Back to bathroom remodel contractors
H T Contractors Inc
- Based in
- San Francisco
- On San Francisco permits
- Nov 2013 to Apr 2025
- Last 24 months
- 1 permit filed
30 permits since 2000: 25 completed, 1 in progress, 4 never finaled.
Of the 4 never-finaled permits, 3 are 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 13 completed, 1 in progress. Typically 0 days from filing to permit and 99 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 20, 2024 | In progress issued Apr 2025 | 486 Head St | add 2 story rear addition for new bedrooms. remodel (e) 1st floor into new wet bar area, bathroom & new family.Details
add 2 story rear addition for new bedrooms. remodel (e) 1st floor into new wet bar area, bathroom & new family. | $150,000 |
| Mar 1, 2022 | Completed final sign-off Jun 2022 | 2444 22nd Av | remodeling the main floor bathroom: new shower pan and faucet: new wall tile and floor tile: new ceiling fan: replace broken window to vinyl window in kind: new vanity and faucet: new toiletDetails
remodeling the main floor bathroom: new shower pan and faucet: new wall tile and floor tile: new ceiling fan: replace broken window to vinyl window in kind: new vanity and faucet: new toilet | $12,000 |
| Sep 19, 2019 | Completed final sign-off Dec 2019 | 1202 Union St | unit #1202 union st. 2nd fl, add two new full bathrooms.Details
unit #1202 union st. 2nd fl, add two new full bathrooms. | $30,000 |
| Mar 8, 2019 | Completed final sign-off May 2019 | 62 Kissling St | repair (e) bathroom shower: change new fiberglass shower pan, fix dryrot at floor, new floor. new glass shower door. all the work interio. no outside work.Details
repair (e) bathroom shower: change new fiberglass shower pan, fix dryrot at floor, new floor. new glass shower door. all the work interio. no outside work. | $10,000 |
| Jun 26, 2018 | Completed final sign-off Aug 2018 | 412 Dorado Tr | bathroom (5'x7') & kitchen (10'x10'). bathroom: replace bathtub, toilet, vanity and tile; kitchen: replace counter top, sink, faucet, applianceDetails
bathroom (5'x7') & kitchen (10'x10'). bathroom: replace bathtub, toilet, vanity and tile; kitchen: replace counter top, sink, faucet, appliance | $18,000 |
| Nov 18, 2016 | Completed final sign-off Dec 2016 | 988 Fulton St | at extg bath add extra 28" door facing the study room.Details
at extg bath add extra 28" door facing the study room. | $1,000 |
| Mar 7, 2016 | Completed final sign-off Feb 2017 | 1235 07th Av | ground fl unit: relocate e kitchena nd bath. relocate water heater and relocate furnace eo basement to comply with nov 201600853Details
ground fl unit: relocate e kitchena nd bath. relocate water heater and relocate furnace eo basement to comply with nov 201600853 | $25,000 |
| Dec 17, 2015 | Completed final sign-off May 2017 | 46 Wilder St | revision to 201502067738 si: relocate stairs, laundry & bath on 1/f, relocate stairs, kitchen & bath, add den, skylight & level (e) floor on 2/f, replace (e) alum windows with wood & match 1/2" mullion on adjacent with w/true divided lites in wood. replace (e) plaster wall with 5/8" type v dry wallDetails
revision to 201502067738 si: relocate stairs, laundry & bath on 1/f, relocate stairs, kitchen & bath, add den, skylight & level (e) floor on 2/f, replace (e) alum windows with wood & match 1/2" mullion on adjacent with w/true divided lites in wood. replace (e) plaster wall with 5/8" type v dry wall | $100,000 |
| Aug 13, 2015 | Completed final sign-off Nov 2015 | 1310 39th Av | lower unit. (e) kitchen & bathroom remodel. new electrical brakes. no structural change.Details
lower unit. (e) kitchen & bathroom remodel. new electrical brakes. no structural change. | $28,000 |
| Aug 13, 2015 | Completed final sign-off Nov 2015 | 1312 39th Av | upper unit. (e) bathroom remodel. new electrical brakes. no structural change.Details
upper unit. (e) bathroom remodel. new electrical brakes. no structural change. | $12,000 |
| Jun 23, 2015 | Completed final sign-off Sep 2015 | 1851 40th Av | extg kitchen and bath room replacement. 1) plumbing fixtures. 2)light fixture, 3)kitchen cabinets. 4)ceramic tile at floor and wall. 5)new light at kitchen. no any structure change.Details
extg kitchen and bath room replacement. 1) plumbing fixtures. 2)light fixture, 3)kitchen cabinets. 4)ceramic tile at floor and wall. 5)new light at kitchen. no any structure change. | $33,000 |
| Apr 20, 2015 | Completed final sign-off Jul 2015 | 61 Germania St | remodel existing bath - replace ceramic tile at floor & wall. replace toilet, sink, bath tub. new circuit for new electrical. new circuit for laundry. no wall will be removed or relocated.Details
remodel existing bath - replace ceramic tile at floor & wall. replace toilet, sink, bath tub. new circuit for new electrical. new circuit for laundry. no wall will be removed or relocated. | $3,000 |
| Feb 13, 2014 | Completed final sign-off Feb 2015 | 522 08th Av | at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans.Details
at 2nd flr new bathroom remodel (e) kitchen, at 3rd flr, remodel (e) bathroom and convert (e) toilet to full bathroom , new electrical panel, outlet fixtures & new wall finish remove interior stair, all work per plans. | $40,000 |
| Nov 8, 2013 | Completed final sign-off Jun 2016 | 568 29th St | vertical & horizontal rear addition of (e) bldg. add a master suite, rear deck & roof deck w/ stair. remodel (e) kitchen & relocate (e) bath as per plan.Details
vertical & horizontal rear addition of (e) bldg. add a master suite, rear deck & roof deck w/ stair. remodel (e) kitchen & relocate (e) bath as per plan. | $150,000 |