Back to bathroom remodel contractors
H Y Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to May 2026
- Last 24 months
- 6 permits filed
91 permits since 2000: 61 completed, 5 in progress, 17 never finaled, 8 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
29 bathroom remodel permits: 24 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 1 days from filing to permit and 164 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Apr 2026 | 290 18th Av | kitchen remodeling and bathroom remodeling in kind, replace existing electrical wiring and wall patching.Details
kitchen remodeling and bathroom remodeling in kind, replace existing electrical wiring and wall patching. | $65,000 |
| Nov 3, 2025 | Completed final sign-off Dec 2025 | 672 17th Av | remodeling bathroom: replace plumbing fixtures, tiles, install one fan, install electrical outletDetails
remodeling bathroom: replace plumbing fixtures, tiles, install one fan, install electrical outlet | $9,000 |
| May 23, 2022 | Completed final sign-off Sep 2022 | 453 Cabrillo St | kitchen, bathroom, remodeling, interior painting, replace kitchen cabinets. replacement & remodeling in kind; no change to wall layout or floor plans.Details
kitchen, bathroom, remodeling, interior painting, replace kitchen cabinets. replacement & remodeling in kind; no change to wall layout or floor plans. | $55,000 |
| May 23, 2022 | Completed final sign-off Sep 2022 | 451 Cabrillo St | kitchen, bathroom remodeling, replace kitchen cabinets; replacement and remodeling in kind; no change to wall layout or floor plans.Details
kitchen, bathroom remodeling, replace kitchen cabinets; replacement and remodeling in kind; no change to wall layout or floor plans. | $55,000 |
| Oct 18, 2021 | Completed final sign-off May 2022 | 4730 California St | kitchen & bathroom remodeling. wall and ceiling patching, interior painting and floor refinish. no structual work. no framing modifications.Details
kitchen & bathroom remodeling. wall and ceiling patching, interior painting and floor refinish. no structual work. no framing modifications. | $60,000 |
| Jun 8, 2020 | Completed final sign-off Jun 2021 | 2426 Cabrillo St | kitchen and bathroom remodel. add one powder room . all work is on 2nd floor unit.Details
kitchen and bathroom remodel. add one powder room . all work is on 2nd floor unit. | $35,000 |
| Feb 7, 2020 | Completed final sign-off Mar 2020 | 1346 46th Av | to comply with nov 201953512 and planning code enforcement case no. 2019-007054enf - unpermited bathroom & kitchen remodel; ground fl remove wet bars (sink & cabinets)Details
to comply with nov 201953512 and planning code enforcement case no. 2019-007054enf - unpermited bathroom & kitchen remodel; ground fl remove wet bars (sink & cabinets) | $10,000 |
| May 15, 2019 | Completed final sign-off Dec 2020 | 459 Crestmont Dr | add one new unit to portion of the 2nd flr. renovate basement, first and second flrs to include reconfiguration of 1st flr bath. comply with planning enforcement 2018089068enfDetails
add one new unit to portion of the 2nd flr. renovate basement, first and second flrs to include reconfiguration of 1st flr bath. comply with planning enforcement 2018089068enf | $65,000 |
| Jan 16, 2018 | Completed final sign-off Mar 2018 | 1377 18th Av | unit #1: kitchen and bathroom remodel. replace cabinets all plumbing and electrical fixtures. no change in walls.Details
unit #1: kitchen and bathroom remodel. replace cabinets all plumbing and electrical fixtures. no change in walls. | $20,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2019 | 459 Crestmont Dr | interior renovations at 3rd/4th fl to include reconfig 4th fl to create 3 bedrms, 2 baths, reconfigure 3rd fl to expand kitchen area in e adjacent rm. add window rth fl frontDetails
interior renovations at 3rd/4th fl to include reconfig 4th fl to create 3 bedrms, 2 baths, reconfigure 3rd fl to expand kitchen area in e adjacent rm. add window rth fl front | $125,000 |
| Apr 20, 2017 | Completed final sign-off May 2022 | 163 10th Av | horizontal addition on 3 floors. add home office 1st floor, extend family room and deck on 2nd floor. extend bedroom 3rd floor. add additional bath. rebuild 2 existing baths.Details
horizontal addition on 3 floors. add home office 1st floor, extend family room and deck on 2nd floor. extend bedroom 3rd floor. add additional bath. rebuild 2 existing baths. | $150,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2017 | 81 Lopez Av | existing kitchen, bathroom to be remodel. replace cabinets & fixtures, re-finish electrical & lightings. remove/replace dryrot w/ new in (e) nook, (wall & roof).Details
existing kitchen, bathroom to be remodel. replace cabinets & fixtures, re-finish electrical & lightings. remove/replace dryrot w/ new in (e) nook, (wall & roof). | $32,000 |
| Jan 3, 2017 | Completed final sign-off Mar 2017 | 70 Mendosa Av | bathroom & kitchen remodel; replace tile plumbing fixtures, electrical fixtures and vanity cabinet. replace cabinets, counter top, floor tile, plumbing, electrical fixtures & replace 3 windows; u factor .32Details
bathroom & kitchen remodel; replace tile plumbing fixtures, electrical fixtures and vanity cabinet. replace cabinets, counter top, floor tile, plumbing, electrical fixtures & replace 3 windows; u factor .32 | $45,000 |
| Jul 14, 2016 | Completed final sign-off May 2019 | 1270 46th Av | legalize as build unit on 1/f (include 2 bedrms, 1 full bath, living room and kitchen. add new fire escape ladder at rear of building (unit legalization ordinance 43-14)Details
legalize as build unit on 1/f (include 2 bedrms, 1 full bath, living room and kitchen. add new fire escape ladder at rear of building (unit legalization ordinance 43-14) | $10,000 |
| Sep 24, 2015 | Completed final sign-off Feb 2016 | 569 Holyoke St | to comply with complaint 2015 68731: 1st floor: convert (e) spaces to have 1 bedroom, a guest room, an exercise room and a full bath. 2nd floor: remodel (e) kitchen, 2 bathrooms.Details
to comply with complaint 2015 68731: 1st floor: convert (e) spaces to have 1 bedroom, a guest room, an exercise room and a full bath. 2nd floor: remodel (e) kitchen, 2 bathrooms. | $58,000 |
| Aug 28, 2015 | Never finaled issued Dec 2018, no final | 227 Noriega St | horizontal & vertical addition. add 2nd dwelling unit on 3rd. 1/fl-2 car garage, entertainment room, full bath. 2/fl:add full bath. 3/fl:(n) kitchen, living room, dining, 2 baths, 2 bedrooms & 1 deck at rear.Details
horizontal & vertical addition. add 2nd dwelling unit on 3rd. 1/fl-2 car garage, entertainment room, full bath. 2/fl:add full bath. 3/fl:(n) kitchen, living room, dining, 2 baths, 2 bedrooms & 1 deck at rear. | $50,000 |
| Mar 20, 2015 | Completed final sign-off Dec 2015 | 1654 27th Av | kitchen and bathroom renovation; (n) insulation (n) lighting througout,(n) radiant heat in bathrooms; replace all windows in kind not visible from street, (n) drywall on 1 st flr; (n) skylight. infill lightwells @ both north & south property lines.Details
kitchen and bathroom renovation; (n) insulation (n) lighting througout,(n) radiant heat in bathrooms; replace all windows in kind not visible from street, (n) drywall on 1 st flr; (n) skylight. infill lightwells @ both north & south property lines. | $35,000 |
| Jul 9, 2014 | Never finaled issued Jul 2014, no final | 1821 15th St | unit #11. bathroom, remodeling, replace tile, vanity cabinet, plumbing fixtures, fan, bath tub, toilet & painting.Details
unit #11. bathroom, remodeling, replace tile, vanity cabinet, plumbing fixtures, fan, bath tub, toilet & painting. | $7,000 |
| Sep 19, 2012 | Completed final sign-off Feb 2013 | 1886 18th Av | construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain.Details
construction of 2 bedrooms, 1 full bathroom on partial garage conversion. remove (e) exterior side stair, landing and supports to remain. | $60,000 |
| Jul 21, 2011 | Completed final sign-off Oct 2011 | 240 Hazelwood Av | remodel bathroom, kitchen @ 2/f, no structural work, (n) lighting comply with cec150(k)Details
remodel bathroom, kitchen @ 2/f, no structural work, (n) lighting comply with cec150(k) | $15,000 |
| May 16, 2011 | Completed final sign-off Dec 2011 | 718 Geneva Av | add two bedrooms, one full bathroom, one storage & laundry on existing ground floor.Details
add two bedrooms, one full bathroom, one storage & laundry on existing ground floor. | $38,000 |
| Jul 13, 2010 | Never finaled issued Aug 2010, no final | 2200 Mariposa St | addition of bedroom, bath, closets, and replace furnace. new gas fireplace.Details
addition of bedroom, bath, closets, and replace furnace. new gas fireplace. | $45,000 |
| Jun 1, 2010 | Completed final sign-off Apr 2011 | 130 Delano Av | add 2 bedrooms, 1 play room, 1 full bathroom & laundry area on (e) ground floor per planDetails
add 2 bedrooms, 1 play room, 1 full bathroom & laundry area on (e) ground floor per plan | $32,000 |
| Apr 27, 2010 | Completed final sign-off Nov 2010 | 407 40th Av | fill in space under 2nd fl bedroom and to add two bedrooms, one full bath and laundry at ground/ first floor.Details
fill in space under 2nd fl bedroom and to add two bedrooms, one full bath and laundry at ground/ first floor. | $30,000 |
| Mar 10, 2010 | Completed final sign-off Jul 2011 | 1379 37th Av | remodeling bathroom, replace tile, replace plumbing fixtures, electrical fixtures, one bathroom only) no structural work lighting per cec 150 (k)Details
remodeling bathroom, replace tile, replace plumbing fixtures, electrical fixtures, one bathroom only) no structural work lighting per cec 150 (k) | $8,000 |
| Dec 3, 2009 | Completed final sign-off Feb 2010 | 50 Rome St | to add 2 bedrooms, 1 full bathroom, one storage & laundry area on existing ground floor per plan.Details
to add 2 bedrooms, 1 full bathroom, one storage & laundry area on existing ground floor per plan. | $40,000 |
| Jul 23, 2008 | Expired or cancelled expired Oct 2009 | 2742 25th St | to include remodel kitchens & bathrooms. need to increase estimate original $17,000- increase $71,000 - total $88,000. appl #200708220556.Details
to include remodel kitchens & bathrooms. need to increase estimate original $17,000- increase $71,000 - total $88,000. appl #200708220556. | $71,000 |
| Dec 20, 2006 | Completed final sign-off Jun 2007 | 3220 Jennings St | to add one playroom, one laundry room, storage, three bedroom, 2 full bathrooms on existing ground floor. foundation work per ground floor plan.Details
to add one playroom, one laundry room, storage, three bedroom, 2 full bathrooms on existing ground floor. foundation work per ground floor plan. | $38,000 |
| Nov 6, 2006 | Completed final sign-off Feb 2007 | 625 Bacon St | add three bedroom, one full bathroom, one laundry room & storage on (e) ground floor per plan.Details
add three bedroom, one full bathroom, one laundry room & storage on (e) ground floor per plan. | $26,000 |