H Y Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to May 2026
- Last 24 months
- 6 permits filed
91 permits since 2000: 61 completed, 5 in progress, 17 never finaled, 8 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 7 completed, 1 never finaled. Typically 6 days from filing to permit and 27 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 5, 2017 | Completed final sign-off Oct 2017 | 2443 16th Av | 1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light wellDetails
1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light well | $12,000 |
| Nov 14, 2016 | Completed final sign-off Nov 2016 | 633 South Van Ness Av | to comply with nov 201644441, rear stair repair , not to exceed 50% of structure.Details
to comply with nov 201644441, rear stair repair , not to exceed 50% of structure. | $4,000 |
| Oct 14, 2016 | Never finaled issued Aug 2017, no final | 172 Beaumont Av | gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony &Details
gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony & | $410,000 |
| Sep 16, 2016 | Completed final sign-off Oct 2016 | 633 South Van Ness Av | to comply with nov 201628821 #2&3 nov 201600021 #2&3,nov 201612361 #2.in hallway, 1-hour fire rated, repair stair at front entry (small hole), replace 2 windows, install wall heater & wall patching.Details
to comply with nov 201628821 #2&3 nov 201600021 #2&3,nov 201612361 #2.in hallway, 1-hour fire rated, repair stair at front entry (small hole), replace 2 windows, install wall heater & wall patching. | $7,000 |
| Apr 11, 2014 | Completed final sign-off May 2014 | 118 Ortega St | repair, replace termite damage & dry rot at both (e) wood balconies, stairs in back. painting interior front.Details
repair, replace termite damage & dry rot at both (e) wood balconies, stairs in back. painting interior front. | $3,500 |
| Sep 19, 2012 | Completed final sign-off Feb 2013 | 1886 18th Av | construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain.Details
construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain. | $60,000 |
| Nov 10, 2011 | Completed final sign-off Dec 2011 | 4329 23rd St | repair & replace dryrot for rear deck and stairs, less than 50% repair in kind.Details
repair & replace dryrot for rear deck and stairs, less than 50% repair in kind. | $5,000 |
| Apr 18, 2008 | Completed final sign-off Apr 2010 | 3842 26th St | front exterior stair reconfiguration. kithen at 1st floor to be remodeld. basement remodel. subterranean horizontal addition, within existing req rear yard at basementDetails
front exterior stair reconfiguration. kithen at 1st floor to be remodeld. basement remodel. subterranean horizontal addition, within existing req rear yard at basement | $375,000 |