H T Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Apr 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 25 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
5 stairs permits: 5 completed. Typically 0 days from filing to permit and 356 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 17, 2015 | Completed final sign-off May 2017 | 46 Wilder St | revision to 201502067738 si: relocate stairs, laundry & bath on 1/f, relocate stairs, kitchen & bath, add den, skylight & level (e) floor on 2/f, replace (e) alum windows with wood & match 1/2" mullion on adjacent with w/true divided lites in wood. replace (e) plaster wall with 5/8" type v dry wallDetails
revision to 201502067738 si: relocate stairs, laundry & bath on 1/f, relocate stairs, kitchen & bath, add den, skylight & level (e) floor on 2/f, replace (e) alum windows with wood & match 1/2" mullion on adjacent with w/true divided lites in wood. replace (e) plaster wall with 5/8" type v dry wall | $100,000 |
| Jan 20, 2015 | Completed final sign-off Mar 2015 | 3958 Cesar Chavez St | revision to appl. 2014.1211.3574. provide plan for stair at front. repair in kind. maher n/a. dryrot repair in kind. stair header, two joists post.Details
revision to appl. 2014.1211.3574. provide plan for stair at front. repair in kind. maher n/a. dryrot repair in kind. stair header, two joists post. | $3,800 |
| Dec 11, 2014 | Completed final sign-off Mar 2015 | 3958 Cesar Chavez St | replace dryrot house front stairs in kind. less than 50%Details
replace dryrot house front stairs in kind. less than 50% | $3,800 |
| Feb 13, 2014 | Completed final sign-off Feb 2015 | 522 08th Av | at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans.Details
at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans. | $40,000 |
| Nov 8, 2013 | Completed final sign-off Jun 2016 | 568 29th St | vertical & horizontal rear addition of (e) bldg. add a master suite, rear deck & roof deck w/ stair. remodel (e) kitchen & relocate (e) bath as per plan.Details
vertical & horizontal rear addition of (e) bldg. add a master suite, rear deck & roof deck w/ stair. remodel (e) kitchen & relocate (e) bath as per plan. | $150,000 |