Permit GraphShortlistSan Francisco building permits since 2000

H Q Construction

Contractor license
1025148
State license record
Based in
Brisbane
On San Francisco permits
May 2019 to Nov 2020
Last 24 months
0 permits filed

6 permits since 2000: 2 completed, 4 never finaled.

Of the 4 never-finaled permits, 4 are 5 to 10 years old.

CompletedIn progressNever finaledExpired or cancelled

This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records

Permits filed each year

How long permits take

Median days to final inspection, citywideMedian days to permit issued, citywide

Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.

Bathroom remodel permits

AllStairs 3Kitchen remodel 2Bathroom remodel 2

2 bathroom remodel permits: 2 never finaled. Typically 0 days from filing to permit.

FiledOutcomeAddressWork described on the permitDeclared cost
Jul 1, 2019Never finaled
issued Jul 2019, no final
2030 Alemany Blamend pa201906264451: add 2nd bathroom remodel in-kind, tilet, floors, walls for shower, replace vanity, toilet, shower pan. remodel upstairs laundry in-kind. move (e) water heater. repair dryrot from back & front stairs as needed (less than 50%).
Details
Permit
201907014857
Status
issued
Filed
Jul 1, 2019
Permit issued
Jul 1, 2019
Address
2030 Alemany Bl

amend pa201906264451: add 2nd bathroom remodel in-kind, tilet, floors, walls for shower, replace vanity, toilet, shower pan. remodel upstairs laundry in-kind. move (e) water heater. repair dryrot from back & front stairs as needed (less than 50%).

Open the permit page

Jun 26, 2019Never finaled
issued Jun 2019, no final
2030 Alemany Blremodel kitchen (120 sqft) & bathrooms (80 sqft) in kind. replace cabinets, patch drywall as necessary. tile floors and walls, replace vanity, toilet. remove/replace in kind damaged drywall throughout. electrical: add 90a/220v for kitchen, recessed lighting. new plumbing at kitchen. new split system
Details
Permit
201906264451
Status
issued
Filed
Jun 26, 2019
Permit issued
Jun 26, 2019
Declared cost
$75,000
Address
2030 Alemany Bl

remodel kitchen (120 sqft) & bathrooms (80 sqft) in kind. replace cabinets, patch drywall as necessary. tile floors and walls, replace vanity, toilet. remove/replace in kind damaged drywall throughout. electrical: add 90a/220v for kitchen, recessed lighting. new plumbing at kitchen. new split system

Open the permit page

$75,000