H Q Construction
- Based in
- Brisbane
- On San Francisco permits
- May 2019 to Nov 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 1 completed, 2 never finaled. Typically 0 days from filing to permit and 76 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 21, 2020 | Completed final sign-off Mar 2021 | 18 Lucky St | to comply with nov# 201965391. revision to no plan pa# 201909121494. replace existing damaged exterior stairway at rear side of building. for 2nd mean of egress.Details
to comply with nov# 201965391. revision to no plan pa# 201909121494. replace existing damaged exterior stairway at rear side of building. for 2nd mean of egress. | $7,000 |
| Sep 12, 2019 | Never finaled issued Sep 2019, no final | 18 Lucky St | repair fire damage at rear of building; repairing siding, stairs, and window replacement.. to comply with nov# 201965391, second means of egress.Details
repair fire damage at rear of building; repairing siding, stairs, and window replacement.. to comply with nov# 201965391, second means of egress. | $6,800 |
| Jul 1, 2019 | Never finaled issued Jul 2019, no final | 2030 Alemany Bl | amend pa201906264451: add 2nd bathroom remodel in-kind, tilet, floors, walls for shower, replace vanity, toilet, shower pan. remodel upstairs laundry in-kind. move (e) water heater. repair dryrot from back & front stairs as needed (less than 50%).Details
amend pa201906264451: add 2nd bathroom remodel in-kind, tilet, floors, walls for shower, replace vanity, toilet, shower pan. remodel upstairs laundry in-kind. move (e) water heater. repair dryrot from back & front stairs as needed (less than 50%). |