Block 1550, lot 045
522 08th Ave
- City’s use
- Multi-Family Residential
- Built
- 1904
- Stories
- 3
- Units
- 2
- Rooms
- 6 bedrooms, 6 bathrooms
- Building
- 3,346 sq ft
- Lot
- 2,996 sq ft
- Zoning
- RH2
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
10 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jul 22, 2022 | Completed final sign-off Mar 2023 | 522 08th Av | T & W Construction Co Inc | rev to permit 201310310802 and 202203149984. convent 2nd flr rood to rood deck w/ 42" wood guardrail; remove half bath for new furnace and change siding to stucco.Details
rev to permit 201310310802 and 202203149984. convent 2nd flr rood to rood deck w/ 42" wood guardrail; remove half bath for new furnace and change siding to stucco. | $5,000 |
| Mar 14, 2022 | Completed final sign-off Mar 2023 | 522 08th Av | T & W Construction Co Inc | to final p.a. 201310310802 and pa 201801037733. all work is complete.Details
to final p.a. 201310310802 and pa 201801037733. all work is complete. | |
| Sep 14, 2018 | Never finaled issued Sep 2018, no final | 524 08th Av | per pa #201310310802, add address to 2nd unit at rear of building at block 1550, lot 045 as; 524 8th ave.Details
per pa #201310310802, add address to 2nd unit at rear of building at block 1550, lot 045 as; 524 8th ave. | ||
| Mar 27, 2018 | Never finaled issued Mar 2018, no final | 522 08th Av | street spaceDetails
street space | ||
| Jan 3, 2018 | Expired or cancelled expired Mar 2022 | 522 08th Av | 1st fl, garage level, remove e beam and post and install new steel beam maher not reqDetails
1st fl, garage level, remove e beam and post and install new steel beam maher not req | $8,000 | |
| Aug 14, 2017 | Never finaled issued Aug 2017, no final | 522 08th Av | street spaceDetails
street space | ||
| Feb 13, 2014 | Completed final sign-off Feb 2015 | 522 08th Av | H T Contractors Inc | at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans.Details
at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans. | $40,000 |
| Oct 31, 2013 | Expired or cancelled expired Mar 2022 | 522 08th Av | vertical & horizontal rear addition of (e) building. convert single family dwelling to 2 units building.Details
vertical & horizontal rear addition of (e) building. convert single family dwelling to 2 units building. | $180,000 | |
| Sep 29, 2011 | Completed final sign-off Feb 2015 | 522 08th Av | replace top cap trim supporting handrail for front stairs, replace less than 50% of existing redwood siding next to parapet (approx 18 sq ft), replace water/wood rot fascia (less than 50% of existing fascia)Details
replace top cap trim supporting handrail for front stairs, replace less than 50% of existing redwood siding next to parapet (approx 18 sq ft), replace water/wood rot fascia (less than 50% of existing fascia) | $4,500 | |
| Sep 28, 2010 | Completed final sign-off Jan 2011 | 522 08th Av | repair rear stairways and reuse any boards, replace 2 risers and hand rails less than 50% repairDetails
repair rear stairways and reuse any boards, replace 2 risers and hand rails less than 50% repair | $4,300 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- T & W Construction Co Inc (2), H T Contractors Inc
- Architects
- Xie Xing "Bill" Guan
- Engineers
- Bill Guan, William Liang
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover two-family buildings like this one.