Back to kitchen remodel contractors
H Y Construction Inc.
- Based in
- San Francisco
- On San Francisco permits
- Mar 2005 to May 2026
- Last 24 months
- 6 permits filed
91 permits since 2000: 61 completed, 5 in progress, 17 never finaled, 8 expired or cancelled.
Of the 17 never-finaled permits, 3 are 3 to 5 years old, 4 are 5 to 10 years old, 10 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
28 kitchen remodel permits: 23 completed, 1 in progress, 3 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 112 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2026 | In progress issued Apr 2026 | 290 18th Av | kitchen remodeling and bathroom remodeling in kind, replace existing electrical wiring and wall patching.Details
kitchen remodeling and bathroom remodeling in kind, replace existing electrical wiring and wall patching. | $65,000 |
| Apr 29, 2024 | Completed final sign-off Jun 2024 | 5 Santa Ysabel Av | kitchen remodeling. replace kitchen cabinets. wall patching and painting. no new wall and existing wall relocation.Details
kitchen remodeling. replace kitchen cabinets. wall patching and painting. no new wall and existing wall relocation. | $20,000 |
| Mar 5, 2024 | Completed final sign-off Jun 2024 | 672 17th Av | kitchen remodel. replace kitchen cabinets. drywall. painting. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3.Details
kitchen remodel. replace kitchen cabinets. drywall. painting. no new wall and no existing wall relocation. new lighting shall comply with cec 150.0(k)3. | $16,000 |
| May 23, 2022 | Completed final sign-off Sep 2022 | 453 Cabrillo St | kitchen, bathroom, remodeling, interior painting, replace kitchen cabinets. replacement & remodeling in kind; no change to wall layout or floor plans.Details
kitchen, bathroom, remodeling, interior painting, replace kitchen cabinets. replacement & remodeling in kind; no change to wall layout or floor plans. | $55,000 |
| May 23, 2022 | Completed final sign-off Sep 2022 | 451 Cabrillo St | kitchen, bathroom remodeling, replace kitchen cabinets; replacement and remodeling in kind; no change to wall layout or floor plans.Details
kitchen, bathroom remodeling, replace kitchen cabinets; replacement and remodeling in kind; no change to wall layout or floor plans. | $55,000 |
| Oct 25, 2021 | Completed final sign-off Sep 2022 | 1042 Haight St | interior remodel of unit #2: relocate kitchen and add bedroom. add bedroom closet.Details
interior remodel of unit #2: relocate kitchen and add bedroom. add bedroom closet. | $25,000 |
| Oct 18, 2021 | Completed final sign-off May 2022 | 4730 California St | kitchen & bathroom remodeling. wall and ceiling patching, interior painting and floor refinish. no structual work. no framing modifications.Details
kitchen & bathroom remodeling. wall and ceiling patching, interior painting and floor refinish. no structual work. no framing modifications. | $60,000 |
| Mar 23, 2021 | Completed final sign-off Dec 2023 | 1656 Sanchez St | remodel kitchen. replace & add more cabinets, replace countertop & appliances. no wall demo. remove ventless fireplace cabinets, fill in the wall. install floor finish. no structural work. no layout changeDetails
remodel kitchen. replace & add more cabinets, replace countertop & appliances. no wall demo. remove ventless fireplace cabinets, fill in the wall. install floor finish. no structural work. no layout change | $30,000 |
| Jun 8, 2020 | Completed final sign-off Jun 2021 | 2426 Cabrillo St | kitchen and bathroom remodel. add one powder room . all work is on 2nd floor unit.Details
kitchen and bathroom remodel. add one powder room . all work is on 2nd floor unit. | $35,000 |
| Feb 7, 2020 | Completed final sign-off Mar 2020 | 1346 46th Av | to comply with nov 201953512 and planning code enforcement case no. 2019-007054enf - unpermited bathroom & kitchen remodel; ground fl remove wet bars (sink & cabinets)Details
to comply with nov 201953512 and planning code enforcement case no. 2019-007054enf - unpermited bathroom & kitchen remodel; ground fl remove wet bars (sink & cabinets) | $10,000 |
| Nov 21, 2018 | Completed final sign-off Feb 2019 | 4 Rossi Av | remodel kitchen. remove and install cabinets and drywall.Details
remodel kitchen. remove and install cabinets and drywall. | $20,000 |
| Jan 16, 2018 | Completed final sign-off Mar 2018 | 1377 18th Av | unit #1: kitchen and bathroom remodel. replace cabinets all plumbing and electrical fixtures. no change in walls.Details
unit #1: kitchen and bathroom remodel. replace cabinets all plumbing and electrical fixtures. no change in walls. | $20,000 |
| Nov 20, 2017 | Completed final sign-off Feb 2019 | 459 Crestmont Dr | interior renovations at 3rd/4th fl to include reconfig 4th fl to create 3 bedrms, 2 baths, reconfigure 3rd fl to expand kitchen area in e adjacent rm. add window rth fl frontDetails
interior renovations at 3rd/4th fl to include reconfig 4th fl to create 3 bedrms, 2 baths, reconfigure 3rd fl to expand kitchen area in e adjacent rm. add window rth fl front | $125,000 |
| Jun 5, 2017 | Completed final sign-off Oct 2017 | 2443 16th Av | 1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light wellDetails
1st floor - removal of service staircase. 2nd floor - removal of non-load bearing wall; enlargement of 2 interior doorways, kitchen remodel, removal of exterior service door, replacement of existing windows with clad garden windows in light well | $12,000 |
| Jan 17, 2017 | Completed final sign-off Jun 2017 | 81 Lopez Av | existing kitchen, bathroom to be remodel. replace cabinets & fixtures, re-finish electrical & lightings. remove/replace dryrot w/ new in (e) nook, (wall & roof).Details
existing kitchen, bathroom to be remodel. replace cabinets & fixtures, re-finish electrical & lightings. remove/replace dryrot w/ new in (e) nook, (wall & roof). | $32,000 |
| Jan 3, 2017 | Completed final sign-off Mar 2017 | 70 Mendosa Av | bathroom & kitchen remodel; replace tile plumbing fixtures, electrical fixtures and vanity cabinet. replace cabinets, counter top, floor tile, plumbing, electrical fixtures & replace 3 windows; u factor .32Details
bathroom & kitchen remodel; replace tile plumbing fixtures, electrical fixtures and vanity cabinet. replace cabinets, counter top, floor tile, plumbing, electrical fixtures & replace 3 windows; u factor .32 | $45,000 |
| Oct 14, 2016 | Never finaled issued Aug 2017, no final | 172 Beaumont Av | gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony &Details
gut renov&698 sf.rooftop addition at rear of(e)3,970 sf.(incl garage).2 story sfr. struct incl seismic upgrade,mech, elec/liteg&plumb wrk.(n)elevator,stair,replace(e)kitchen & replace 3 bathrms on 1/f&2/f;add 1 bathrm on top flr.cabinetry,flr,ceiling&wall finishes,rooftop deck,rear balcony & | $410,000 |
| Jul 14, 2016 | Completed final sign-off May 2019 | 1270 46th Av | legalize as build unit on 1/f (include 2 bedrms, 1 full bath, living room and kitchen. add new fire escape ladder at rear of building (unit legalization ordinance 43-14)Details
legalize as build unit on 1/f (include 2 bedrms, 1 full bath, living room and kitchen. add new fire escape ladder at rear of building (unit legalization ordinance 43-14) | $10,000 |
| Mar 25, 2016 | Never finaled issued Mar 2016, no final | 1231 28th Av | kitchen remodel: replace cabinets, floor, plumbing fixtures. electrical work, gas line.Details
kitchen remodel: replace cabinets, floor, plumbing fixtures. electrical work, gas line. | $20,000 |
| Feb 17, 2016 | Completed final sign-off Apr 2016 | 527 Holyoke St | in 1st floor add new exterior wall. in 2nd floor remodel extg kitchen.Details
in 1st floor add new exterior wall. in 2nd floor remodel extg kitchen. | $20,000 |
| Sep 24, 2015 | Completed final sign-off Feb 2016 | 569 Holyoke St | to comply with complaint 2015 68731: 1st floor: convert (e) spaces to have 1 bedroom, a guest room, an exercise room and a full bath. 2nd floor: remodel (e) kitchen, 2 bathrooms.Details
to comply with complaint 2015 68731: 1st floor: convert (e) spaces to have 1 bedroom, a guest room, an exercise room and a full bath. 2nd floor: remodel (e) kitchen, 2 bathrooms. | $58,000 |
| Aug 28, 2015 | Never finaled issued Dec 2018, no final | 227 Noriega St | horizontal & vertical addition. add 2nd dwelling unit on 3rd. 1/fl-2 car garage, entertainment room, full bath. 2/fl:add full bath. 3/fl:(n) kitchen, living room, dining, 2 baths, 2 bedrooms & 1 deck at rear.Details
horizontal & vertical addition. add 2nd dwelling unit on 3rd. 1/fl-2 car garage, entertainment room, full bath. 2/fl:add full bath. 3/fl:(n) kitchen, living room, dining, 2 baths, 2 bedrooms & 1 deck at rear. | $50,000 |
| Mar 20, 2015 | Completed final sign-off Dec 2015 | 1654 27th Av | kitchen and bathroom renovation; (n) insulation (n) lighting througout,(n) radiant heat in bathrooms; replace all windows in kind not visible from street, (n) drywall on 1 st flr; (n) skylight. infill lightwells @ both north & south property lines.Details
kitchen and bathroom renovation; (n) insulation (n) lighting througout,(n) radiant heat in bathrooms; replace all windows in kind not visible from street, (n) drywall on 1 st flr; (n) skylight. infill lightwells @ both north & south property lines. | $35,000 |
| Jul 21, 2011 | Completed final sign-off Oct 2011 | 240 Hazelwood Av | remodel bathroom, kitchen @ 2/f, no structural work, (n) lighting comply with cec150(k)Details
remodel bathroom, kitchen @ 2/f, no structural work, (n) lighting comply with cec150(k) | $15,000 |
| Jun 21, 2010 | Completed final sign-off Aug 2010 | 1886 18th Av | remodeling kitchen-replace cabinets, plumbing fixtures, electrical work, wall patching, painting. kitchen 10x12 unneath cabinet lightingDetails
remodeling kitchen-replace cabinets, plumbing fixtures, electrical work, wall patching, painting. kitchen 10x12 unneath cabinet lighting | $20,159 |
| May 3, 2010 | Completed final sign-off Apr 2011 | 1379 37th Av | remodeling kitchen, replace cabinets, plmbg fixtures, electrical fixtures, front of house.romove stucco. replace dryrot restucco and painting. lighting fixtures to comply with title 24 energy code.Details
remodeling kitchen, replace cabinets, plmbg fixtures, electrical fixtures, front of house.romove stucco. replace dryrot restucco and painting. lighting fixtures to comply with title 24 energy code. | $22,000 |
| Jan 27, 2009 | Completed final sign-off Apr 2009 | 1320 Clement St | replace kitchen cabinets, counter top, drywall, floor and plumbing fixtures. electrical fixturesDetails
replace kitchen cabinets, counter top, drywall, floor and plumbing fixtures. electrical fixtures | $12,000 |
| Jul 23, 2008 | Expired or cancelled expired Oct 2009 | 2742 25th St | to include remodel kitchens & bathrooms. need to increase estimate original $17,000- increase $71,000 - total $88,000. appl #200708220556.Details
to include remodel kitchens & bathrooms. need to increase estimate original $17,000- increase $71,000 - total $88,000. appl #200708220556. | $71,000 |