs; replace standup shower with new shower pans. toilets to remain. no structural work.Details
remodel 2 bathrooms; replace vanity sinks, floor finishes, tub tiles; relocate two gfiplugs; replace standup shower with new shower pans. toilets to remain. no structural work. | $25,000 |
| Sep 19, 2007 | Never finaled issued Sep 2007, no final | 2555 Filbert St | street spaceDetails
street space | ||
| Jun 15, 2007 | Completed final sign-off Jan 2008 | 2555 Filbert St | Hammerhead Construction | remodel kitchen. replace extg windows and extg doors at rear(from single glazing to double glazing). replace extg exterior siding with shingle siding at rearDetails
remodel kitchen. replace extg windows and extg doors at rear(from single glazing to double glazing). replace extg exterior siding with shingle siding at rear | $105,000 |
| Feb 16, 2007 | Completed final sign-off Dec 2007 | 2555 Filbert St | Hammerhead Construction | interior remodel of 1 bedroom and 2 bathroomsDetails
interior remodel of 1 bedroom and 2 bathrooms | $45,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Hammerhead Construction (2), Maap Corp Dba Save Energy Co (2), Macgyver Construction Inc (2), Sassoon Construction
- Architects
- David Teeters
- Engineers
- Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.